A set of white shaker cabinets looks simple on a mood board and complicated on a quotation sheet. Ask three suppliers for the same kitchen and you will get three different numbers, because each one is pricing a different specification. The difference is rarely the door profile — a shaker door is a flat centre panel inside a four-piece frame, and that shape is standard across suppliers. The difference is everything you did not put in the enquiry: the carcass size, the board behind the paint, the hardware, the appliances the boxes have to fit around, and how the units reach the site.
At SANTERSON we quote kitchen cabinetry for villas, apartment developments and hotel projects from our own factory. The enquiries that come back with a firm number share one thing: the buyer supplied all the information a supplier needs in the first message. Below is the checklist we work from, in the order it matters, so you can send one enquiry instead of four.
1. The drawings — measured, not estimated
A hand sketch with room dimensions written on it is enough to start a conversation, but not enough to price a kitchen. Cabinetry is made to measure, and every centimetre of deviation shows up later as an on-site cut.
- A wall elevation or layout plan showing run lengths, the position of windows, doors, sockets and any structural column. For a villa or hotel guest suite, send the architect's kitchen layout rather than a photograph of a reference image.
- Ceiling height and floor-to-ceiling condition. Full-height tall units, scribe panels and crown detailing change both the panel area and the installation method.
- Floor and wall finish thickness. Tiling and screed already in place, or planned, decide whether we build to the finished line or allow for it.
- Room identification for multi-unit projects. If you are furnishing twelve villas or a hotel floor, tell us how many identical kitchens there are. Repeated layouts are produced as a set, and the unit price reflects that.
If drawings do not exist yet, our design team can work from a floor plan and produce space planning, furniture layouts and 3D renderings before anything goes into production — see our interior design services.
2. The cabinet layout you actually want
"White shaker kitchen, 4 metres" is not a specification. Two kitchens of the same length can differ by dozens of boxes.
- Base units, wall units and tall units, with the width of each run and where the tall larder, oven housing or fridge column sits.
- Island or peninsula, including whether it carries a sink, hob or seating overhang. An island with services needs a deeper carcass and a different plinth.
- Corner treatment. A corner unit can be built as a simple hinged pair, a lazy susan, a pull-out carousel or a blind corner with drawers. Each has a different price and a different internal capacity.
- Open shelving, glass-front doors and display cabinets against closed doors. Glass fronts add glazing, internal lighting and a different door construction.
- Integrated appliances. Send the appliance list with model numbers or at least the dimensions for the oven, fridge, dishwasher and extractor. Appliance housings are built to those dimensions, and getting them wrong is the most expensive correction on site.
Our White Shaker Cabinets are made to measure with material, finish and layout chosen per project, so the drawing set is what fixes the price — not a standard module size.
3. Materials and finish — say which layer you mean
"White shaker" describes a door shape and a colour, not a build. A quotation should state what each part is made of, because that is where the visible quality and the cost both sit.
| Component | What to specify | Why it changes the price |
|---|---|---|
| Door core | MDF, plywood or solid wood frame with panel | Affects stability in humid rooms and how the paint layer sits |
| Surface finish | Lacquered, melamine, PVC-wrapped or acrylic; matte, satin or gloss white | Lacquer and acrylic cost more than a foil wrap and behave differently against fingerprints and cleaning |
| Carcass board | Board type, thickness and edge banding | Determines load-bearing on shelf spans and resistance to moisture in the sink run |
| Back panel and plinth | Thickness, fixing method, plinth material | Affects how the run levels out on an uneven floor |
| Countertop | Whether the worktop is included, and its material and thickness | Often quoted separately; a stone top needs cutouts for sink and hob |
| Splashback | Matching cabinet panel, tile allowance or stone | Adds fabrication if it matches the door finish |
White is not one colour. If you have a paint code, a RAL number or a physical sample you are matching to — a wall, an appliance, an existing door — send it. Otherwise ask for a finish sample before the run goes into production; a warm white and a cool white read completely different against the same worktop.
Where a shaker front has to survive a wetter environment, the substrate matters more than the colour. Our Shaker Style plywood cabinets are offered with project-specific dimensions and finish options for exactly that kind of decision.
4. Hardware, interiors and the small items that add up
- Hinges and slides: brand, soft-close or standard, and whether doors are overlay or inset.
- Handles: knob, cup, recessed pull or a handleless profile edge. Handleless fronts need a routed rail or a channel profile, which is a different door.
- Internal fittings: drawer sets versus shelves, pantry pull-outs, cutlery trays, bin housings, laundry hampers in a utility run.
- Lighting: under-cabinet strips, cabinet interior sensors, transformer location and the cable route to it.
- Kick plates and ventilation for any appliance housing that requires it.
List these as a bill of items rather than assuming they are included. Two quotations at the same headline price can differ by forty small components.
5. Quantity, project type and delivery location
A single residential kitchen and a forty-apartment development are not priced the same way. Tell the supplier:
- the number of kitchens, utility rooms or guest-suite vanity units in the package;
- whether units repeat across floors or villas, and whether you want one prototype approved before the rest are produced;
- the delivery address, and whether it is a port, a warehouse or directly to site;
- who is responsible for import clearance and on-site installation in your country.
We handle freight by sea, air and rail with the associated paperwork and door-to-door delivery, arranged through logistics and door-to-door delivery. For Australian projects we have delivered villa and apartment packages to Sydney, Melbourne, Perth and Willoughby; the shipping terms, duties and site access for each project are confirmed case by case rather than assumed.
6. Programme dates and what has to be decided first
Give the supplier two dates: when the cabinetry must arrive on site, and when the wet trades — tiling, screed, plaster — will be finished in that room. Cabinetry is measured against finished floor and wall levels, so a measurement taken before tiling needs an allowance that has to be agreed in writing.
Then flag the decisions that gate production: appliance models, worktop material, finish sample approval and the final layout sign-off. Every one of these can be resolved in parallel with design review; none of them can be resolved after panels are cut.
A short checklist to paste into your enquiry
- Layout drawings or a floor plan, with ceiling height and services located
- Unit-by-unit layout: base, wall, tall, island, corner type
- Appliance list with dimensions or model numbers
- Door core, surface finish, white reference or sample, carcass specification
- Hardware and internal fittings list; lighting included or not
- Worktop and splashback: included, supplied by others, or excluded
- Quantity of each kitchen type and whether units repeat
- Delivery address, Incoterms preference, who installs on site
- Required arrival date and the date wet trades finish
Common questions
Can you quote from a photograph of a kitchen I like?
We can give an indicative range, but not a firm price. A photograph shows the door profile and colour; it does not show carcass depth, board type, hardware or the layout behind the doors. Send the photo as reference and the drawings as specification.
Do white shaker cabinets come in standard sizes?
Not from us. The collection is made to measure — width, height and depth are set to the room, which is why a measured drawing is required before pricing. Where a project has repeating layouts, the same dimensions are produced as a matched set.
What if my project needs more than cabinets?
Then send one enquiry covering the whole fit-out. Wardrobes, vanities, doors, wall panelling, flooring and lighting from a single one-stop furniture and building materials supplier means one drawing review, one production schedule and one shipment, instead of four suppliers coordinating with each other by email.
Send us the drawings
Email your layout, appliance list and finish preference to santerson@qq.com, or reach PHILLIP on WhatsApp at +86 139 2821 4007. We will come back with a specification sheet listing every component in the price, so you can compare quotations line by line.
More about how we take a project from drawing to handover: Turnkey Solutions and Contact Us.