Sliding storage panels look simple on a rendering: two or three full-height leaves gliding across a wall, hiding wardrobes, shelving and appliances behind a clean face. On site they are one of the least forgiving elements in a fit-out, because a panel system has to work with floor level, ceiling height, skirting, door openings, lighting recesses and the traffic pattern of the room at the same time. Most problems we see on project enquiries are not manufacturing faults at all — they are information gaps between the drawing pack and the finished site condition.
This guide sets out how we coordinate Santerson Sliding Storage Panels from the first drawing issue through to installation handover, and exactly what we ask a designer, builder or procurement team to confirm at each stage.
What the drawing pack needs to tell us before we quote
A furniture elevation alone is not enough for a sliding wall. When we receive a set of design drawings, we read them for six things, and where one of them is missing we come back with questions rather than guessing.
- Wall run and clear opening. Total length of the wall, plus any obstruction at either end — a return wall, a door reveal, a radiator or a downpipe. Panel widths are derived from the clear opening, not the nominal room dimension.
- Floor to ceiling height at several points. Older villas and renovated apartments rarely have a level floor across a four-metre run. We need heights taken at both ends and the middle before we decide whether panels are cut to suit on site or ordered to a single line.
- Finish line, not structural line. Plaster, screed, tiling and wall cladding all consume thickness. Panels must be dimensioned off the finished face, so we ask which drawing revision shows the final built face.
- What sits behind the panels. Shelving, hanging rails, drawers, a television, an appliance or a service access panel each changes the internal carcass and the load the track carries.
- Adjacent materials. Where the wall system meets flooring, ceiling, stone or niche panelling, we need to know which trade closes that gap and who is on site first.
- Handover intent. A storage wall in a private villa and the same wall in a rented or hospitality unit are specified differently — the second needs more robust hardware and simpler access.
Site requirements that change the system, not just the size
Once the geometry is understood, four site conditions decide which configuration we actually build. These are the points where a specification written from a catalogue image usually fails.
| Site condition | What we check on site | How it changes the panel system |
|---|---|---|
| Floor level and floor covering | Level difference across the run; carpet, engineered timber, tile or stone; whether underfloor heating is present | Determines track fixing detail and whether a threshold or shadow gap is used. Cutting into a heated slab is never done without the mechanical contractor's sign-off. |
| Ceiling construction | Solid slab or lined ceiling, recessed lighting positions, existing bulkheads | Decides whether an upper track can be fixed and where lights have to be relocated before the wall is built. |
| Wall substrate | Masonry, stud partition, existing plasterboard condition | A partition may need noggins or additional blocking set out in advance — this is a structural fix, not something the panel carries. |
| Room use and traffic | Bedroom, living room, office, guest suite; frequency of daily use | Drives hardware selection and whether one, two or three leaves are practical for the opening. |
Where a wall has to divide a space rather than store things, we look at Santerson Partition Sliding Systems instead, and where the requirement is a closet front inside a bedroom scheme, Santerson Closet Sliding Panels are usually the better starting point. Specifying the right family first saves a re-issue later.
Our coordination sequence, stage by stage
This is the workflow we run on custom wall systems, and it maps onto the same design-coordination service we offer across joinery and built-in furniture.
- 1. Brief and drawing review. We mark up your elevations and return a list of open items — dimensions we cannot verify, clashes with services, and finishes that need a sample decision.
- 2. Site survey or verified site dimensions. For projects where our team attends, measurements are taken on site against the finished faces. Where attendance is not possible, we issue a dimension sheet for the local contractor to complete and photograph, and we do not release production until it comes back signed.
- 3. Layout and configuration proposal. Panel count, leaf widths, overlap, opening direction, internal layout and hardware type are set out in a shop drawing for your approval.
- 4. Finish confirmation. Samples or agreed references for panel faces — wood grain, matte lacquer, textured surfaces, glass — matched against the joinery and wall finishes already specified for the project.
- 5. Production with a documented spec. The approved shop drawing becomes the production document. Any change after this point is re-issued in writing so both sides can see the cost and time effect.
- 6. Delivery and installation coordination. We agree access, protection, sequence with other trades and a snag list at handover.
Our Interior Design Services cover exactly this coordination — space planning, drawings, production liaison and on-site guidance — so a project team that has only a concept scheme can bring the wall system to a buildable state before it reaches site.
Matching panel faces to the rest of the joinery
A storage wall reads as architecture, not furniture, when its face matches the surrounding cabinetry. On whole-house schemes we specify sliding panel fronts from the same material and finish batch as the kitchen and bedroom joinery, so grain direction and colour sit consistently across the scheme.
Wood grain faces — used where the wall has to disappear into a warm joinery scheme. Grain direction and leaf joints are shown on the shop drawing so the eye reads continuous lines across panel edges.
Textured faces — from our Santerson Textured Sliding Panels range, useful where a matte, tactile surface is specified and light reflection across a large face is unwanted.
Glass faces — for display or lighter rooms; see Santerson Glass Sliding Panels. Glazing adds weight, which is a hardware decision, not a cosmetic one.
Acoustic faces — where the wall also has to dampen sound between rooms, see Santerson Acoustic Sliding Panels; the build-up and the track detail differ from a standard storage front.
Media walls — if the panels are hiding a screen rather than storage, Santerson Sliding Panel TV Systems is the correct family, and cable routes have to be resolved before the carcass is made.
A whole-house example shows how these decisions travel together: our mid-century whole-house custom cabinetry and built-in storage project combined a bay-window desk with drawers, open staircase shelving and wood-grain kitchen cabinets in one material palette, with every dimension measured on site to suit the appliances and layout already fixed on plan. The same discipline applies to a sliding wall — the panels are only as good as the survey behind them.
The pre-production checklist we ask clients to sign off
- Finished-floor and finished-ceiling levels confirmed on site, not taken from the architectural plan alone.
- Clear opening measured at three heights and three widths across the run.
- Internal layout agreed: rails, shelves, drawers, appliances, and any service access that must remain reachable.
- Leaf count, overlap and opening direction tested against how people actually move in the room.
- Panel face reference approved in writing, with the joinery batch it has to match.
- Track fixing substrate confirmed, including any blocking or noggins installed by others.
- Lighting, sockets and cables routed before the carcass is closed up.
- Shop drawing returned signed, with revision date recorded.
- Access route, protection and installation window agreed with the site programme.
If any line above is still open when we would normally start cutting, production waits. That single rule prevents most of the rework calls that arrive two days before a handover date.
Coordination gaps that surface late on site
Three patterns repeat across project enquiries. First, panels ordered from nominal room dimensions rather than finished faces: the run then comes up short at one end because the floor falls away, and the fix is a scribe piece or a re-made leaf. Second, hardware selected after the panel face is fixed, when the weight of glass or a thick textured build-up has already outgrown what the specified track can carry. Third, service access blocked — an isolation valve or filter buried behind a wall that now cannot open fully.
None of these show up on a rendering, and all three are avoidable with a verified dimension sheet and one coordinated shop drawing issued before cutting starts.
If you have drawings for a storage wall, media wall or closet front and want them checked against real site conditions before anything goes into production, send us the elevations and the current dimension sheet. We will mark up what is missing, propose a configuration and finish schedule, and return a shop drawing your site team can build to — through our contact page or by WhatsApp on +86-13928214007.