Wall panelling is one of those line items that looks simple on a drawing and complicated on site. A sheet arrives at the wrong size, the sheen does not match the sample held in the design pack, or the fixing detail was never agreed with the builder — and the wall finish becomes the item that holds up handover. Preparing a clear brief before you contact us is the single most effective way to keep matte lacquer wall panels on schedule. This guide sets out exactly what to have ready when you enquire about Santerson Matte Lacquer Panels, and what a competent supplier should be able to answer for you.

Why the brief matters more than the finish name

Santerson Matte Lacquer Panels sit within our Paneling Systems collection and are made for residential wall system projects. Finish, layout and dimensions are specified per space rather than ordered from a fixed size chart, which means an enquiry built around a colour name alone cannot produce a usable quotation. We need to know where the panels are going, how they meet the surrounding finishes, and what the drawing on site actually shows.

This is also why we ask for drawings early. Where a project calls for panelling that wraps around an opening, returns into a reveal, or meets Integrated Door & Paneling, those conditions change the panel layout and the supporting substrate. An experienced supplier will flag them before production starts, not after the first crate has been packed.

1. Room schedule, quantities and target dates

Start with a room-by-room schedule rather than a total square metre figure. For each wall or feature area, note the location, the approximate panelled area, and whether the surface is flat, returns a corner, or includes niches and reveals. A Custom Niche Paneling detail, for example, needs its own note because the recess framing is coordinated with the panel module.

  • Which rooms or walls are panelled, and how many square metres each — measured from the setting-out drawing where one exists.
  • Whether panels run floor to ceiling, stop at a dado, or wrap an existing built-in.
  • Your target date for site installation, working backwards from it. Site access dates matter as much as the order date, because panelling is usually one of the last trades in.

2. Finish reference and the sheen you expect

"Matte" covers a wide range of surface appearance, and it reads differently under warm downlight than under north-facing daylight. Tell us which you are working to:

  • A colour reference — a paint code, an existing sample you can post, or a photograph of the intended scheme alongside the joinery and soft furnishing palette.
  • The expected surface character: flat and chalky, or a low-sheen lacquer that still reflects a soft highlight.
  • Which surfaces the panels sit next to — Matte Lacquer Cabinets, stone, timber flooring or fabric — so the sheens are coordinated rather than competing.
  • Whether the finish must tolerate cleaning, as in a hallway, playroom or guest bathroom corridor.
Where a project needs an exact match to an existing finish already installed on site, send the physical sample rather than a photograph. Camera reproduction of low-sheen surfaces is unreliable, and a posted sample avoids a second round of approval.

3. Dimensions, substrate and fixing conditions

Made-to-measure sizing only works if the site conditions behind the panel are known. Have these details ready before we specify anything:

Item to supply Why we need it
Setting-out drawing or a dimensioned sketch of each panelled wall, including ceiling heights and out-of-level notes. Panel modules are cut to the wall. Tolerances and truing decisions are made from these dimensions.
Substrate type — masonry, plasterboard on studs, timber battening, or an existing built-in carcass. Fixing method and backing framing depend on what is behind the finish.
Location of services: sockets, switches, TV points, intercoms, concealed lighting drivers and any wiring runs. Cut-outs are made in production. Late service relocation means replaced panels.
Adjacent openings and trims: skirting, architraves, door linings, reveals, fire services, and any Wall Panel Systems that continue into another room. Determines whether edges are butted, shadow-gapped or trimmed, and how junctions are detailed.
Room humidity and exposure, for example a bathroom-adjacent wall or a wall sharing a wet area. Guides the substrate and edge sealing specified for that location.

If your drawings do not yet show these junctions, say so. That is a normal position at concept stage, and it tells us the enquiry needs a coordination round rather than an immediate price.

4. Scope boundaries: panels alone, or panelling with joinery

Tell us how far the wall finish goes in your package. Matte lacquer panels are frequently specified together with storage and built-ins, and the two are easier to coordinate when they come from one manufacturer:

  • Panelling only — wall surfaces, niches and reveals.
  • Panelling plus matching Matte Lacquer Wardrobes, media walls or shelving, so door fronts and wall surfaces share one lacquer batch and one sheen.
  • Panelling plus concealed doors or a Full Height Media Wall, where the panel joint pattern has to read continuously across opening and fixed panels.

If you are comparing finishes rather than committing to lacquer, note that alternative Santerson Textured Panels sit in the same collection. Naming the shortlist in your first message lets us quote comparable options side by side instead of running two separate rounds.

5. Delivery, access and installation arrangements

Panelling is a made-to-order item, so logistics belong in the conversation from the start. Be ready to state:

  • The delivery address and country, and whether the site is a single dwelling, a multi-unit building or a development with staged access.
  • Who receives goods on site, who carries them in, and any lift, stair or doorway size limits that constrain crate dimensions.
  • Whether you want delivery to site or to your own consolidation point. We handle freight by sea, air and rail with customs paperwork and door-to-door delivery, so the Incoterms you prefer should be stated in the enquiry.
  • Who installs — your joiner or builder, or our installation support with snag inspection at handover. This decides how the panels are packed and what fixing information travels with them.

For projects in Australia we have delivered villa cabinetry and furniture packages on sites including Willoughby, North Turramurra, Perth, Melbourne and Sydney. Import terms, duties and transit arrangements for your specific site are confirmed case by case in the quotation, so ask us directly rather than relying on a general assumption.

6. Your approval route and decision dates

Tell us who signs off the finish. A villa owner deciding alone, a designer approving on a client's behalf, and a developer with a specification consultant all need different documentation. We can work from drawings and issue visual renderings at concept stage, then move to detail confirmation before production — but the number of approval rounds is set by your side, and each round sits on the programme.

A practical test when you compare suppliers: ask what they need from you before quoting. If a supplier returns a price with no questions about substrate, service locations or junction details, the figure will move later.

Checklist to attach to your first enquiry

  • Room schedule with panelled areas and a dimensioned drawing or sketch per wall.
  • Finish reference — colour code, posted sample, or approved scheme imagery.
  • Substrate and fixing conditions, plus socket, switch and service locations.
  • Scope statement: panels only, or panels with wardrobes, media wall or concealed doors.
  • Delivery address, site access limits and preferred Incoterms.
  • Installation responsibility and your target site installation date.
  • Named approver for finish and detail sign-off.
Santerson Matte Lacquer Panels from the Paneling Systems collection
Santerson Matte Lacquer Panels, Paneling Systems collection — made-to-measure sizing with material and finish options specified per project.

Send us the drawings you have

You do not need a complete specification before contacting us. A room schedule, the drawings at hand and a clear target date are enough to start a productive conversation about matte lacquer wall panels for your project.

SANTERSON is a China-based one-stop furniture and building materials supplier working on villa, hospitality and office projects since 2008. Send your drawings and finish reference to PHILLIP by email at santerson@qq.com, or by phone/WhatsApp on +86-13928214007. Our contact page lists business hours as Monday to Saturday, 8:00 am to 6:00 pm (GMT+8), and enquiries receive a response within 24 hours.