A floating TV unit looks simple on a drawing: a cabinet that appears to hover above the floor, with the wall left clear underneath. The difficulty appears later, when the designer's elevation, the buyer's budget and the site team's fixing method have to agree on one set of dimensions. This article sets out what both sides should confirm before Floating TV Units enter production.

Where designer and buyer intentions usually part company

Designers tend to start from the wall. They want a clean horizontal line, a continuous finish that ties into adjacent panelling, and storage that disappears into the composition. Buyers tend to start from the room: what has to be stored, how much the joinery costs, and whether the piece can be installed without opening up the wall.

Neither view is wrong. The problems begin when a floating unit is treated as a catalog item rather than a made-to-measure element. A unit specified at a fixed length, with a fixed depth and a finish copied from a photograph, will be measured against a real wall on site — and that is where variations in wall flatness, skirting, architraves and the position of the TV bracket start to matter.

Our own listings describe these pieces as configurable: sizing made to measure, material and finish selected per project, layout tailored to the space. That wording is deliberate. It puts the responsibility for a few specific decisions back on both parties before an order is placed.

What designers should put on the drawing

  • A setting-out dimension, not just a unit length. Where the unit starts and ends relative to a fixed reference — a room corner, a door reveal, the centre line of the TV — and the height of the underside above the finished floor level.
  • The wall build-up. Plasterboard on studs, masonry, or a timber-framed partition will each take fixings differently. The drawing should state what is behind the finish line, or ask for it to be confirmed on site.
  • The screen and its bracket. Screen size, whether it is wall-mounted or sits on the unit, and the bracket type determine the load path and the position of any backing panel.
  • Cable routes and device locations. Where the set-top box, console, soundbar and power outlets sit, and whether cables run inside the carcass, behind a panel or through the wall.
  • Drawer and door clearance. Handles, push-open mechanisms and the swing of any hinged door need enough room against the wall and against adjacent joinery.

What buyers should confirm before ordering

  • The finished floor level is final. Floating units are set out from the floor. If tiling or screed is still to come, every height on the drawing shifts.
  • Storage mix by household, not by magazine. Open shelving shows things; closed storage hides them. Decide which items live in the unit before choosing how much of each you want.
  • Finish continuity with the rest of the joinery. If the media wall is one element in a wider set of built-ins, ordering it separately from the wardrobes and kitchen usually means matching veneers and lacquers after the fact.
  • Who installs it, and when. A floating unit needs a competent fixing to a suitable substrate. Book that decision early rather than leaving it to the trade that arrives last.
  • A site survey before production sign-off. One measurement visit resolves wall flatness, stud positions and outlet locations in a single pass.

A short alignment checklist both sides can sign

Item to agree Who supplies it When
Overall length, depth and mounting height Designer's setting-out drawing plus site verification Before quotation
Wall substrate and fixing method Site team / buyer's contractor Before production
Screen size, bracket and backing panel Designer and buyer together Before carcass design
Cable routes, outlets and device positions Buyer's electrical contractor First fix stage
Material, finish and edge detail sample Manufacturer, approved by designer Before production
Installation sequence and responsibility Buyer's site team At order confirmation

Choosing between the wall-mounted and freestanding option

Where the wall build-up is known and the fixing can be verified, a Santerson Wall Mounted Media Walls solution gives the clean floor line designers ask for. Where the substrate is uncertain, or where the client prefers to keep the arrangement changeable, a Santerson Freestanding TV Cabinets option carries the same proportions and finish but rests on the floor.

Integrated lighting is a separate decision that affects both carcass depth and the electrical first fix. If ambient or shelf lighting is part of the design, it should be drawn at the same time as the cable routes — Santerson Integrated LED Media Units are specified per project, and the lighting and electrical details need confirming for the selected design. For a wider composition that combines open display with closed storage at the same height, Santerson Floating Modular Systems follow the same made-to-measure approach.

How a single supplier reduces the number of handovers

The most common cause of a media wall that does not match its drawing is not manufacturing error. It is a sequence of handovers — designer to trader, trader to cabinetmaker, cabinetmaker to electrician — where each party passes on assumptions rather than verified dimensions.

SANTERSON has operated as a furniture and building materials manufacturer in China since 2008, supplying custom and OEM built-in furniture for villa, hospitality and office projects. Because the same team handles the carcass, the doors, the finish and the adjacent panelling, one drawing set can cover the media wall together with the joinery around it, which is where finish matching normally goes wrong.

We work from the designer's drawings: dimensions, layout, material and finish are confirmed for each project before production. Freight arrangements can be organised to site, and installation guidance follows the agreed setting-out. Dimensions, fixings and selected specifications should be confirmed for each project — we ask for a site survey rather than relying on drawing dimensions alone.

Frequently asked questions

How far in advance should floating TV units be specified?

Early enough that the electrical first fix can follow the unit, not the other way round. In practice this means the setting-out drawing exists before outlets and cable routes are fixed on site.

Can an existing wall-mounted arrangement be replaced with a made-to-measure unit?

Yes, provided the substrate behind the finish can be checked. The survey covers wall flatness, stud or fixing positions and the location of existing outlets and cables.

Which finishes are available?

Finishes are selected per project from our material range, so a floating unit can be matched to the wardrobes, media panelling or kitchen cabinetry in the same property. Samples should be approved before production.

If you have drawings for a living room media wall or a full set of villa joinery, send them with the room dimensions and we will confirm layout, material and finish options for your project.