A wardrobe line that looks identical in two project photographs can still differ in timber species, panel construction and internal layout. That is why procurement teams treat classic paneled solid wood wardrobes as a specification item rather than a catalogue pick. When joinery arrives with the wrong substrate or an interior configuration that does not match the bedroom scheme, the rework falls on the trade package.

Why paneled solid wood joinery needs a written record

Panelled doors are assembled from a frame, infill panels and a finish system. Each layer is a decision point, and each one moves price and lead time. A door with a recessed centre panel and a door with a raised profile in the same colour can read consistently on a rendering yet behave differently once installed against skirting, cornice and floor finishes.

Our Classic Paneled Solid Wood Wardrobes are made to measure, with material and finish options and a layout set for each project. None of that is fixed until it is written down and approved, which is the purpose of the documentation trail below.

The seven records to hold for every wardrobe line

RecordWhat it should state
Room-by-room scheduleUnit tag, room, width and height dimensions taken from finished surfaces, plus notes on obstructions such as downlights, air-conditioning returns and door swings.
Door construction noteFrame and infill detail, profile direction (recessed or raised), stile and rail widths, and the panel core construction. Within the classic paneled range this covers shaker panel, raised panel and recessed panel doors.
Species and colour referenceTimber species named for each unit — oak, walnut and cherry are the references we work to most often — with stain or paint code, sheen level and the sample the approval was based on.
Interior layout drawingHanging heights, shelf spans and depths, drawer bank position and any lighting provisions. Where a bedroom is intended to work as a dressing room, record it against a walk-in wardrobe layout instead of assuming a standard carcass.
Opening method and clearanceHinged, sliding or open configuration, with the swing or slide envelope shown on plan so adjacent furniture and the traffic line stay clear.
Interface detailsHow the unit meets floor, ceiling and side walls; scribe and filler sizes; architrave and skirting treatment; and the setting-out drawing where an arch or niche is involved.
Approval and change logDate, approver and revision number for every drawing and sample release, with superseded versions marked rather than deleted.
A practical test: if a replacement door had to be manufactured after handover using only the documentation pack, could it be produced without disturbing the installed unit? If not, the record is incomplete.

How those records get created on a project

For residential and villa fit-outs the sequence runs from brief to site. Space planning and 3D renderings fix the appearance; production drawings then convert that appearance into dimensions, materials and hardware. The interior design service covers that coordination step, including drawings, production liaison and on-site guidance.

Where a profile or dimension sits outside the standard range, the custom and OEM service handles prototyping and finish development before the order is released. Species availability, panel construction and minimum order quantities should be confirmed at that stage — they are the variables most likely to move a quotation.

Delivery follows the programme through logistics and door-to-door delivery, with packaging and container loading planned around the joinery schedule, and installation and after-sales support covering fitting, inspection and snag closure. Warranty terms and response arrangements are confirmed project by project rather than carried over from a previous order.

Documentation gaps we are asked to correct

  • A colour approved on a sample board but never tied to a species, so the same finish reads differently over a lighter timber.
  • Profiles described simply as "classic" across several rooms, with no drawing showing which doors are recessed and which are raised.
  • Internal layouts approved from a rendering that hides hanging heights and drawer positions behind closed doors.
  • Dimensions recorded from structural walls instead of finished surfaces, leaving the scribe allowance to be solved on site.

Closing those gaps costs one extra drawing round. Leaving them open costs a site visit and a re-manufacture. If you are preparing a wardrobe package for enquiry, send the room schedule with the door construction note and the species reference — enquiry details are on the contact page, and we will return production drawings against what you have documented.