A custom laser cut metal screen is rarely installed straight from a design drawing. Before the panels are cut, the interior designer, main contractor and procurement team normally sign off on a product submittal — one package that fixes the pattern, size, finish, structure and delivery terms for the reception area. When that package is thin, the screen arrives late, in the wrong colour, or does not fit between the columns. Below is what a complete submittal for a decorative partition for hotel reception should contain, and what you should expect back from the supplier.
1. Project information and the scope of the submittal
Start with the boring part, because it is what keeps a screen from being cut for the wrong tower. The cover sheet should carry the project name and location, the client and consultant names, your purchase order or enquiry reference, the revision number and date of the drawing set you are working to, and the exact room — lobby, reception desk, lounge screen, lift lobby or banquet entrance. A hotel reception screen is usually a fixed interior element coordinated with flooring, ceiling and lighting, so the submittal should state which drawings it answers and what is excluded, for example adjacent wall finishes or on-site electrical work behind an illuminated panel.
For projects we supply from China under one-stop furniture and building materials procurement, this page also records who takes the site measurement: the local contractor, or our team working from your as-built drawings. That single line prevents most site-fit problems.
2. Shop drawing with panel layout and dimensions
The core of the package is a dimensioned shop drawing, not a mood board. It should show overall width and height, floor-to-ceiling or free-standing condition, the number of panels and how the run is split, frame profile sizes, the open area of the pattern versus the solid frame, and where doors, reception counters, signage or cable runs interrupt the screen. Mark the datum line you measured from, and note tolerances for the opening.
Panel count matters more than buyers expect. A wide feature wall is usually built as several modules fixed to a supporting frame, so the joint positions need to read as part of the design rather than as an accident on site. Bronze-finish screens are commonly supplied as multi-panel configurations for wide feature walls, with the panel count set to the wall you have.
3. Pattern file and how it will be cut
Attach the pattern in a production-ready vector format — DXF or DWG — at true scale, together with a PDF of the elevation for approval. State the repeat size, whether motifs continue across panel joints, and which areas are cut fully through, engraved or only partially removed. If you are working from an inspiration photo rather than artwork, send that too: fabrication can follow a drawing, photograph or reference image, and a scaled layout should come back for sign-off before any metal is cut.
Also record the sheet thickness you are approving and the minimum feature width the cutting process can hold. Very fine filigree at large scale changes cost and stiffness, and it is far cheaper to loosen a motif on paper than to explain it after installation.
4. Material and surface finish schedule
Write the material and finish as a schedule with one line per screen type, not as an adjective in a paragraph. Reception screens are usually made in stainless steel, and the surface treatment is the decision that needs a physical sample: brushed gold, matte black and antique bronze are three common directions, and each reads differently under warm lobby lighting. A custom gold stainless steel laser cut decorative screen partition in a mirror finish will reflect the reception desk and floor, while an antique bronze stainless steel screen absorbs light and sits quietly against stone. Where a design calls for both, a gold mirror screen with rose gold decorative accents is built as a combined finish and has to be described panel by panel.
List the finish by name, sheen and application method, note whether the reverse side gets the same treatment, and state what is being protected during transit. Exact material grades and thicknesses are confirmed per project rather than assumed from a catalogue page, so keep those fields explicit in the submittal and ask the fabricator to fill them in.
5. Structure, fixing method and interface details
A decorative screen is only as good as what holds it. The package should show the supporting frame or substrate, how panels attach — welded, bolted to a backing frame, or clipped into a channel — and what the floor, wall and ceiling connections look like. Confirm whether the subfloor is screed, timber or steel, whether the screen passes through skirting, and how an adjustable reveal at the head will be handled. For tall free-standing runs, ask for the stability detail and any tie-back to the structure.
If lighting sits behind or inside the screen, state who supplies the fittings, where the driver is accessible, and how the panel can be removed for maintenance. Light and shadow are the reason a laser-cut partition is specified, so the submittal should say what the pattern will cast on the wall behind it and at what distance.
6. Samples and mock-up to approve before production
Ask for two things in writing: a finish sample of the actual sheet with the chosen surface treatment, and a small cut-through sample that includes one representative motif at production scale. Put both on the approval timeline with who signs them off and by when. For a busy reception, a full-height mock-up panel of one module, set against a section of wall finish, is worth the cost — it settles pattern density, joint position and colour in a single viewing.
7. Commercial terms, packing and logistics
The commercial page of the submittal should itemise by panel module rather than quoting one lump sum for "the screen", so variations are priced fairly. Confirm the quantity, unit price, currency, Incoterms, and what is included in the price: packing, loading, inland haulage to port, freight and insurance. If the supplier handles logistics, ask which modes are available — sea, air and rail freight with customs paperwork and door-to-door delivery are common for this type of panel — and which documents come with the shipment: commercial invoice, packing list and certificate of origin. Import duty and local clearance terms are settled per country and belong on this page as an open item rather than a guess.
Packing deserves its own line. Screens with fine cut patterns chip at the edges if they are packed flat against each other, so state the crating method, edge protection, panel identification marks that match the shop drawing, and whether spare panels travel in the same container.
8. Lead time, approvals and installation sequence
Show a simple programme: drawing issue, your approval, sample approval, production, packing, transit and installation. Put the approval dates next to the trade each one blocks — plastering behind the screen, flooring up to the line, lighting first fix. Then state who installs. On-site installation with inspection and snagging after delivery is a service some suppliers offer, but many hotel reception screens are fitted by the local contractor working to the supplier's fixing detail, and both routes need to be decided before the panels ship.
9. Quality checks and handover documents
Close the package with what you will receive at handover: the approved as-built drawing, a packing list keyed to panel marks, the fixing detail, care and cleaning instructions for the finish, and warranty terms in writing. Add the inspection points that matter on screens — flatness across joints, consistent pattern alignment at every panel seam, no handling marks on the mirror surfaces, and touch-up material for any welded joints.
A quick checklist before you send it
- Project, room, drawing revision and enquiry reference on every sheet
- Dimensioned shop drawing with panel split, frame profile and joint positions
- Vector pattern file at true scale plus an approval PDF
- Material and finish schedule with sample sign-off recorded
- Fixing detail for floor, wall, head and any integrated lighting
- Commercial terms by panel module, with Incoterms and packing method stated
- Programme showing approval dates and who installs
- Handover documents listed: as-built drawing, packing list, care instructions, warranty
If you have the layout drawing or even a reference photograph, send it over with the room dimensions and we will return a scaled panel layout, a finish recommendation and an itemised quotation for the reception screen. As part of turnkey interior project solutions, the same package can cover these screens together with the cabinetry, wall panelling, lighting and flooring they sit against, so one submittal cycle covers the whole lobby.