A door schedule looks simple until the site team starts asking questions. Height and width are recorded, but nobody noted whether the leaf should sit proud of the wall or finish flush with it, which side hinges, or how the finish is meant to match the joinery that was ordered three months earlier. Those gaps surface late, when they are expensive to fix.

A complete buying checklist for Santerson Decorative Interior Doors covers nine items: opening dimensions with tolerance, wall build-up and floor levels, swing direction and hinge hand, operating type, core and substrate, finish and edge detail, ironmongery set, delivery and handling sequence, and the site conditions the doors will meet before handover. Every one of those items is a specification decision, not a preference you settle after production has started.

This guide walks through each line item in the order we actually need it during a project, using the door families SANTERSON manufactures as working examples. Where a detail depends on your wall build or your local trade practice, the checklist tells you what to confirm rather than assuming an answer.

Start with the opening, not the door

Interior doors are made to measure for these collections. That means the number that matters is the finished structural opening, and it has to be taken from the building, not from a previous schedule or a drawing that predates the last revision.

  • Structural width and height at three points each. Take the narrowest measurement, not the widest. Older villas and renovation work rarely produce square openings, and a 10 mm variation across an opening is common.
  • Floor finish level, marked on site. A door sized to a slab level rather than to the finished floor will arrive either under-cut or dragging. State the floor build-up you are working to and who is responsible for setting it.
  • Head height relative to ceilings and cornices. Full-height doors change how cornices, shadow gaps and ceiling returns resolve. Decide this with the ceiling detail, not after.
  • Wall thickness and construction. Thickness sets the lining, architrave and reveal detail.

Wall thickness determines the lining, architrave and reveal detail, and a partition built for a different door type than the one finally specified means rework on both trades. Record whether the wall is masonry, stud with plasterboard, or a timber-framed partition, and confirm who builds the opening to the agreed tolerance.

Practical note: measure after the wet trades have finished and the floor level is fixed. Measuring early saves nothing; it just produces a schedule you will re-issue, and every re-issue resets production.

Choose the operating type by how the room is used

Before finishes, settle how each door moves. The wrong mechanism cannot be corrected cosmetically later, so this belongs near the top of the checklist.

Situation on siteOperating type to checkWhat has to be resolved before ordering
Furniture placed against the wall, or a narrow corridorSanterson Flush Sliding DoorsPocket depth inside the wall, track and hardware access above the head, floor guide detail
A door you want to disappear into a finished wallSanterson Handleless Concealed DoorsConcealed hinge load rating for the leaf size, wall reinforcement at the frame, opening method you will actually use daily
A conventional swing with a clean, standard detailStandard Interior Hinged DoorsHinge hand, leaf width against the clear opening, architrave profile or square edge
A wide opening you want to open up fully, such as a study to living areaFolding and pocket configurations across the rangeTrack alignment, door mass per panel, storage stack when open
Glass to borrowed light between roomsGlazed sliding or glass folding configurationsGlass type, safety glazing requirement for the location, hardware finish

Two questions settle most of this table. First: does the swing path conflict with furniture, a switch plate or another door? Second: do you want the leaf visible as a design element, or read as part of the wall? A decorative panel door and a concealed flush door solve different briefs, and mixing them within one floor level needs a deliberate decision about where the language changes.

Decide how the door reads against the wall

This is the item that separates a specification from a purchase order. A door that sits proud of the wall with an architrave and a door that finishes flush with it are different details, with different framing, different site sequence and different trade responsibilities.

  • Flush or aligned to the wall face. The reveal gap, the alignment of the leaf to the finished plaster surface, and the shadow gap all need a dimension agreed with the plasterer and the framer. Decide which trade sets the frame and at which stage.
  • Architraved or square-edged. Square-edge detailing looks simple and is unforgiving; the wall must be flat and the junction crisp. If your site tolerances are loose, an architrave profile is the more robust answer.
  • Handle or handleless. Handleless operation depends on the hinge set, the leaf mass and the clearance at the opening edge. Confirm the operating method in writing rather than assuming a magnet or a finger pull will do.
  • Decorative surface treatment. Moulded panels, grooved layouts and veneer patterns need to be checked against the panelling and cabinetry they sit beside. Order the sample, not the photograph.

Where a door is meant to continue a wall panel or match custom joinery, put the two items in one order. Flush Wall Aligned Doors specified alongside the wall panelling are veneered and finished together, so grain direction and tone are resolved once instead of argued about on site.

Specify core, substrate and finish as one line

Finish choice is only half the decision; what sits underneath it determines whether the finish survives. Ask for both together.

  • Substrate suited to the location. A bedroom leaf, a bathroom leaf and a leaf in a high-traffic corridor carry different moisture and impact exposure. State the room, not just the appearance.
  • Finish system named, with a physical sample approved. Painted, lacquered, laminated and wood veneer each behave differently at edges and around hardware. Approve a sample board against your paint and joinery schedule before production is released.
  • Veneer grain direction and matching. For veneered doors next to veneered cabinetry, confirm whether the grain runs vertically or horizontally across the set, and how leaves in a pair are matched.
  • Edge detail and sealing. Edges are where finish failures start. Ask how edges are finished and sealed, particularly for bathrooms and laundry areas.
  • Ironmongery prepared in the leaf. Hinge mortises, lock body prep, strike positions and any concealed hardware should be agreed before manufacture, with the exact hardware model supplied to the factory rather than assumed.
A short line worth adding to your schedule: "hardware model X, prepared as shown on approved shop drawing". It removes the most common site dispute between door supplier and ironmonger.

Match doors to the rest of the fit-out, in one order

Doors rarely fail on their own; they fail against the joinery beside them. Wardrobe fronts, kitchen cabinetry, wall panelling and skirting all compete for the same tone and profile.

When the same project needs windows and doors, built-in storage and finishes in matching materials, ordering them together gives you one material approval, one production window and one set of shop drawings to sign off. That is also where custom and OEM work earns its place: bespoke finish, texture and dimension are set once across the whole set rather than matched approximately by separate suppliers.

For a villa or hospitality fit-out, this is where coordination matters more than price per leaf. A single supplier covering doors, cabinetry and panelling resolves grain matching, reveal details and delivery sequence in one specification. SANTERSON's turnkey project solutions run that scope from design consultation and material selection through production, logistics and installation support.

Cover delivery, storage and installation in the checklist

Made-to-measure doors cannot be replaced quickly if they are damaged before hanging, so the last section of the checklist is about handling.

  • Packaging and container loading plan. Doors should be packed flat or upright as appropriate, with edge protection, and unloaded with enough people to keep them vertical.
  • Storage on site. Keep leaves off the ground, out of wet trades' path, and acclimatised to the internal environment before installation.
  • Delivery sequence against site programme. Frames may need to go in ahead of leaves; confirm what arrives when so openings are ready rather than waiting.
  • Snag and handover list. Walk the set with the installer: swing, latch engagement, gap consistency, finish damage, hardware operation. Record items against room numbers.
  • Spare leaves for hospitality work. For hotels and serviced apartments, ordering a small spare allowance with the main set avoids a mismatched replacement years later.

Three checks that catch most problems before production

If you only have time for three verifications, do these. First, re-measure one representative opening per door type on site and compare it to the schedule; a single discrepancy usually indicates a systematic error in how measurements were taken. Second, get an approved shop drawing showing hinge hand, swing direction, reveal detail and hardware preparation, signed by whoever installs on site. Third, approve a physical finish sample held against your paint and joinery samples in the same light as the room.

Those three steps convert a list of sizes into a buildable specification. They also give you something to check delivery against, which is exactly what a buying checklist should produce: a document the site team can hold the supplier and the installer to.

Can Santerson door collections be made to non-standard heights?

Yes. The interior and concealed door collections are configured with made-to-measure sizing, material and finish options, so full-height leaves and project-specific dimensions are specified rather than selected from a fixed range. Confirm the finished opening dimension and floor level before the order is released.

Should concealed doors be ordered with the wall build-up or after it?

Specify them during the wall design stage. Concealed hinges, reinforcement at the frame and the reveal gap all depend on the partition build, so the door type has to be fixed before the framing is set, even though the final measurement comes afterwards.

What information does the factory need to quote accurately?

A door schedule with opening width and height, wall thickness and construction, operating type, swing and hinge hand, core and finish system, ironmongery model, quantities by room, and the destination for delivery. With those items you get a comparable quotation; without them, prices are not comparing the same product.

SANTERSON has manufactured furniture and building materials in China since 2008, supplying doors, cabinetry, wall finishes and loose furniture for villa, hospitality and office projects, with door-to-door logistics and installation support. Send your door schedule and drawings for a specification review against the checklist above.