A six-metre swim spa is not a parcel. Once the order for an outdoor swim spa leaves the factory, the project either lands on a prepared slab with power and access ready, or it sits in a port while your site crew waits. The planning work happens before production starts, not after. This guide walks through how we handle international delivery for a project order of Outdoor Swim Spa WS-PC06CH, and what you need to have settled at your end so the handover goes smoothly.
Start With the Unit You Are Actually Ordering
WS-PC06CH is a configurable model in our outdoor swim and hydrotherapy range. The catalogue specification for this configuration is:
| Model | WS-PC06CH |
| Catalogue dimensions | 6000 × 3000 × 900 mm |
| Jet total | 38 pcs |
| Water pump | 2 pcs |
| Filter pump | 1 pc |
| Control system | 1 set |
| LED lights | 1 pc |
| Total power | 3.25 kW |
| Features shown | Water jets, LED lighting, Ozone |
Two figures in that table drive the whole logistics plan: the 6000 × 3000 × 900 mm footprint, which decides how the shell is packed and what vehicle can receive it, and the total power figure, which decides what electrical supply your site must provide. Both are catalogue values for this configuration, and both change if you select a different setup.
Options listed in the catalogue include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the configuration you sign off on is also the configuration we ship — adding a heat pump or swapping to sand filtration later means re-working the packing list and, in some cases, the electrical design.
Confirm the Configuration Before Production Opens
For a project order — a villa compound, a resort wellness deck, a residential development amenity — we treat specification lock-in as a milestone, not paperwork. Our cooperation steps run in this order: project brief and design proposal, quotation and detail confirmation, then production, shipment and follow-up.
What needs to be fixed at the quotation stage:
- Exact model and dimensions, checked against your prepared base or plinth
- Which optional accessories are included, and whether they ship with the shell or separately
- Electrical supply available on site — voltage, phase and circuit capacity for the selected configuration
- Access route from the delivery point to the final position, including gate widths, overhead clearance and turning space
- Delivery terms and the named consignee who will clear customs
If you are combining the spa with other items from the same project order — outdoor furniture, bathroom ceramics, lighting or cabinetry — tell us at this stage. Custom & OEM service lets us match finishes and coordinate production timing across categories, so one shipment covers more than one trade.
Packing, Freight and the Route
We arrange freight forwarding by sea, air and rail, with packaging and container loading planned around the unit's dimensions rather than fitted afterwards. For a 6000 × 3000 mm shell this usually means deciding early whether it travels as consolidated cargo or on dedicated capacity, because that choice affects both cost and the unloading equipment your site needs.
The logistics and door-to-door delivery service covers customs paperwork — commercial invoices, packing lists, certificates of origin and import permits where required — plus shipment tracking. Options such as cargo insurance are available, and a logistics coordinator follows the consignment rather than leaving you to chase the forwarder.
We state coverage across more than 100 countries. What we will not do is quote you a transit time or a duty figure before your route and destination are confirmed: those depend on port pair, Incoterms and local import rules, and they are settled case by case with your documentation.
What Your Site Must Have Ready Before Arrival
Most delayed handovers are site-side, not freight-side. Work through this list while the unit is still in production:
Structural base or plinth sized and levelled for the confirmed dimensions, with drainage around it
Electrical feed installed to match the configuration's supply requirements, on a dedicated circuit, by a licensed local electrician
Clear path from the truck to the final position — crane, forklift or manual route decided in advance
Water supply, and where applicable, a plan for filling and initial chemical balancing
Consignee details, import documentation and any permit confirmed with your customs broker
Receiving crew scheduled against the tracking milestones we send you
Electrical work in particular should be handled by a qualified local professional. Requirements differ by country and municipality, and the correct supply for your configuration is confirmed with us during specification — not assumed from a datasheet.
Installation, Inspection and Handover
On arrival we move into the installation stage of our turnkey solutions workflow: consultation, design and planning, production, logistics, installation, after-sales. For a swim spa this covers positioning, connection of pumps and control system under the confirmed configuration, jet and lighting function checks, and an inspection pass with snags recorded before you sign off.
Ongoing support covers warranty coverage, spare parts and replacement, and maintenance guidance. Response times and warranty terms vary by project and region, so the specific commitments for your order are set out in the contract rather than inferred from a brochure.
A Practical Timeline to Work Back From
Rather than a fixed lead time, plan backwards from your handover date:
- Handover target date — the day the spa must be operational
- Four to six weeks before — site base, electrical feed and access route completed on your side
- Before production opens — configuration signed off, quotation confirmed, packing method agreed
- In parallel — consignee, import documentation and customs broker arranged at destination
- On arrival — installation, function testing, snag inspection, handover
The bottleneck is almost never the factory. It is the electrical feed and the access route, both of which are your responsibility and both of which can be finished while the unit is still being built.
Enquire About a Project Order
If you are specifying WS-PC06CH, or comparing it with other models in the range, send us the site drawings and the electrical supply available. We will confirm the configuration, the packing method and the delivery scope for your destination, then give you a quotation with the details fixed rather than provisional.
As a China-based furniture and building materials manufacturer, we supply project customers in hospitality, villas and offices, and coordinate swim spa, outdoor furniture and interior fit-out items on one order and one shipment.