A request for wall mounted cabinets that arrives without dimensions, finish notes or installation context usually comes back as a question rather than a quotation. Wall-hung storage is made-to-order work on almost every project: the cabinet box, the fixing method and the wall behind it all have to agree before production starts. The quicker you can hand over the information below, the fewer revision rounds your supplier needs.
What a supplier needs from you, in short: the fixing wall and its construction; overall and clear dimensions; quantity per room; storage mix and door type; finish reference; whether the unit sits in a wet zone; drawings or photographs; delivery address with access notes; who installs; a budget band; and the date the goods are needed on site.
1. Room dimensions and the exact fixing wall
Send the overall width, height and depth of the space, plus the clear run of wall the cabinet will sit on. For a bathroom fit-out, note where the vanity, basin, mirror and shower screen fall, because a wall unit that clashes with a tap or a door swing has to be resized after the fact. If one design repeats across several rooms — guest bathrooms in a villa, for example — state how many of each, since quantities affect both price and packing.
State the wall construction if you know it: masonry, timber stud, steel frame, or tiled over plasterboard. Wall-mounted cabinets carry their load on the substrate, so the substrate decides the bracket type and whether additional noggins or a backing frame are needed. If you do not know what is behind the finish, say so; an experienced supplier will ask for a site photo before committing to a fixing detail.
2. Layout, storage mix and door type
Decide what the unit has to hold before you talk about appearance. Towels and linens need deep shelving; toiletries and cleaning products work better in shallow drawers; glassware or display pieces may call for a glazed front. Most bathroom storage schemes combine closed compartments with one open niche, so everyday items stay within reach without the whole wall looking cluttered.
Tell the supplier whether you want hinged doors, sliding doors, drawers or an open layout, and whether handles are acceptable or a handleless groove is preferred. Where a cabinet sits above a basin, door opening direction matters — a handle that knocks a tap or a door that hits a mirror changes the specification.
3. Finish, material and how it must match the rest of the fit-out
Send the finish you are working to: a paint reference, a laminate or veneer sample code, or a photograph of the floating vanity, wall panel or cabinetry it has to match. Made-to-measure production means material and finish are selected per project rather than picked from a fixed shelf, so a clear reference is what keeps the cabinet, the joinery and the wall finishes in the same tone under site lighting.
If the unit sits in a wet zone, flag it. Bathroom cabinets sit close to showers and baths, where splash and humidity are constant, and that affects both the board choice and the edge treatment. Say which side of the room the unit is on rather than assuming the supplier will infer it.
4. Drawings, project stage and quantities
A sketch with dimensions is enough to start a conversation; a set of room elevations makes the first quotation far more accurate. If you have architectural drawings, send the relevant pages even if they are not finished — interior design services can turn space layout information into production drawings and 3D renderings, which removes a whole round of guessing about heights and clearances.
Be explicit about where the project stands: concept stage, tender, or ready for production. Concept-stage enquiries let you see material options and prototypes before quantities are locked in, while an enquiry that is already in construction needs drawings confirmed quickly so it does not sit at the back of a production queue.
5. Delivery address, access and who installs
Give the delivery city and site type, plus any access limits — apartment lifts, stair widths, basement loading, or a resort site where deliveries are only accepted at certain hours. Wall-hung cabinets ship flat or partly assembled, and the packing plan depends on how the cartons reach the room. Ask what the packaging looks like and how crates are labelled if more than one trade is receiving goods on the same day.
Then be clear about who fixes the units to the wall: your builder, your joiner, or installation and after-sales support from the supplier. Whoever installs needs the fixing detail and the load assumptions in writing before the substrate is closed up, not after the tiles are on. If you want installation and snagging included, raise it at quotation stage, because it changes what has to be documented.
6. Budget range, quantities and lead-time expectations
A budget band helps the supplier propose a board, finish and hardware package that lands inside it instead of quoting one option and starting again. Alongside it, give the number of units, the room list they belong to, and the date the goods need to be on site. For overseas sourcing, the delivery date drives production scheduling and the freight method — sea, air or rail — so an approximate target date is more useful than no date at all.
Ask what the quotation includes: hardware, countertop or shelf glass, spare panels, packaging, freight, customs paperwork and insurance. Two quotations that look similar often differ in exactly these lines.
7. What a complete enquiry looks like
Before you press send, check the message contains: room dimensions and clear wall run; wall construction; quantity per room; storage mix and door type; finish reference; wet-zone exposure; drawings or photographs; delivery address with access notes; who installs; budget band; and required on-site date. A supplier working from that list can return a specification, a price and a schedule in one pass.
SANTERSON manufactures furniture and building materials for villa, hospitality and office projects, with custom furniture manufacturing, door-to-door logistics, and installation and after-sales support behind the quotation. Send the details above to start an enquiry, and it can move straight into design confirmation instead of an information-gathering loop.
Frequently asked questions
Do I need drawings before contacting a wall cabinet supplier?
No. A dimensioned sketch and photographs of the wall are enough for a first quotation. Drawings help where the unit must align with vanities, tiling lines or lighting, and design support can produce them if you do not have them.
Can sizes be changed after the first quotation?
Yes, while drawings are still unconfirmed. Once production drawings are approved, size changes restart the drawing and costing cycle, so settle dimensions before sign-off.
Should wall cabinets be ordered with the vanity in one package?
Ordering storage, vanities and other bathroom joinery together keeps finishes consistent and consolidates packing and freight. It also means one set of drawings governs clearances between the pieces.