A flooring submittal is the package a buyer, contractor or designer reviews before approving material for a project. For European Oak Parquet Engineered Wood Flooring, the goal is simple: let the reviewer confirm that the board you are quoting is the board that will arrive on site, and that it suits the room, the subfloor and the handover schedule. The checklist below covers what we send with every quotation, and what to ask us for if anything is missing.
1. Construction build-up, not just a product name
Ask for the make-up of the board in writing: the species and thickness of the top layer, the core construction, and the finish system. Our parquet lines are built with a 3 mm solid oak wearing layer over a multilayer core, which is what keeps the boards dimensionally steady through seasonal change instead of cupping or gapping at the joints. Where a product page lists a figure, request the same figure on the quotation and the packing list so all three documents agree.
Because wear-layer thickness drives refinishing options over the life of a floor, it belongs in the submittal next to the finish type — oiled, lacquered or UV-cured — rather than buried in a data sheet you have to chase down later.
2. Sizes, patterns and the layout drawing
Parquet is specified by pattern as much as by colour. Confirm whether the boards lay up as blocks, herringbone or chevron, and get board width, length and thickness for each format. We keep several formats side by side — European Oak Engineered Parquet Flooring in a lighter tone, European Oak Parquet Engineered Hardwood Flooring in a warmer grain, and herringbone options such as the European Oak Herringbone Engineered Wood Flooring — so the submittal should name the exact item number for every area of the drawing.
Attach a simple setting-out plan showing where each pattern starts, which direction the boards run, and how borders and thresholds are handled. A one-page layout drawing settles most disputes before they become site variations.
3. Grade, colour range and the physical sample
Screens mislead on oak. Include the grade rule you are buying to — how much sapwood, mineral streak, knot and colour variation is acceptable — and send a physical sample of the actual batch tone. Our product photography shows the grain character of each line, but approve a board in your hand before the order is placed, and keep that signed sample as the reference for delivery inspection.
4. Quantity take-off, spares and packaging
Give us the measured areas per room, not a single total. We then return a take-off with the cut allowance, the number of cartons and square metres per carton, pallet count and the container loading plan. Order cutting allowance and a few spare boards for future repairs at the same time; matching oak to an existing floor years later is far harder than keeping stock on site.
5. Heating, subfloor and installation conditions
The engineered build-up is compatible with underfloor heating, but the submittal should still record what the site actually offers: the type of heating system, how the screed has been dried and tested, subfloor flatness, residual moisture readings, and the adhesive or fixing method planned. State which transition strips, skirting and end trims apply at doorways and thresholds. Installation is only as good as the conditions on the day, so these items belong in the approval pack rather than in a conversation after the boards land.
6. Lead time, delivery and responsibility split
Include production time for the confirmed quantity, packing and container loading arrangements, freight mode and the delivery terms you are buying on, along with who handles customs clearance and last-mile delivery to each floor level. As a manufacturer that also arranges logistics and door-to-door delivery, we can quote the boards and their transport as one package, which removes the gap between the flooring supplier and the freight forwarder that so often delays fit-out programmes.
7. After-sales terms in writing
Close the submittal with what happens after handover: warranty scope and its exclusions, how claims are raised, spare-board availability, and the contact who answers questions once the site team has the boards on the floor. Our installation and after-sales support covers inspection of completed work and replacement of parts where a claim is accepted; ask for the specific terms that apply to your quantity and destination.
A short pre-approval checklist
- Item number, pattern and colour for every area on the drawing
- Top-layer thickness, core construction and finish system, consistent across quotation, data sheet and packing list
- Board dimensions and setting-out plan with borders and thresholds
- Grade rule and approved physical sample retained for delivery inspection
- Take-off with cutting allowance, spares, carton and pallet counts
- Underfloor heating and subfloor conditions, fixing method and trims
- Production time, freight mode, delivery terms and responsibility split
- Warranty scope, claim route and spare-board supply
Send us your drawings and quantities and we will return a submittal pack built to this structure, matched to the exact parquet line you have selected.