A swim spa in a hotel is not a single product purchase — it is a small building services package that touches structure, power, waterproofing, plant location and daily operations. The Outdoor Swim Spa WS-PC06ST sits in our configurable outdoor swim and hydrotherapy range, and it is a useful reference point for buyers who need a lap-swim plus hydrotherapy offer on a compact footprint. This guide walks through the selection decisions a hotel fit-out team should settle before the unit appears on a purchase order.

Start with the programme, not the model number

Before comparing shells and jets, write down what the spa has to deliver for your property. A business hotel with gym-going guests wants a credible swim current they can use early and late. A resort or villa-style property sells the spa as an experience — evening lighting, warm water, a place to sit in the water. A serviced-apartment or aparthotel project usually needs both, plus low maintenance because there is no full-time pool operator on site.

That programme decides where the unit goes and how it is specified: rooftop terrace, podium deck, courtyard, garden lawn or an indoor wellness room. It also decides whether you buy the standard configuration or add options such as a heat pump, insulation and UV sterilisation.

Footprint: does 5.9 m of deck work?

The catalogue lists WS-PC06ST at 5900 × 2400 × 1470 mm. Treat that as the shell envelope, then add what your site actually needs around it: an approach and entry step, a wet deck or paving strip, plant access for the filter pump and control system, plus clearance for any future servicing. A spa that fits on the drawing but leaves no maintenance access becomes a liability in year two.

If the 5900 mm length is the tight constraint — a narrow terrace, a courtyard between two wings — the same range offers an extended variant of the same family at 6390 × 2400 × 1470 mm with the same equipment set. Confirm which variant your quotation covers rather than assuming the length; deck setting-out and drainage falls depend on it.

What the standard configuration includes

The published specification for WS-PC06ST gives you a starting point for coordination with your MEP consultant. Note that the water pump is not listed in the captured specification for this model, so it should be confirmed as included or optional in your quotation rather than assumed.

ModelWS-PC06ST
Catalogue dimensions5900 × 2400 × 1470 mm
Control system1 set
Swim training system1 set
Filter pump1 pc
Jet total6 pcs
LED lights4
Total power6.55 kW
Features shownWater jets, LED lighting, Ozone, Swim training system

The 6.55 kW figure is the total power of the listed equipment, not your connected supply. A heat pump for heated-year-round use sits on top of it, and hotel switchboards are usually loaded to a spare margin. Hand the confirmed configuration sheet to your electrical engineer early so cable sizes, protection and isolation are designed once.

Options that matter for hotel duty

  • Heat pump and insulation. Unheated water limits the season and shortens guest use. For a property marketing the spa all year, specify heating and insulation with the shell rather than retrofitting them.
  • Ozone plus UV sterilisation. Ozone is shown as a standard feature; UV is an option. Shared water in a hospitality setting is where dosing redundancy pays for itself in fewer guest complaints and less chlorine odour.
  • Filtration. One filter pump is listed; sand filtration is an option on the range. Decide based on expected bather load and who cleans filters — a duty engineer on site, or a contracted pool service.
  • Steps and access. Steps are listed as an accessory. For accessible or family-facing properties, entry height and slip resistance of the surrounding deck belong in the same detail drawing.

Availability and compatibility of these options vary by model, so the quotation should itemise them against your chosen configuration instead of describing them generally.

Site conditions to settle before ordering

Structure and loading. Water plus guests is a heavy imposed load. On a podium or rooftop, the structural engineer needs the filled weight of the confirmed configuration, not the catalogue length alone.

Power and earthing. Confirm supply capacity against the equipment list, the location of the isolator, and how the control system is accessed by staff.

Drainage and overflow. Backwash, splash-out and any emergency drain need a route to the foul or storm system accepted by your local authority.

Noise. Pumps run on a schedule. On a rooftop above guest rooms or beside a neighbour's boundary, plant location and acoustic enclosure are design questions, not an afterthought.

Consents. Pool barriers, fencing and permits differ by state and municipality. Confirm requirements with your local certifier; do not rely on a supplier catalogue for compliance.

Buying it inside a wider fit-out

A swim spa rarely arrives alone. In our Swimming Pools and Swim Spas range you can specify the shell alongside the surrounding poolside package — Outdoor Furniture for Villas and Resorts such as loungers, daybeds and shaded pergolas, exterior wall and ceiling finishes, outdoor lighting, and the changing or wellness room's vanities, mirrors and shower systems. Coordinating these with one supplier means a single production schedule, one container plan and one point of contact for snags.

For hospitality work we provide Hospitality Project Furnishing under a turnkey scope: design consultation and space planning, material and product specification, manufacturing and quality control, project management with site coordination, then delivery and installation support. If your spa needs a non-standard size, finish or equipment set for the property, our Custom & OEM Service covers bespoke dimensions, finishes and branding; confirm current options and minimum order quantities for your project.

A short specification checklist for the RFQ

  • Exact model and shell length, with a dimensioned setting-out drawing signed off by your architect.
  • Confirmed equipment list: control system, swim training system, filter pump, jet count, LED lights, and whether a water pump is included.
  • Heating, insulation and sterilisation options stated line by line, with total connected power for the engineer.
  • Delivery terms, packaging and container plan, plus who receives on site and what site conditions must be ready before the unit lands.
  • Installation support scope, spare-parts availability and the written warranty terms for your market.

Send that list with your drawings and you will get comparable quotations — from us or anyone else.