A classic wooden hinged wardrobe rarely fails on style. It fails on fit: a door that fouls a skirting board, a carcass that no longer matches the ceiling line, a handle that clashes with the ironmongery schedule signed off three months earlier. Because these built-in furniture pieces are made to measure for each room, the drawings and the site conditions have to agree before production starts. This guide walks through what a procurement team, interior designer or contractor should confirm at each stage so the wardrobe arrives ready to install.

Start from the drawing set, not the product catalogue

Product pages show door profiles, panel detail and finish options. They do not show your room. Before specifying anything, pull the reflected ceiling plan, the internal elevation for the wall the wardrobe sits on, and the floor finishes schedule. Note the finished floor level, the depth of any cornice or skirting, the position of downlights and air grilles, and whether the wall is truly plumb. On older villas and renovated properties, walls are frequently out of line by enough to matter, and a made-to-measure carcass will follow whatever dimension it is given.

Mark three things on the elevation before you send it for quotation: the clear opening width and height, the depth available after doors swing, and any obstruction within 300 mm of the wardrobe face. A hinged door needs a clear arc. If a bed, a radiator or a light switch sits in that arc, say so now rather than on installation day.

Choose the door construction before you choose the colour

Within our hinged-door range, Classic Wooden Hinged Wardrobes covers the panelled, traditional look that villa and hospitality bedroom schemes call for most often. Panel width, moulding profile and finish are specified per project, so the same elevation can be resolved as a restrained shaker-style detail or something more decorative to match existing joinery.

Where the brief calls for solid timber with a paneled front, Classic Paneled Solid Wood Wardrobes is the closer match. Where a lighter, flatter profile is wanted against contemporary wall panelling, our shaker panel wardrobe option sits in the same classic paneled family and coordinates easily with matching cabinetry in the same dwelling. Keep one construction logic across a floor: mixing panel radii and stile widths between rooms is what makes a set of joinery look bought piecemeal.

Confirm the internal layout against how the space will be used

The external elevation is only half the drawing. Hang heights, drawer bank positions and shelf spans should come from the client's storage brief or, for a hotel or serviced apartment, from the room operating standard. Long-hang sections for coats and dresses, a mirrored interior panel, soft-close drawer runners, an integrated lighting strip, and provisions for a safe or a luggage rack are all decisions that change the carcass build, so they belong on the drawing before order.

  • Hanging rail heights and the number of long-hang versus short-hang sections
  • Shelf spans, and where a shelf must carry weight rather than linen
  • Drawer bank height and whether runners are specified soft-close
  • Interior lighting, its transformer location and how it is switched
  • Ventilation requirements for any section enclosing an air handler or laundry appliance

Reconcile the schedule with what is already on site

The most common coordination failures are not wardrobe problems; they are interface problems. Check the wardrobe line against the flooring contractor's setting-out, the electrician's back-box positions, and the joiner's architrave and skirting runs. If the wardrobe is to sit flush with a wall panel run, the reveal needs to be drawn, not improvised on site.

Our interior design services cover exactly this step: space layout planning, furniture layouts and 3D visualisations, then drawing and production coordination with guidance during installation. For a project that also needs cabinetry, doors, wall panelling or flooring from the same supplier, turnkey interior project solutions put those trades under one production and delivery plan, which removes most of the finger-pointing between packages.

What to send for an accurate quotation

  1. The relevant elevations with finished floor and ceiling levels marked, in millimetres
  2. A dimensioned internal layout for each unit, or a storage brief you want us to resolve
  3. Finish references: timber species or veneer, paint or lacquer code, ironmongery sample
  4. Site conditions that affect installation — access routes, lift sizes, floor coverings already laid
  5. The delivery destination and the required on-site sequence for each room

Dimensions and selected specifications are confirmed for every project before manufacture begins. If an elevation is provisional, say so; it is far cheaper to revise a drawing than to re-make a carcass.

Delivery, installation and handover

Wardrobes travelling internationally need packaging and a crate schedule that match the site sequence, so units arrive in the order rooms are ready for them. Our logistics covers freight by sea, air or rail with the associated documentation and door-to-door delivery, and installation is followed by inspection and snag resolution against an agreed list. Confirm import terms, duties and the exact delivery scope for your country with us in writing before you commit to a programme.

A classic wooden hinged wardrobe should read as part of the building, not as furniture placed against a wall. That result comes from the drawings and the site survey agreeing on millimetres — and from a supplier who builds to those numbers rather than to a nominal size.

Send us your elevations and finish references for a made-to-measure wardrobe quotation: contact SANTERSON.