Bathroom storage rarely makes the top of a villa or apartment bill of quantities, yet it is among the first things occupants use and often among the last items signed off. When a project specifies Santerson Drawer Units, the drawing set usually says very little about what actually gets manufactured. The gap between "drawer unit, as shown" and a buildable, quotable specification is where change orders, delayed shipments and site-fit problems are created.
Drawer units in this range are configurable products: finish, layout and dimensions are set per project rather than chosen from a fixed catalogue size. That flexibility is the reason they fit awkward bathroom footprints, and it is also the reason procurement teams need to document more than a product name. Below is a documentation checklist that holds up well on residential and hospitality fit-outs.
1. Confirm which product line each item belongs to
The first documentation error is treating every drawer-fronted box in a bathroom drawing as the same line item. Within the Santerson storage range, drawer units, corner storage, freestanding cabinets and open storage are separate configurable products with different carcass geometry and different fixing requirements. A drawer bank beside a vanity and a tall linen cabinet that merely looks coordinated will not necessarily share the same build detail or installation notes.
Record the exact product line for each location on the room schedule, not just "storage". If a project also draws on the vanities range — a double vanity in the principal bathroom, a floating vanity in an ensuite — keep those as their own line items so that the drawer units are not absorbed into a vanity quotation and then re-specified later.
2. Lock dimensions to the site condition, not the drawing scale
Made-to-measure units are manufactured to the dimensions written on the purchase order, so those numbers need site verification before production is released. Document the finished-face dimensions of the space — after tiling, plasterboard, waterproofing and any pipework chase — rather than the rough opening. Note clearly which figures are design intent and which have been verified on site.
- Width, height and depth at the finished wall and finished floor level, with tolerance stated.
- Clearance required for drawer front travel and for any handleless or integrated pull detail.
- Position of waste and supply outlets relative to the carcass, so shallow drawers are not drawn across a trap.
- Wall construction behind the unit — stud, brick or tile over substrate — for wall-hung items.
Where a unit sits under or beside a worktop, record who is responsible for the cut-out and for the interface. Basin and countertop products in the same bathroom package, such as an undermount basin or stone and marble surfaces, are also configured per project, so the cut-out drawing has to be agreed between both packages before either is released for production.
3. Specify finish and material with a reference that survives the shipment
"Matte grey, as per sample" fails on multi-bathroom projects because samples fade, get lost in transit and are read differently by different trades. Document a finish code, the substrate and the surface treatment for every visible face, and record which faces are visible: a drawer front seen from the doorway and a cabinet side seen from the corridor both need to be finished, while an internal carcass does not.
For projects ordering several bathroom packages at once, ask for one finish schedule covering all joinery in the dwelling — vanities, drawer units, storage and any kitchen cabinetry — so that matching wood grains and lacquer tones are decided once instead of per room. SANTERSON's custom and OEM work covers bespoke finishes and textures alongside made-to-measure sizing, which is useful when a project needs a tone matched to an existing specification.
4. Record the internal layout as a drawing, not an adjective
"Three drawers and a shelf" is not a specification. Each drawer bank should be shown in elevation with front heights, and each interior division dimensioned. Document which drawers are deep, which are shallow, and whether any compartment is intended for tall bottles or folded linen, because internal layout determines runner selection and load rating.
If the project mixes closed and open storage — an open niche beside a closed drawer bank, for instance — show it on the same elevation. It affects the carcass side, the visible edge treatment and how the unit is protected during transit.
5. Note hardware, lighting and electrical interfaces early
Hardware is often left to the installer and then becomes a site purchase. Document runner type, soft-close requirement, handle or handleless profile, and who supplies hinges and fixings for wall-hung units. Where internal or toe-kick lighting is intended, record it as part of the unit rather than as an electrical item: integrated cabinet lighting is specified per cabinet design, and its electrical rating and compatibility need confirming before the carcass is drilled.
The same applies to accessories fixed to or near the unit, such as towel rails and warmers. They are configured per project too, so their fixing positions should be shown on the elevation to avoid a drawer front that cannot open past a rail bracket.
6. Keep verification items on the sheet instead of assuming them
Configurable products come with open points, and a sound procurement record states them openly rather than leaving them to be discovered later. Before release for production, confirm materials, hardware, countertop and basin fit, electrical ratings where lighting is involved, and installation requirements for each selected configuration. These are not minor caveats — they decide whether the unit fits on the day.
The same discipline applies to commercial information. Factory capacity, export share, warranty terms and response times can be stated inconsistently across a supplier's own pages; confirm the figures that apply to your project with the supplier before they are copied into your documents or contract schedules.
7. Document the delivery and installation sequence
Made-to-measure units are produced to a set schedule and arrive when the project expects them, so the record should show when site verification happens, when production is released and what still has to be true at handover. Where freight is arranged door to door, note who handles customs paperwork and who receives the delivery, and check that storage locations are labelled by bathroom rather than only by carton number.
Finally, agree the snag list in writing before installation finishes: drawer alignment, front gaps, runner operation under load, sealant lines at worktop interfaces and protection of finished faces. A short sign-off sheet per unit is sufficient, and far cheaper than relitigating the same items after practical completion.
A simple documentation pack to request
For each drawer unit on a project, procurement should be able to produce: a room schedule entry naming the product line; a dimensioned elevation with internal layout; a finish schedule with codes and visible-face notes; a hardware and runner note; an electrical interface note where lighting is involved; a record of who supplies and cuts the worktop and basin interface; and a sign-off sheet for delivery and installation. Those seven documents turn a configurable product into something a site team can install without guessing.
If your project needs bathroom storage coordinated with vanities, basins and other interior fixtures under one specification, SANTERSON works as a one-stop supplier of furniture and building materials, covering custom sizing, production, logistics and installation support. Send the room schedule and the drawings you already hold, and the open points can be closed before anything enters production.