A Laundry & Storage Combo is a made-to-measure unit: carcass panels, doors, drawer runners, shelves and sometimes an integrated hamper column all travel from the factory to the site as separate components. Because it belongs to our Laundry Integration collection for residential bathroom projects, the unit is usually built to project-specific dimensions and finishes, which means nothing on site can be swapped in from a local shelf if a part arrives damaged. Packaging is therefore not a detail left to the last minute — it decides whether the panels arrive ready to install or whether your programme slips while replacements are re-made and re-shipped.

Below is what procurement teams, builders and interior contractors should confirm with the supplier before the unit is crated, and how those confirmations are recorded so that both sides are working from the same document.

1. Confirm how the unit ships: flat-packed or pre-assembled

The first question is the shipping method itself, because it changes everything downstream. Tall, made-to-measure units are usually flat-packed so that panel thickness, not assembled volume, drives the freight cost; a pre-assembled cabinet, by contrast, needs a larger crate and far more protection around the corners and door faces. Ask the supplier which method applies to your order and get it in writing on the packing list.

  • Whether carcasses ship knocked-down or partly assembled, and which parts are pre-fitted at the factory.
  • Door and panel protection: edge protectors, corner guards, and interleaving between faces so finishes do not rub in transit.
  • Whether hardware — runners, hinges, handles, legs — is boxed separately and labelled to the unit it belongs to.

2. Confirm the crate and carton specification

Ask for the actual packaging standard rather than a general assurance that goods are "well packed". For cabinetry moving by sea, the practical questions are about materials and moisture.

Item to confirm Why it matters on site
Timber crate or plywood case, and whether the timber is treated and marked Solid timber packaging is subject to fumigation or heat-treatment marking requirements in many destinations; missing marks can hold a consignment at customs.
Moisture barrier and desiccant inside the carton Board panels and decorated faces are the parts most affected by condensation inside a container on a long sea leg.
Footprint, height and weight of every package Determines whether the delivery fits your lift, stairwell or unloading bay, and how many people the offload needs.
Package count per unit A unit delivered as six cartons must be checked in as six; a short carton is only noticed at installation if the count was recorded at delivery.

3. Confirm labelling matches your project, not just the order

On multi-apartment or multi-villa work, unlabelled cartons are the most common cause of installation errors. Each package should carry the project reference, the unit or room code, the package number in the sequence (for example 3 of 6), and the product name so that crews place cartons in the correct dwelling rather than consolidating them in one storage area.

Ask for a photo record of the packed crates before the container is loaded. A short set of images, plus the marked carton faces, gives both sides a reference point if damage is claimed after arrival.

4. Confirm how the order joins a larger shipment

Laundry units rarely travel alone. Where a project also orders Stacked Laundry Units, WasherDryer Cabinets or bathroom joinery from the same supplier, confirm whether the items are consolidated into one container and how mixed cargo is separated. Fragile components — mirror panels, glass-front doors, stone or engineered-stone tops — should be crated and positioned so they are not loaded against heavy carcasses.

Confirm which documents will arrive with the shipment: commercial invoice, packing list and any certificates the destination requires. Our Logistics & Door-to-Door Delivery service covers freight booking by sea, air or rail, export paperwork, container loading and delivery coordination, so the packing list you approve before production is also the document your receiving team should expect at the gate.

5. Confirm the damage and spare-parts route in writing

Before the goods move, agree what happens if a panel is damaged. The practical points are: who inspects within how many days of delivery, what photographic evidence is required, whether single replacement panels can be re-made against the original made-to-measure specification, and how replacements are shipped. A made-to-measure unit means a replacement panel has to be produced to the same dimensions and finish as the batch already installed.

  • Inspection window after delivery and the evidence format expected for a claim.
  • Whether replacement panels are re-made to the original shop drawings.
  • Who pays freight on replacements, and under what circumstances.
  • Which spares — runners, hinges, handles — can be held locally by the installer.

6. Confirm dimensions and finish against the approved drawings before packing

The cheapest packaging failure to avoid is a correctly packed wrong item. Because Compact Laundry Solutions and the wider Laundry Integration range are specified per project — layout, material, finish and dimensions all confirmed for each space — the final shop drawing should be signed off before crating begins, and the crate labels should quote that same drawing revision. If site dimensions were re-measured after production started, that revision has to reach the packing stage, not just the workshop.

Putting it together

A short packaging confirmation sheet attached to the purchase order is usually enough: shipping method, crate specification and timber treatment, moisture protection, package count and dimensions, labelling convention, pre-shipment photos, document set, damage route, and the drawing revision being packed. Suppliers who work on project orders are used to these points; if the answers come back vague, that is a useful signal before production starts.

If you are specifying laundry or bathroom joinery for a villa, apartment or hospitality project, send us the room layout and appliance sizes and we will confirm the configuration, packing method and delivery plan for that specific order through our contact page.