Cabinetry is one of the longest-lead, highest-touch items on a hospitality FF&E schedule. It has to survive hundreds of cycles a day, match a design intent agreed months earlier, and arrive in the sequence the site team needs it. This guide walks through how we at SANTERSON take Santerson Shaker Style PVC Cabinets from a drawing package to an installed run of units on a hotel, serviced apartment or resort project — and what your team needs to have ready at each stage.
Why the shaker profile keeps winning in hospitality
A shaker door is a flat centre panel inside a simple square frame. There is no moulding to chip, no profile for grease to collect in, and no ornament that dates the room. That restraint is exactly why it works across property types: it reads as traditional in a heritage boutique conversion, and as clean and quiet in a contemporary aparthotel with stone benchtops and integrated appliances.
For operators, the practical argument is replacement. Guest suites and staff kitchens get refitted on different cycles, and a shaker front can be re-ordered to match an existing run years later without the whole elevation looking like a different building. When we specify these units for a project, the door profile, panel-to-frame proportion and finish are recorded against the job so a later phase can be reproduced rather than approximated.
Reading the product record correctly
One thing to settle before you issue an enquiry: our catalogue page for this line is titled Santerson Shaker Style PVC Cabinets, while the description text and URL reference a plywood construction. Treat both names as pointing at one shaker door family with different substrate and surface options behind it, not as two separate products. The material you actually receive depends on the specification you confirm for the order.
The catalogue entry states project-specific dimensions and finish options, made-to-measure sizing and a layout tailored to the project, and it closes with an instruction we take seriously: confirm dimensions and selected specifications for each project. There is no standard size on this page, and we do not publish one here, because a run of guest-kitchen cabinets in a small suite is not a catalogue item.
What to fix before you request a quotation
The projects that move fastest are the ones where the buyer arrives with a defined set of inputs. For a cabinet package we need:
- Room dimensions and elevations, including floor-to-ceiling heights, column positions, skirting depths and any service risers that cut into a carcass.
- Appliance schedule with model numbers — oven, cooktop, dishwasher, refrigerator, microwave. Integrated appliances dictate carcass depth and venting before the door style matters.
- Benchtop material and thickness, because it sets the working height, the splashback detail and whether the scribe is taken at the wall or the top.
- Door and carcass finish, with a sample reference rather than a colour name. A "grey" specified on paper can read as three different greys once installed.
- Hardware expectation — soft-close throughout, drawer runners rated for the intended load, handle or handleless profile edge.
- Room-by-room quantities and the phasing plan, so production is released in the order the site needs it.
If a drawing package does not exist yet, our interior design service covers space layout planning, concept design and 3D visual renderings, then production coordination and on-site guidance. In practice that means we can work from a floor plan and a mood board instead of waiting for tender-ready joinery drawings.
Sampling and finish approval
For any multi-room run, approve a physical sample before the production order is released. We send door samples so the client can see the surface under the actual site lighting — a wrapped moulding in a north-facing suite and the same sample under warm LED in a corridor read very differently on paper.
For hospitality specifically, we ask what cleaning regime the operator intends to use. A guest kitchen is wiped down daily with whatever the housekeeping contractor keeps on the trolley, and that is worth knowing at specification stage rather than after handover. Tell us the expected cleaning products and traffic level and we will confirm which surface option in this family suits the duty.
Custom and OEM scope
Where a project needs something outside the published range, our custom and OEM service covers bespoke finishes and textures, custom furniture design and prototyping, and 3D modelling before production. Material options discussed on that page include wood, metals, engineered stone and laminates, which is useful when a cabinet run has to be coordinated with wall panelling, wardrobe fronts and doors elsewhere in the same building.
Minimum order quantities are handled flexibly rather than on a fixed published number, so tell us the room count. A single show suite and a phased rollout across many keys are quoted and scheduled differently, and both are within scope.
Coordinating cabinets with the rest of the fit-out
Cabinetry rarely fails on its own; it fails where it meets something else. The junctions to watch are benchtop and splashback, tiling set-out against a run end, appliance ventilation, skirting returns, and lighting inside glass-front units. Because we supply across kitchen cabinets and hotel appliances as well as wall panels, flooring, doors, wardrobes and lighting, these interfaces are settled in one factory's drawing set rather than negotiated between several suppliers.
That is the practical case for a single hospitality project furnishing package. One coordination cycle, one packing schedule, one set of junction details.
Production, packing and delivery sequence
Once the shop drawings are signed off, production is released by room group rather than as a single bulk order. Each unit is packed so that a suite's components travel together — a documented packing list per room group lets the site team confirm receipt against the room schedule instead of sorting an unlabelled container.
Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork including commercial invoices, packing lists and certificates of origin, container loading plans and shipment tracking. Freight mode is a cost decision you make per consignment; we will price sea against air for the same package so the trade-off between transit time and landed cost is explicit.
Import terms, duties and Incoterms are confirmed case by case with your customs broker. We do not publish a standard landed-cost figure or a guaranteed transit time, because both move with volume, port and consignment.
Site readiness and installation
Before the cabinets land, the site needs: floor screed cured and levels recorded, first-fix services and appliance positions set out, wall finishes complete behind the run, and clear access for delivery with a lift or hoist rated for the longest component. We will issue a site-readiness checklist against your drawings so nothing is discovered on installation day.
Our installation and after-sales support covers on-site installation, inspection with a snag list, spare parts and replacement, and ongoing maintenance. For phased hospitality work, we install a reference suite first, walk the client and the operator through it, and use that sign-off as the benchmark for the remaining rooms.
A practical procurement timeline
| Stage | What you supply | What we return |
|---|---|---|
| Brief and enquiry | Floor plans, room schedule, target budget band | Specification options for the shaker family, indicative package scope |
| Design and detailing | Appliance list, benchtop choice, finish direction | Layouts, 3D visuals, door samples for approval |
| Quotation and confirmation | Signed sample reference, quantities, phasing plan | Itemised quotation, shop drawings for signature, production schedule by room group |
| Production and QC | Any late changes, in writing, before release | Completed units, packing list per room group, freight options priced |
| Delivery and installation | Site readiness, access, receiving contact | Delivered package, installation, snag list closed out |
Dates are set per project after drawings are signed. We do not quote a lead time in an article, because the honest answer depends on room count, finish selection and freight mode.
Questions buyers ask us most
Is this line suitable for wet areas?
Tell us the room. A guest-suite kitchenette, a staff pantry and a poolside bar each put different moisture and wear loads on a surface, and the substrate and edge treatment should be chosen against that duty rather than assumed from a product name.
Can we order replacement doors years later?
Yes, provided the door profile and finish reference were recorded at the original order. That is why we log the approved sample against the project file and recommend you keep the sample reference in your asset register.
Can you work from a drawing package produced elsewhere?
We can quote from any measured drawing package, but we will re-detail it to our own construction and hardware rather than reproduce another manufacturer's build. Send the drawings and we will come back with the equivalent detail and any changes needed.
Getting started
Send us the room schedule, elevations and appliance list for the property, along with the phasing plan, and we will return specification options for Santerson Shaker Style PVC Cabinets with door samples and an itemised quotation. If you are still shaping the design, start with a layout and finish direction and we will develop the joinery detail from there.