Open modular units look simple on a rendering: a run of open shelving and display niches, integrated into a living wall or dividing one zone from another. They are deceptively difficult to build and install, because there is nothing to hide behind. Every shelf depth, every vertical joint and every out-of-plumb wall shows up in the finished work. The difference between a clean installation and an expensive rework is usually settled before production starts — in how the design drawings and the site conditions agree with each other.

What makes open modular units different from closed cabinetry

Our Open Modular Units belong to the Modular Living Systems collection and are made for residential projects, with finish, layout and dimensions specified per space. Unlike a closed unit, an open run exposes the interior surfaces, the shelf edges and the shadow gaps between modules. Three consequences follow directly:

  • Interior panels become visible faces, so material and grain direction have to be agreed, not assumed.
  • Shelf spans are read at eye level, so span, thickness and deflection need confirming rather than leaving to the workshop.
  • Modules meet each other in the room, so cumulative tolerance across a long run must be planned for on paper first.

Projects that mix open runs with closed storage typically combine our Closed Modular Units, or a single composition of both, in the same elevation. Where the run stops short of a full wall, matching Open Modular Shelves from the Modular Shelving Systems collection can carry the same finish into an adjacent zone.

Reading the design drawings: what must be fixed before production

A dimensioned elevation is not enough. Before we quote and cut, we ask the design side to confirm six items on the drawings. Anything left open becomes a variation order later.

Drawing itemWhat it fixes on site
Datum line and setting-out dimensionsWhere the run starts, in relation to a fixed wall face rather than a finished floor edge — this is what keeps vertical joints aligned with door reveals and skirting.
Module widths and joint sizesThe rhythm of the elevation. Joint width stated on the drawing is what the workshop builds to; leaving it blank invites inconsistent gaps.
Shelf spans, depths and thicknessLong open spans need a confirmed panel thickness and, where needed, a support detail. Fix this on paper, not after installation.
Interior face material and edge treatmentWhich surfaces are visible, which finish they carry, and how exposed edges are lipped or mitred.
Integrated lighting and servicesCable routes, driver positions and access points. Drivers need to remain reachable after the unit is fixed to the wall.
Interface detailsHow the unit meets floor, ceiling, skirting, cornice and adjacent joinery, including whether scribes are used and on which side.

We work from drawings supplied by your architect or interior designer, and our interior design service can add space layout planning, furniture layouts and 3D visual renderings where the design package is still at concept stage. Coordination of drawings and production, plus on-site guidance, is part of that scope.

Checking site requirements before you commit to dimensions

Drawings describe an ideal room. Site conditions rarely match them exactly, and open units amplify the difference. Take these measurements from the actual space, and record them in writing rather than relying on the architect's plan:

  • Wall plumb and flatness. Measure at several points along the run. A wall that leans or bows changes the reveal at the top of an open unit far more visibly than it does on a closed box.
  • Floor level along the run. For floor-to-ceiling compositions, an unlevel floor shifts every horizontal shelf line unless it is compensated in the base detail.
  • Ceiling height variation. Take heights at both ends of the run, not one point. A single average figure causes gaps that have to be scribed on site.
  • Position of switches, sockets, outlets and returns. In an open run these sit inside the display area, so their positions must appear on the elevation.
  • Skirting, cornice and architrave depths. These determine whether the unit sits off the wall or is cut around them.
  • Access route and lift or stair dimensions. Module size is limited by what can physically be brought into the room; oversized sections that cannot reach the space have to be split and joined on site.

Because sizing is made to measure, we confirm the site-verified dimensions and selected specifications for each project before production. Drawings and site measurements are reconciled once, at that point — not in parallel by two parties.

Reconciling drawings with site conditions: the sequence that avoids rework

The practical order of work we follow on a joinery package is short, and skipping a stage is what causes most problems:

  • Brief and proposal. Layout intent, finish direction and the scope of the run are agreed against the design drawings.
  • Quotation and detail confirmation. Site-verified dimensions, material and finish selections, joint sizes, lighting provisions and interface details are locked. This is where open shelving spans and panel thickness get signed off.
  • Production, shipment and follow-up. Manufacturing follows the confirmed details, with quality control before packing; delivery and installation then follow the same documents.

Where an existing drawing and a site measurement conflict, resolve it before cutting. Typical decisions: shift a vertical joint rather than shrink a display niche; keep a nominal module width and take up the difference in a scribe at the concealed end; or re-space shelves so that an out-of-level floor does not read across the whole elevation. Those calls are cheap on paper and expensive once panels are machined.

Our custom and OEM service covers bespoke material, finish and texture choices as well as prototyping, which is worth using when a project specifies an unusual surface on open shelving — visible faces show every defect in a finish. And because these units usually arrive alongside other fit-out items, our one-stop solution covers material selection and product specification across the whole package, so modular walls, cabinetry, wall finishes and lighting are specified against one coordinated set of documents instead of several.

A pre-production checklist for open modular units

  • Setting-out dimensions taken from a fixed wall face, with the datum stated on the drawing.
  • Module widths and joint sizes written down, not implied by the elevation.
  • Every open shelf span has a confirmed depth, panel thickness and support detail.
  • Visible interior faces, edge treatment and grain direction specified.
  • Lighting cable routes, driver positions and access points shown on the drawings.
  • Switches, sockets and service outlets located on the elevation.
  • Floor level and ceiling height variation recorded along the full run.
  • Interface details for floor, ceiling, skirting and adjacent joinery agreed, including scribe positions.
  • Module sizes checked against lift, stair and doorway access on site.
  • Site-verified dimensions and final specifications confirmed in writing before production begins.

If a project combines open display with concealed storage in one wall, review the open and closed options together at the detail stage — Mixed Open & Closed Systems are specified as one composition, so joint sizes and finishes carry across both without a mismatch at the meeting point.

Delivery, installation and what happens after

Open units travel well in knocked-down or part-assembled form, but they are unforgiving to install. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, packaging and container loading, customs paperwork and shipment tracking, with delivery arranged to the project address. Import terms, duties and transit arrangements are confirmed case by case for each destination, so we agree them with you rather than assuming a standard set.

At the site, installation is followed by inspection and snag resolution, with warranty coverage, spare parts and ongoing maintenance handled through our installation and after-sales support. Warranty terms and response arrangements should be confirmed in writing for your specific project, since cover varies by product.

Bringing drawings and site conditions into one set of facts

Open modular units succeed when the design package and the measured site agree before any panel is cut: datum, module rhythm, shelf spans, visible faces, service positions and interface details all confirmed once and used by everyone downstream. As a furniture and building materials manufacturer working on villa, hospitality and office projects since 2008, we build these systems to project-specific dimensions and finishes and coordinate them with the rest of the fit-out from production through to installation.

Send us your elevation drawings and site measurements for an open modular run, and we will return a proposal with confirmed module sizes, shelf spans, finish schedule and interface details before production. Contact SANTERSON to start the detail review.