Paneled hinged wardrobe doors are the part of a built-in wardrobe that shows. A raised or recessed panel, a moulded frame, a finish that has to match the rest of the joinery — all of it travels from a factory floor to a bedroom on the other side of the world, handled several times on the way. Before you place an order, ask the supplier how those doors leave the building, not only how they look in the sample.
Why packaging is a wardrobe question, not a freight question
Hinged wardrobes such as our Paneled Hinged Wardrobes are made to measure for each project, so a damaged door is not something you replace from stock. The panel profile, the colour and the edge detailing have to be produced again to the same specification, and that rework lands on your installation date. Cabinet boxes can usually absorb rougher handling because they are covered by plinths, scribes and adjoining units. A paneled door has nothing covering it.
Hinges add a second exposure. Once doors are hung on site, the load sits on the fixing points in the carcass. If a door has been flexed or warped in transit, the hinge screws will not hold the alignment, and the gap between the door edge and the frame becomes a snag list item rather than a manufacturing fault you can claim against.
What to ask the supplier to confirm in writing
These are the points we settle with buyers before production starts, and they apply whether your order is one apartment or a villa floor of bedrooms:
- Pack type per component. Carcass panels flat-packed, doors packed separately and upright or on edge, mirrors and glass fronts crated on their own. Ask for the packing list before loading, not after.
- Door protection detail. Corner protectors on framed doors, face protection on the finished panel, and separation between stacked doors so finishes do not rub against each other.
- Container bracing. How the units are blocked, strapped and dunnaged inside the container, and who is responsible if cargo shifts in transit.
- Pallet and carton marking. Each unit marked with the room or apartment it belongs to. On a multi-bedroom project this decides whether your site team can find the right door on the right day.
- Spare fixings and hardware allowance. Hinges, handles, shelf pins and cam locks packed loose and labelled, with enough spare for site adjustments.
- Photographs before sealing. Photos of packed cartons, the loaded container and the seal number, sent to you before the vessel departs.
How our wardrobe packaging is arranged
Our Classic Wooden Hinged Wardrobes and Flat Panel Hinged Wardrobes are made to measure, with material and finish selected per project and a layout drawn around the room. That same project-by-project approach carries into the packing stage: doors travel protected as finished faces, carcass components are packed so they support each other, and the whole consignment is documented with a packing list you can check against on arrival.
Freight is handled by our own logistics coordination — sea, air or rail, with customs paperwork prepared alongside the shipment, container loading arranged at our end and door-to-door delivery to site. Because one team handles production through delivery, a packaging question raised before loading gets answered by the people who packed it.
Checking the goods when they arrive
Give the receiving team a short checklist before the containers are opened:
- Photograph before opening. Container exterior, seal, and any dented or wet cartons, before anyone cuts the strapping.
- Count against the packing list. Carton count per room, not just total cartons.
- Inspect door faces first. Open one carton of doors before unpacking everything. A finish problem repeats across the batch, and you want to know on carton one.
- Stand a door upright. Check for twist or bow along the length before it goes on the carcass.
- Report damage the same day, with photos and the carton marking, while the container is still on site.
A short packaging specification you can send to any supplier
If you want a simple way to make the requirement comparable across quotations, ask each supplier to confirm the same six lines: pack type per component; door face and corner protection; internal container bracing method; carton marking by room or unit; loose hardware allowance; and pre-loading photographs with seal number. A supplier who answers all six in writing is telling you how your wardrobe will actually arrive.
Send us the room dimensions, the finish you are working to and the delivery address, and we will confirm the specification together with how the paneled hinged wardrobe doors are packed for your route.