A wardrobe line looks simple on a schedule: white gloss doors, full height, made to measure. The specification behind it is not. Finish type, substrate, door system, internal layout, tolerance allowance and the handover point between trade packages all sit in different documents, and each one changes price, lead time and site programme. For procurement teams working on villas, serviced apartments and hospitality rooms, the documentation pack around White Acrylic Wardrobes is what protects the order after the design intent has been approved.
What an acrylic wardrobe actually consists of
In our catalogue, this product sits in the built-in furniture range under the Acrylic Wardrobes collection. The specification on the product page is deliberately short: made-to-measure sizing, material and finish options, and a layout tailored to the project, with a standing instruction to confirm dimensions and selected specifications for each project. That is the honest starting point for a purchase order — the item is defined per job, not from a fixed stock list.
Practically, an acrylic-fronted wardrobe is assembled from decisions you should be able to see written down somewhere: the front finish (high-gloss or matte acrylic), the carcass and drawer material, the door opening system — hinged, sliding or open — the internal configuration of hanging rails, shelves and drawers, plus edge treatment, hardware brand and any integrated lighting. Finish families in the same collection, such as Matte Acrylic Wardrobes and Two Tone Acrylic Wardrobes, are specified the same way, so one documentation template covers all of them.
The document set to raise before you place the order
| Document | What it must record | Why procurement needs it |
|---|---|---|
| Approval drawing pack | Elevations per room, overall and internal dimensions, door swing or track direction, skirting and cornice treatment, floor level notes | Fixes what the factory builds and what the site accepts at handover |
| Finish schedule | Front finish type and colour reference, gloss or matte, carcass colour, edge banding, hardware finish | Prevents a visually similar but non-matching panel arriving on site |
| Internal layout schedule | Rail heights, shelf counts and depths, drawer stack, accessory positions, lighting points | Drives cost per unit and is the cheapest item to change before production |
| Site tolerance record | Floor, wall and ceiling levels measured at site, out-of-plumb allowance, recess depths | Made-to-measure units are cut against these numbers, not against drawings |
| Scope-split sheet | Who supplies and installs: wardrobe contractor, carpentry, electrician, flooring, plaster | Removes the gap where electrical points and scribes get missed |
| Submittal log with dates | Drawing issue, client/consultant comments, re-issue, sign-off, production release | Becomes the reference if a late change is claimed as variation later |
Details that cause the most rework when they are undocumented
- Finish reference without a physical sample. A colour name on a schedule is not a finish. Sign off a produced sample panel and keep it on site; gloss acrylic in particular reads differently under warm and cool lighting.
- Door system decided late. Sliding, hinged and open configurations take different clearances and different track or hinge hardware. Changing the system after the carcass is released changes the order, not just a line item.
- Flooring level assumed. Carpet, tile and engineered timber build up to different finished levels. Record the finished floor level before final dimensions are taken.
- Lighting left to site. Interior lighting needs a driver location, a switched circuit and an access route decided on the drawings, otherwise it becomes a surface-mounted compromise.
- Tolerances attributed to the supplier. If the site record shows levels outside the agreed range, that is a trades issue with a documented answer instead of a dispute.
How the specification travels through a made-to-measure order
Our interior design and project service runs from space layout planning and concept through furniture layouts, 3D visual renderings and design coordination — drawings, production coordination and on-site guidance. The cooperation steps are stated as brief and design proposal, quotation and detail confirmation, then production, shipment and follow-up. For a wardrobe package this means the document set above is not paperwork around the order; it is the input that lets quotation and detail confirmation close cleanly before production starts.
The same pack supports the rest of the fit-out. Wardrobes share wall, floor and ceiling finishes with building and construction materials, and they sit in the same rooms as vanities, mirror cabinets and lighting from the interior fixtures range. One schedule naming room numbers, finishes and levels across those categories is easier to coordinate than three separate ones.
Where a project needs the wardrobe front to match joinery elsewhere in the building, custom and OEM work covers bespoke material finishes and textures alongside prototyping; confirm available options and minimum order quantities for your particular job rather than assuming them. Door openings that must align with a wardrobe run are catalogued separately as interior doors, so record the interface between the two in the same drawings.
Delivery, installation and handover records
Logistics documentation should be filed with the specification, not kept by the freight agent. For an imported wardrobe package expect commercial invoice, packing list, certificate of origin and the container loading plan; our logistics service covers sea, air and rail forwarding, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Import terms, duties and transit arrangements are confirmed case by case for each destination.
At handover, keep three records: the signed approval drawing that was used for production, the packing list matched to room numbers on site, and a snag list closed out against it. Installation and after-sales support covers on-site installation, inspection and snags, warranty coverage, spare parts or replacement and ongoing maintenance — but warranty terms and response commitments should be read in your own contract documents, not inferred from marketing copy.
A short pre-order checklist
- Approval drawings signed, dated and revision-controlled
- Physical finish sample approved and retained on site
- Finished floor levels and wall/ceiling levels recorded
- Door system and opening direction fixed for every unit
- Internal layout schedule priced and confirmed
- Electrical points, drivers and access shown on drawings
- Scope split between trades agreed in writing
- Packing list keyed to room numbers before despatch
If those eight lines are complete, an acrylic wardrobe order is defined by documents rather than by recollection — and any later change can be priced against a known baseline.
Questions procurement teams ask us
Can we order a standard size instead of made to measure?
This product is specified per project, with sizing, finish and layout confirmed for each space. Tell us the room dimensions and target layout and we will quote against them.
Which document do you need from us to start?
Room-by-room elevations with levels, plus your finish preference. From there drawings are developed for your sign-off before production is released.
We want a matte front instead of gloss — same documentation?
Yes. The schedule, drawings and tolerance record are identical in structure; only the finish reference changes.