A hotel guest-room fit-out rarely fails over the toilet itself. It fails over the paperwork, the trap orientation and the container that carries thirty or three hundred of them across an ocean. This guide walks through how we plan an international project order of the Two Piece Washdown Toilet 1038A, a dual S-trap and P-trap ceramic WC made for hotel bathroom work, from the first quantity take-off to handover on site.
Start with the trap type, not the quantity
The 1038A is a two-piece vitreous china WC supplied for both outlet arrangements: a wall outlet P-trap and a floor outlet S-trap. That single decision drives everything downstream — where the waste pipe is routed, whether the cistern sits on the pan or behind a frame, how much duct space each bathroom needs, and which spare parts you hold after handover.
Before any quantity is confirmed, ask the local plumbing consultant for the outlet type per room type, per floor. In retrofit work it is common to find two different arrangements inside one building: guest rooms rebuilt on existing soil stacks, and new rear-of-house or service bathrooms cast with a different layout. Order those as separate lines on the same purchase order, not as one blended figure.
The rough-in dimensions published for this model are 180mm for the wall-mounted P-trap and 250mm for the floor S-trap. Treat them as design inputs to check against your drawings and against the technical sheet that ships with your batch, because site conditions and final documentation take precedence over a catalogue figure.
Build the quantity list around room types
Hotel procurement goes wrong when WCs are counted by floor area instead of by room type. A workable take-off groups every bathroom into a small set of repeating types and lists what each one contains:
- Guest room standard. The 1038A in the trap configuration for that stack, plus seat, fixing set and the flush actuation specified for the project.
- Accessible room. Same pan, but confirm the grab-rail positions and cistern height before ordering, because they change the waste set-out.
- Staff, back-of-house and F&B restrooms. Where a matching Floor Standing Bidet 1038F or other pieces of the same 1038 series are used, list them as their own line so glaze colour and profile stay consistent across the property.
- Spares. A per-hundred allowance for pans, seats and cistern internals held on site protects you against installation damage and post-handover replacements.
Send that list as a schedule rather than a number. As a one-stop furniture and building materials supplier, we price and pack against the schedule, which is also what your customs broker and your main contractor need to reconcile deliveries.
Lock the specification before production starts
Once trap type and quantities are fixed, we confirm the remaining details in one pass instead of several. Getting this into a single signed-off sheet is what keeps a project order moving:
| Outlet and rough-in | P-trap wall outlet or S-trap floor outlet per room type, with the rough-in dimension cross-checked against the technical sheet for the batch. |
| Seat and actuation | Seat profile, closing action and the flush arrangement specified for the property, recorded on the same sheet as the pan. |
| Packaging standard | Individual carton with reinforced corners and corner protection for ocean transit, marked with room type or block so crates can be released floor by floor instead of being sorted in the laydown area. |
| Consolidated loads | Ceramics travel well alongside other sanitaryware, vanities, wall panels and lighting from the same fit-out package. Combining them into shared containers reduces handling and keeps glaze-colour batches together. |
| Documents | Commercial invoice, packing list and origin paperwork prepared to match your broker's requirements before the container is gated in. |
Our Custom & OEM Service covers project-level customisation of this kind of order — finish and specification choices, private labelling where the client wants it, and flexible minimum order quantities so a phased hotel programme can be released in stages rather than bought in one hit.
Plan the freight around the site's storage reality
Sanitaryware is heavy, brittle and time-sensitive. A container of WCs sitting in a hot yard for two weeks, or being unloaded into an open laydown area with no shelter, costs more than the freight saving that caused it.
Our Logistics & Door-to-Door Delivery service covers sea, air and rail freight forwarding, customs paperwork, packaging and container loading plans, shipment tracking and delivery to the project address. For a multi-tower hotel programme we usually split the shipment to match the construction sequence — wet-area first fix ahead of finishes, guest-room floors before back-of-house — so each batch goes straight from truck to lift lobby rather than into storage.
Two practical points that save buyers real money:
- Weigh the mixed load early. Ceramics are dense; a container can hit its weight limit long before it hits its volume limit. Mixing WCs with lighter items from the same fit-out, such as wall panels or lighting, uses the payload properly.
- Agree Incoterms and duties in writing. Whether you take FOB or a delivered-to-site arrangement changes who carries insurance and who clears customs. Confirm this for your specific destination before pricing is treated as final.
Receive, inspect and install in one controlled sequence
Inspection happens at the point of unloading, not at handover. Each carton is checked against the packing list for the room type it is marked with; pans are inspected for glaze damage and hairline cracks before they leave the pallet. Anything rejected is photographed against its carton marking and reported the same day, which keeps replacement decisions inside the production window instead of after the container has gone.
Our Installation & After-sales Support covers on-site installation guidance, inspection and snag lists, warranty coverage and spare parts. For a 1038A order that means the trap conversion is verified against the drawing before the pan is set, the cistern connection is tested under the building's working pressure, and the seat and actuation are checked against the signed specification sheet.
Warranty terms, response times and what a snag list covers depend on the contract for your project. We agree those in the same document that fixes quantities and packaging, so nobody is arguing about scope while rooms are being handed over.
A pre-order checklist
- Trap type confirmed per room type and cross-checked against the waste drawings.
- Rough-in dimensions verified against the technical sheet for the batch, not just the catalogue page.
- Quantity schedule split by guest room, accessible room, back-of-house and spares allowance.
- Seat, actuation and any matching 1038 series pieces listed on the same order.
- Carton marking mapped to block, floor and room type for staged unloading.
- Incoterms, insurance responsibility and clearance party agreed in writing.
- Inspection point, rejection reporting route and spare-parts holding agreed before shipment.
SANTERSON has been manufacturing furniture and building materials in China since 2008, supplying project customers across hospitality, villa and office work. If you are assembling a hotel bathroom package — ceramics, vanities, showers, lighting, cabinetry and finishes from one sanitary fixtures and fit-out programme — send us the room schedule and we will build the order, the packing plan and the delivery sequence around it.