A swim spa with a 4500 × 3000 mm shell can sit on a villa terrace or a resort deck and still cause problems at handover if nobody checked the drawings first. The Outdoor Swim Spa WS-PC04CH, with a catalogue shell of 4500 × 3000 × 900 mm, is one of the more compact units in our configurable swim and hydrotherapy range — which is exactly why it gets specified early, often before the landscape architect, the structural engineer and the electrical contractor have compared notes. This article walks through the drawing checks and site conditions we ask project teams to settle before the unit ships, so the shell arrives, lifts into place and connects without a rework order.
Reading WS-PC04CH off the catalogue before coordination starts
Before coordination begins, everyone working on the project should be reading the same figure set. The published catalogue entry for this model records an overall shell of 4500 × 3000 × 900 mm, a single control system, one water pump, one filter pump, 46 jets, one LED light fitting and a total power figure of 2.45 kW. Features shown on the page are water jets, LED lighting and ozone sanitisation.
| Model | WS-PC04CH |
| Catalogue shell size | 4500 × 3000 × 900 mm |
| Control system | 1 set |
| Water pump / filter pump | 1 pc each |
| Jet total | 46 pcs |
| LED lights | 1 pc |
| Total power (catalogue) | 2.45 kW |
| Features shown | Water jets, LED lighting, Ozone |
These are catalogue figures for the base configuration. Heated or upgraded builds change the electrical and insulation picture, so treat the numbers as a starting point for coordination rather than the final construction document.
Two things in that table matter more than they look. First, no swim training system is listed for this model — if the client's brief mentions lap swimming or a current unit, that has to be raised as an option and confirmed, not assumed. Second, the 2.45 kW figure covers the equipment shown on the page. Add a heat pump and the supply requirement moves; the electrical drawing must follow the quotation, not the brochure.
Reading the unit into the architectural drawings
Send the dimensioned outline to the design team as soon as the model is shortlisted, and ask them to mark four things on the plan:
- The shell footprint plus working clearance. The 4500 × 3000 mm outline is the shell, not the access zone. Copy in a maintenance perimeter wide enough for a person to reach the control system and the pump compartment with the lid open.
- Rim level against finished floor levels. The catalogue lists the shell depth as 900 mm; whether the rim sits proud, flush with a deck, or partly recessed changes the substrate build-up, the edge detail and the fall of the surrounding paving.
- Lifting and delivery route. A terrace three storeys up and a ground-floor garden pad need very different rigging notes. Confirm the crane or forklift path, gate widths and any overhead obstruction while the site is still bare.
- Drainage and spill paths. Show where backwash water, overflow and rainwater from the surround go on the civil drawing, not only on the landscape plan.
Structural and substrate checks before the slab is poured
A filled shell of this size puts a sustained load on whatever carries it, and an elevated deck behaves differently from a ground-bearing pad. The structural engineer should see the intended position and mounting method — recessed, semi-recessed or surface-mounted — before sizing beams or the slab. Two details are worth settling in writing at that stage: how the shell is supported around its perimeter once filled, and how the surrounding structure tolerates water exposure at the interface.
Where the unit sits indoors or partially covered, humidity control for the room belongs on the mechanical drawing from the start. It is far cheaper to size ventilation during design than to retrofit it after an unresolved condensation problem.
Power, protection and the equipment room
The electrical contractor needs the confirmed configuration — not the model number alone. From that single line item they can determine supply capacity, circuit protection, cable routes and the location of the isolator. Our checklist for the drawing set:
- Supply capacity and phase arrangement stated on the quotation for the selected build, including any heat pump or extra pump added after the first round of pricing.
- An isolator and control access point outside the splash zone but reachable without stepping onto wet paving.
- A protected cable route from the distribution board to that access point, agreed with the landscape layout so trunking does not cut across a feature planter.
- Provision for the control system where an operator can read it standing in normal clothing — this is a daily-use interface, not a plant-room panel.
Water treatment, drainage and access for servicing
The catalogue shows ozone as the sanitisation feature for this model, with UV sterilisation available among the optional accessories. Whichever route the project takes, the design should show where chemicals or lamps are stored, where a test kit can be used, and how the filter pump is reached without draining the spa. Sand filtration is another option on the accessory list; if it is selected, the plant area grows and needs its own space on the plan along with a waste connection.
Steps are also listed as an option. Their position affects both the entry detail in the paving and the clear deck area in front of them, so fix that choice while the landscape drawing is still open rather than after the pavers are laid.
Fitting the spa into the rest of the outdoor package
A swim spa is rarely ordered on its own. On villa and resort projects it usually arrives alongside poolside seating, daybeds and pergolas, and those items share the same deck, the same drainage falls and sometimes the same lifting operation. Ordering them through one turnkey project solution means a single coordination sheet: one set of levels, one delivery window and one party responsible for the outdoor package as a whole.
If the client wants a different footprint — a longer shell, a custom shape, or an oval spa tucked into a curved terrace — our swimming pool and swim spa range covers several lengths and configurable layouts, including made-to-shape hydrotherapy pools. The same drawing discipline applies: pick the shell, then let the consultants design around a fixed dimension rather than an idea.
What to send us at enquiry stage
Projects that move quickly tend to send the same six items with their first message. Having them ready shortens the quotation round and keeps the specification honest:
- A marked-up site plan or landscape drawing showing the intended position of the spa.
- Whether the unit is recessed, semi-recessed or surface-mounted, and the finished rim level.
- The mounting substrate — slab, deck frame, plinth or podium — with the structural engineer's notes if already available.
- Available supply: phase, capacity, and where the distribution board sits relative to the spa.
- The options list the client wants considered: heating, UV, sand filtration, insulation, steps.
- Site access photographs or a note on floor level, plus the target date for the shell on site.
Delivery, installation and the snag list
Once the configuration is fixed, our logistics and door-to-door delivery service handles freight arrangements, packaging, container loading and the shipping paperwork for the unit and any accompanying outdoor furniture. On arrival, installation and after-sales support cover positioning, connection checks with the site trades, commissioning of pumps, jets, lighting and sanitisation, and an inspection walk with the client's representative. Keep the snag list on the same document the consultants used at design stage — it closes the loop on the clearances and levels they asked for.
Where the swim spa is part of a villa or resort package, our Australian project references include work in Sydney, Melbourne, Perth, Willoughby and North Turramurra. Import terms, duties and any local requirements for electrical connection and barrier or fencing rules are settled with the client's local consultants on a case-by-case basis; we supply the equipment data they need to make those submissions, rather than assuming one site's answers apply to the next.
Common coordination failures, and how to avoid them
- The spa is drawn but not dimensioned. A block on a plan with no rim level or clearance zone gives everyone permission to guess. Issue the outline drawing with levels.
- Electrical sizing follows the brochure. Catalogue power covers the base build; heated configurations need the quoted figures.
- No access left for the filter pump. A spa that cannot be serviced without removing pavers will cost more over its life than the clearance it saved.
- Steps decided after paving. The entry detail and clear deck area depend on the step position.
- Outdoor furniture ordered separately. Two suppliers, two delivery windows and two sets of levels usually means an argument about who owns the interface.
A short coordination checklist by stage
Concept
Agree the model and mounting method. Issue the 4500 × 3000 × 900 mm outline with a maintenance perimeter to architect, landscape architect and structural engineer.
Design development
Fix options: heating, sanitisation, filtration, insulation, steps. Let the electrical drawing follow the confirmed equipment list. Confirm the lifting route.
Documentation
Freeze levels and edge details. Show drainage, waste points and the isolator location on the relevant drawings. Circulate one coordination sheet covering the spa and the surrounding outdoor package.
Construction and handover
Book delivery against a ready substrate. Commission pumps, jets, lighting and sanitisation with site trades present, then run the snag walk with the design team's clearance notes in hand.
Questions we are asked most often
Can WS-PC04CH go on an upper-level terrace? Yes, where the structure is designed for a filled shell and a lifting route exists. Both belong to the project's engineer, and we provide the equipment data they need for that assessment.
Is the 2.45 kW figure the final supply requirement? It is the catalogue total for the configuration shown on the product page. Heating and additional pumps change it, so the electrical design should follow the quotation for the selected build.
Does this model include a swim current? No swim training system is listed for WS-PC04CH. If the brief calls for one, raise it as an option and we will confirm what fits the project.
Can the shape or size change if the terrace does not suit 4500 mm? Yes. Other lengths are catalogued, and made-to-shape hydrotherapy pools cover square, round, oval and curved layouts.
Next step
If WS-PC04CH is on your shortlist, send the marked-up site plan, the mounting method and the options you want priced, and we will return a configuration sheet your consultants can build drawings from. For whole-site packages — swim spa, poolside furniture, pergolas, interior fit-out and finishes under one coordination process — talk to us through the contact page about your villa, hotel or resort project.