A storage and display combination looks simple on a drawing: open niches here, closed cabinets there, a television recess in the middle. On site it becomes a coordination problem involving wall tolerances, services, hardware, finishes and delivery sequence. When procurement teams specify a Santerson Storage & Display Combo, the documentation they prepare before production starts usually decides whether the installation runs smoothly or turns into a round of site variations.
Because this product is a configurable system rather than a fixed catalogue item — dimensions, layout and finish are set per project — the paperwork has to carry that detail explicitly. The checklist below follows the order in which decisions actually have to be made.
1. Scope and reference drawings
Start with a written scope statement that names the room, the wall elevation and the quantity of units, and attach dimensioned elevations signed off by the design lead. Record which party produced the drawings, the revision number and the date, because later change requests are measured against that baseline. For villa and hospitality packages, note whether the unit is one continuous run or split across walls, and identify any interface with flooring, skirting, ceilings or an adjacent full height storage wall that must align in module depth and reveal.
2. Site conditions measured on the wall, not on the plan
Record finished floor levels, floor-to-ceiling heights at several points across the run, plumb and square deviations, and the position of structural columns, radiators, skirting projections or existing architraves. Note the wall construction — masonry, stud partition, steel frame — because it determines fixing method and load allowance for a wall-mounted television. Where units are free-standing against a wall, document floor coverings and any underfloor heating, since these affect packing, levelling feet and protection.
3. Media and electrical requirements
Television recesses fail most often on services, not joinery. Document screen size and mounting type, the bracket depth required, cable routes, socket positions relative to finished shelf levels, and who supplies power and low-voltage cabling. If the design includes lighting in display niches or shelving — as with integrated LED media units — record transformer and driver locations, switching arrangement, dimming protocol where specified, and access for maintenance. Confirm all lighting and electrical details for the selected configuration before production.
4. Open-to-closed ratio and internal layout
State the intended split between display and concealed storage, and justify it by how the space is used: guest-facing areas usually need more concealed volume for linens, glassware and equipment, while private living areas tolerate more open shelving. Attach an internal schedule showing shelf positions and adjustable spans, drawer stacks and their load rating, hanging rails, and compartments sized for the actual items to be stored. Where a project benefits from both, mixed open and closed storage arrangements are worth comparing against the combined media-wall option so that cost and sightlines can be reviewed together.
5. Materials, finishes and hardware schedule
Specify substrate, door and panel construction, edge treatment, and finish by reference rather than by name alone — a sample code, supplier reference and approved physical sample with signature and date. Document the direction of grain on veneered or wood-effect panels, sheen level, and which faces are visible in the room. For hardware, list hinge and slide brands or models where required, handle or push-open detail, door swing and clearance for adjacent circulation, and soft-close expectations. Record anything that must match existing joinery elsewhere in the project.
6. Tolerances, interface details and fixing method
Write down how the unit meets the building: scribe or filler widths, whether skirting is cut away or the unit sits proud, ceiling shadow gaps, and how levelling is achieved on uneven floors. Confirm the fixing method for the wall type, including any blocking or backing timber that site contractors must install before delivery, and who carries out that preparatory work. Document these interfaces in a drawing note rather than assuming they are obvious; they are the most common source of disputed variation.
7. Compliance, safety and use assumptions
Note the intended user group — family, hotel guest, child — because that drives edge profiles, anchoring requirements and glass selection. Record anchoring details for wall-mounted screens and tall components, load limits for shelves as advised by the manufacturer for the chosen configuration, and any glazing or mirror elements with their thickness and safety treatment. Keep these points in the technical file alongside the purchase order; they are what a client or inspector will ask for later.
8. Commercial terms, packaging and sequence
Record unit rates and any allowances for made-to-measure sizing, the currency and Incoterms applied, packaging standard and piece count per crate, container or shipment plan, and the delivery address with access constraints such as lift size or restricted hours. Confirm who performs on-site installation and who signs off snags. In a fit-out programme, place production after wall-set and first-fix sign-off, and schedule storage-area protection so crates are not opened in wet trades.
9. Approvals, samples and version control
Maintain one register listing each decision — layout, finish, hardware, services, fixing detail — with the date, the person who approved it and the document reference. Close out a physical sample board and a mock-up of the television recess where the project allows it; this is where proportions, reveal widths and cable concealment become visible. Freeze the register before production release, and route any change through written revision rather than site conversation.
10. Handover documentation
At completion, collect as-built dimensions, approved finish references, hardware schedules, adjustment and cleaning guidance for the selected materials, warranty terms applicable to the configuration supplied, and a snag list with closure dates. Photograph the completed unit with doors open and closed, and record spare-parts contacts. This file shortens defect resolution and makes future refurbishment or extension far cheaper.
How SANTERSON supports this process
SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects, operating since 2008. Its services cover design consultation and space planning, custom and OEM production, material selection and product specification, project management and site coordination, logistics with door-to-door delivery, installation and after-sales support — which means the documentation listed above can be exchanged directly with the factory team instead of passing through several intermediaries. Related systems in the same range include full height media walls and integrated media storage, useful when a single combined unit cannot span the wall.
Common gaps to avoid
- Ordering against plan dimensions taken from an architectural drawing rather than site measurements of the finished wall.
- Leaving socket, cable and driver positions to be decided during installation.
- Approving a finish by name only, with no signed sample reference.
- Assuming preparatory blocking, packing or skirting removal is included in the joinery package.
- Skipping handover records, which leaves defects and future modifications without a baseline.
A procurement file that answers these ten areas before production release gives the factory everything needed to build once and correctly, and gives the client a clear record of what was agreed. Because every Santerson Storage & Display Combo is configured per project — dimensions, layout, materials and electrical options confirmed for each order — the documentation is not administrative overhead; it is part of the product specification.