A rendered drawing shows a recess in the wall, softly lit, holding a vase and two books. It looks simple enough to specify in one line. Then the builder replies with three questions: what is the finished opening size, what supports the shelves inside the recess, and which material wraps the reveal. That is usually the moment a design brief stops being a picture and starts being an order.
Bespoke open storage is not a catalogue item you can pick off a shelf — it is fabricated to your wall. The quality of the result depends almost entirely on how precisely the enquiry describes what the client actually wants. Below is the working method our team uses when an inquiry about niche shelving arrives, and the shortlist of information that lets us price it properly the first time.
Start with the job type, not the product name
The same recess detail appears in very different scopes. A single apartment bathroom, a guest-room floor in a hotel, and a villa where the joinery runs through every storey all need different paperwork, different production planning, and different delivery arrangements.
Before anything else, tell us which of these you are specifying for:
- One-off residential work — a renovation or new build, usually measured on site by your own team.
- A multi-unit or hospitality programme — repeated bathroom or corridor details across several rooms, where consistency of finish between units matters more than any single piece.
- A whole-villa fit-out — open storage coordinated with wardrobes, vanities, wall panelling and doors from one manufacturer, which is the situation our turnkey interior project solutions are built around.
This single sentence changes how we read every dimension you send afterwards. It also tells us whether to quote a standalone piece or plan it as part of a run of matching cabinetry.
The dimensions we need before we can draw anything
A screenshot with a scale bar is not enough. For each niche, send the following as numbers on a sketch or a marked-up wall elevation.
| Item | What to record | Why it changes the build |
|---|---|---|
| Finished opening size | Width, height and depth of the completed recess, in millimetres | Determines the frame, the shelf spans and whether a rebate or an inserted box is needed |
| Reference line | Distance from finished floor level and from the nearest wall face | Fixes setting-out on site; rough openings move after plasterboard goes up |
| Wall build-up | Stud, masonry or tiled substrate, and total wall thickness | Decides how the unit is fixed and how the reveal is closed off |
| Shelf layout | Number of shelves, spacing between them, and whether any shelf is thicker than the others | Governs visible shadow lines and load capacity for heavier objects |
| Adjacent finishes | Paint, tile, stone, panelling or wardrobe carcass meeting the niche | Determines which edge detail we fabricate so the junction stays tight |
If a level change, skirting, or a piped wall sits inside the recess, say so. Those are the conditions that most often turn a clean drawing into an on-site cut.
Materials and finishes: name what you want, then let us confirm it
Our open storage is made to measure, so the specification has three parts rather than one product code:
- Carcass and shelf material. Board substrate and any moisture-resistant requirement for wet areas.
- Surface finish. Painted lacquer, laminate, wood veneer, or a matched colour standard. Send the brand and code if you have one; send a photograph if you do not.
- Edge and reveal treatment. Square edge, rounded edge, or a framed reveal that meets the surrounding wall finish.
Where the niche is part of a larger wall, we normally recommend specifying it together with the panelling so the two are fabricated from the same batch and finished in the same run. Our custom niche paneling covers that combined detail — the recess built as part of the panel system instead of cut into it afterwards.
For display storage inside a full-height wall unit, the same principle applies at a larger scale. Open display niches in an integrated storage wall need their proportions set against the closed doors beside them, because the rhythm of open and solid bays is what makes the wall read as designed rather than assembled.
Lighting, load and use — three details that are easy to leave out
- Light. If a recess is meant to glow, the cable route, driver location and switching need to appear on the drawing before fabrication. A niche lit after installation shows its hardware.
- Load. Books, ceramics, toiletries and planters all weigh differently. Tell us what will sit there so shelf thickness and support are sized for it.
- Cleaning and access. Open shelving in a bathroom or corridor gets touched. Depth and shelf spacing should let a hand reach the back of the shelf.
What we send back, and what happens next
With the job type, dimensions and finish intent in hand, an enquiry moves through the same route as any of our custom work:
- Brief and proposal. We review your drawings, flag anything that conflicts with site conditions, and put together a quotation with the specification broken out by item. Where the design still needs resolving, our interior design services cover space planning, furniture layouts and 3D renderings before production is committed.
- Detail confirmation. Shop drawings go back to you for sign-off: opening sizes, shelf positions, finish samples and the junction details against neighbouring finishes. Nothing enters production until those drawings are approved in writing.
- Production, shipment and follow-up. Fabrication, then freight and door-to-door delivery arranged by our logistics team, with installation support and after-sales cover afterwards.
A worked example from our own project work
Our arched niche and full house custom wall cabinet project shows what happens when the brief arrives as a design intent rather than a product request. The client wanted arched display recesses with concealed lighting for ceramics and artwork, layered floating shelves, a full-height wardrobe in flush wood-grain panels, an integrated vanity, and a marble bathroom countertop — all read as one continuous wall.
Because the arch radius, shelf depths and lighting were settled at drawing stage, the niches came out of the same production run as the wardrobes and vanity, in one matched finish. That is the outcome a complete enquiry buys you: fewer trades on site, one point of responsibility, and finishes that actually match across rooms.
Before you send the enquiry — a quick check
- Job type and location, plus whether this is one piece or a repeated detail
- Finished opening width, height and depth in millimetres, with reference lines from floor level
- Wall build-up and substrate behind the recess
- Shelf count, spacing and what will be stored on them
- Finish required, with brand and colour code where available
- Lighting intent, including cable route and switching
- Adjacent finishes that meet the niche edge
- Drawings or photographs of the wall, even rough ones
Send whatever you already have. A half-resolved brief is still workable — we will come back with the specific questions it leaves open, and that exchange is usually where the specification becomes firm.
SANTERSON has been manufacturing furniture and building materials in China since 2008, supplying custom and OEM pieces for villa, hospitality and office projects overseas. Send drawings, dimensions and finish references for niche shelving or any other bespoke joinery, and we will return a specification and quotation.