A request for quote that only says "slim frame French doors, 2 off" will come back with a price you cannot compare. The opening is where most door enquiries lose time: the quotation you receive reflects exactly what you wrote down, and anything missing becomes an assumption filled in by someone else. Below is the information list we use to quote Santerson Modern Slim Frame French Doors and the rest of our French doors collection, so that the figure you get back is the figure you can actually build to.
Start with the opening, not the product name
Send the rough opening dimensions as a drawing or a marked-up plan, not a single tape measurement. For each door position we need the width and height of the structural opening, the finished floor level relative to the sill or threshold, the wall build-up (masonry, stud or steel frame) and the wall thickness, because the reveal depth determines the frame profile and whether an extension jamb is required. Note the opening tolerance range as well: a site that can adjust the opening by 10 mm quotes differently from one that is fixed at exactly what is drawn.
State the quantity per position and whether the doors are identical or mirrored. A pair of slim frame French doors handed left and right needs different framing detail, so we would rather see it on the drawing than discover it after production has started.
Say what the door has to do
Tell us where the door sits and how it will be used. An interior pair separating a living room from a study, a pair onto a covered loggia, and a pair between a dining room and a terrace all need different leaf construction, glazing and hardware. If the doors are expected to stay open most of the day, hinge type and the floor guide matter more than appearance. If privacy or acoustics matter, say so in the RFQ rather than after the first sample.
For residential projects we quote made-to-measure sizing for every position, with material and finish options selected per project. If your design intent already fixes the sightline width of the frame or the glazing bar layout, attach the elevation from your drawing set. Where a scheme calls for a different head profile in the same property, our Santerson Arched French Doors and Classic French Double Doors are the two variations we most often quote alongside the slim frame version, so it is worth naming the collection you are working from.
Finish, glass and hardware: name them or ask for options
Specify the frame finish by reference where possible (a powder-coat colour code, anodised range or wood veneer species) rather than a word like "black". Clear, low-iron, tinted or patterned glass changes both price and lead time, so give the glazing type or ask us to propose two options against your budget. List hardware as lock type, handle style, and whether you want a flush bolt arrangement on the inactive leaf. If the joinery is being installed by others, say who supplies the ironmongery.
Where doors are part of a wider fit-out, list them in the same schedule as the other openings. Buyers who send us their interior fixtures schedule (wardrobes, cabinetry, wall panelling and doors together) usually get fewer variations later, because frame details and finishes are coordinated once instead of across three separate orders.
Delivery terms and what you need on site
Include the delivery address, the Incoterms you want quoted, and the date the doors must be on site. We arrange freight by sea, air or rail with customs paperwork and door-to-door delivery, so a quotation can be issued either ex-works or delivered; if you tell us which, the comparison between suppliers stays honest. Add whether the site has lift access, and whether unloading labour is available.
Tell us who installs. If our team provides on-site installation guidance, we will flag the setting-out sequence in advance; if your own contractor installs, they should confirm the frame tolerance they are comfortable working to before the doors are manufactured.
Questions worth putting in the RFQ itself
- What is included in the quoted price: frame, leaves, glazing, hardware, sealant, fixing pack and threshold?
- Which drawings require your sign-off before production starts, and how long does that approval take?
- What tolerance range will you accept on site for each opening?
- How are replacement leaves or a spare handle set supplied if something is damaged after handover?
- What happens to the price if one opening changes by more than the agreed tolerance after order?
A short checklist before you send
Openings with tolerances, finished floor levels, wall build-up, quantity and handing, location and duty, frame finish reference, glazing type, hardware schedule, installer, delivery address and Incoterms, required site date. Send those with your drawing references and we can price the doors against the specification you intend to install, and flag anything that will cost more before it reaches production.
Send your door schedule, openings drawing and required site date through our contact channels, and we will return a quotation against that specification together with the drawings needed for your sign-off.