Wood grain melamine wardrobes are made to measure, shipped long distances and then assembled on site by a crew who did not build them. That sequence is where most avoidable problems start: panels that arrive chipped, a set that does not match the opening it was drawn for, or an installer standing in front of unlabelled boards. Before a purchase order is placed, agree in writing how the wardrobes will be protected, identified and delivered.
Start with how the wardrobe is built, because that decides how it travels
Our Wood Grain Melamine Wardrobes are made-to-measure: sizing, layout, material and finish are specified per project rather than picked from a fixed catalogue. A fully assembled fitted wardrobe rarely travels well overseas, so built-in joinery of this type is normally shipped in knocked-down form — carcass panels, doors, shelf boards and hardware — and assembled where it will stand. Ask which method applies to your set, and ask for it in the same drawing you sign off.
Two practical consequences follow. First, panel edges and melamine faces are the parts most likely to be damaged in transit, so edge protection matters as much as the outer case. Second, a knocked-down wardrobe is only workable if every component can be matched to a drawing without guesswork.
Confirm the protective materials and the packing standard
Ask your supplier to state what physically surrounds each component, not simply that goods are "export packed". For melamine-faced panels and doors we normally use:
- Edge and corner protection on every exposed panel edge, so impact lands on the protector rather than the melamine face.
- Surface interleaving between faces of stacked panels, to stop abrasion and transfer marks during road and sea legs.
- A rigid outer case or crate sized to the panel stack, with the load blocked so panels cannot shift inside.
- Hardware packed separately from boards, in bags or boxes labelled against the same component numbers used on the drawings.
- Moisture barriers for the ocean passage, since condensation inside a container is the usual cause of swollen edges and packaging that looks intact while the contents do not.
If your project needs the brand carried through to site — engraved or printed labels, branded cartons, a specific case marking for the client's own documentation — say so at quotation stage. Our Custom & OEM Service covers bespoke finishes and textures as well as branding such as engraving, embossing, logos and packaging, but it has to be specified before production starts.
Agree the marking and identification system before the boxes are sealed
With multi-apartment or multi-floor work, unlabelled crates cause most of the delay on site. The system should be agreed with your site team, then followed exactly.
| What to fix in writing | Why it matters on site |
|---|---|
| Component numbers that match the shop drawings one-to-one | The installer reads a number off the panel and finds it on the drawing — no interpretation, no trial assembly. |
| Case marks naming room, unit or apartment, plus a case count per set | Crates can be sorted into the right dwellings on arrival instead of being opened and searched through. |
| A packing list that repeats those numbers and states contents per case | Shortages are found at delivery, when they can still be replaced, rather than mid-installation. |
| Door and handle sets marked as left-hand, right-hand or reversible | Prevents doors being hung on the wrong carcass and re-worked on site. |
| Fragile, this-side-up and keep-dry markings where they apply | Gives handlers a reason to treat glass inlays, mirrors and pre-finished doors differently. |
Send your site team's preferred labelling format with the order. It is cheap to agree at quotation stage and expensive to retrofit after the cases have left the factory.
Match the packing method to how delivery and installation will actually run
Packing is a logistics decision as much as a protective one. A villa where a single crew installs over several days needs crates that can be staged room by room; an apartment handover with a fixed access window needs cases sorted by dwelling at the point of unloading. Our Logistics & Door-to-Door Delivery service covers freight forwarding by sea, air and rail, packaging and container loading, customs paperwork including commercial invoices, packing lists and certificates of origin, shipment tracking and door-to-door delivery. Confirm for each order the Incoterms being quoted, who arranges unloading at site, and whether crates are removed as part of the delivery or left for your contractor to dispose of.
Also confirm how much floor or storage space the packed volume needs at your site. Knocked-down joinery arrives as flat, heavy cases; a building with a lift of limited depth or a basement with a low ceiling can turn an ordinary delivery into a manual-handling problem. Ask for case dimensions and weights in advance, not on the day.
Put inspection and claims terms into the order
The point of agreeing packaging in advance is that damage becomes visible and actionable. Write into the purchase order:
- What a compliant delivery looks like — case count, undamaged outer cases, legible marks, complete packing list.
- How quickly you will open and inspect after arrival, and what photographs you will provide if something is damaged.
- Who replaces a damaged panel and how the replacement travels, so one chipped door does not hold up a whole handover.
- Whether spare components — edge banding, hinges, handles, shelf pins — ship with the order, which is often cheaper than a later single-piece shipment.
Our Installation & After-sales Support includes on-site installation, inspection and snags, warranty coverage, spare parts and replacement, and ongoing maintenance. Ask for the specific terms that apply to your order — what is covered, for how long, and which damage is treated as transit rather than manufacturing.
A pre-order packaging checklist
- Assembled or knocked-down — stated on the signed drawing.
- Edge, corner and face protection specified, not assumed.
- Moisture protection for the ocean passage confirmed.
- Component numbers identical to shop drawings; hardware labelled to the same numbers.
- Case marks by room, unit or dwelling, with case count per set.
- Packing list matching the marks, supplied before arrival so site can plan unloading.
- Case dimensions and weights shared in advance for access and storage checks.
- Incoterms, unloading responsibility and crate disposal confirmed in writing.
- Inspection window, photo evidence and replacement route agreed in the order.
If you are also fitting kitchens from the same board range, the same rules apply to Wood Grain Melamine Cabinets, and coordinating both in one packing plan usually reduces case count and site confusion.
Send us your drawings, the delivery address and your site's access constraints, and we will confirm the packing method, case marks and delivery terms for your wardrobes before production begins. Contact: PHILLIP, +86-13928214007, santerson@qq.com.