Panelled doors are one of those specifications that look simple on a door schedule and turn complicated on site. The profile of the mouldings, the direction the leaf swings, the height of the opening, how the frame meets the floor finish — each detail is decided by whoever makes the door. That is why the question is rarely "can this supplier make a hinged door". It is whether they can hold a specific design intent across a whole set of openings, deliver it with the rest of your joinery, and stand behind it once it is hanging on its hinges. Below is the checklist we suggest using before you place a door order.

1. Confirm they actually make this door type, not just sell doors

A supplier's catalogue tells you more than a sales conversation. Look for the exact construction you have specified rather than a close cousin of it. Our own range, for example, lists Classic Panel Hinged Doors within a hinged-door collection alongside flush and wood-veneer variants — different leaf constructions sitting in the same category page. That structure matters, because a supplier who produces panelled, flush and veneered leaves under the same roof is working with one set of frame tolerances and one finishing line, which is what keeps a set of doors consistent.

Ask specifically: how many panel configurations do you run as standard production, or is every paneled leaf a one-off? A supplier who can show several panelled references will handle your moulding profile far more predictably than one treating it as a special request.

2. Test how they handle made-to-measure openings

Panelled doors almost never come in a single size on a real project. Bedroom, study and bathroom openings differ; ceiling heights differ between a villa and an apartment tower; a renovation rarely matches the original schedule. Our product pages state made-to-measure sizing, material and finish options, and a layout tailored to the project as the configuration basis — and they also say plainly that dimensions and selected specifications must be confirmed for each project. A supplier worth buying from will repeat that same confirmation back to you in writing instead of assuming a standard size.

  • Do they ask for an opening schedule with clear opening sizes, leaf sizes and floor finish levels?
  • Do they flag when two openings on the same floor are only a few millimetres apart, or do they just make them differently?
  • Can they vary leaf width where a pair of doors has to share an uneven opening?

3. Check finish consistency across the whole set

The most common complaint about panelled doors in a finished project is not failure — it is mismatch. Two leaves from different batches, or a door and a matching wardrobe front, sitting side by side with slightly different colour or sheen. Ask which materials and finishes the supplier actually works with, and whether the same finish line produces your doors and your built-in cabinetry.

This is one reason we supply built-in furniture and doors from the same factory. When the door leaf, the architrave, the panelling and the wardrobes are finished in one place, the samples you approve at the start are much more likely to match what arrives in crates at the end.

4. Ask what happens between order and handover

Doors are heavy, awkward and easy to damage in transit, and they usually arrive at the noisiest moment of a fit-out. Find out how the supplier packages leaves and frames, whether they load them so panels do not rub, and who handles customs paperwork and delivery to the site. We arrange freight by sea, air or rail with the shipping documents prepared and door-to-door delivery to site — details worth confirming for your own port, delivery address and Incoterms before you commit.

Then ask about the last mile: who installs, who inspects for snags after hanging, and what happens if a leaf needs adjusting or replacing later. A supplier offering installation and after-sales support takes responsibility past the container; one who stops at delivery leaves you coordinating three trades.

5. Look for proof they have delivered doors on projects like yours

Ask for references in the same building type — villas, serviced apartments, hotel rooms. A door in a private house and a door in a guest room that is opened constantly all day do not carry the same duty, and they are not specified the same way. Reviewing completed project cases is a quick way to see whether a supplier has worked at your scale and in your region, and whether their joinery holds up once photographed in a finished interior.

A quick pre-order checklist

What to verifyWhat a capable supplier provides
Door typeThe exact panelled construction in their production range, with references
SizingMade-to-measure leaves and frames against your opening schedule, confirmed per project
FinishSame finishing line for doors, architraves and matching cabinetry; physical samples approved before production
IronmongeryHinge positions, lock prep and leaf thickness agreed against the handles and locks you have chosen
Packaging and freightProtected leaf loading, documents prepared, delivery to site arranged
After handoverSnag inspection after hanging, spare parts and replacement route named in writing
One practical test: send the same enquiry to three suppliers and compare the questions they ask back. The one who asks about floor finish levels, opening tolerances and ironmongery before quoting is usually the one who has installed panelled doors before.

If you are specifying panelled hinged doors for a villa, apartment or hospitality project and want them coordinated with the rest of the joinery, send us your door schedule and we will confirm sizes, finishes and configuration for each opening. Contact SANTERSON to start that review.