A floating vanity rarely decides a bathroom budget on its own. What moves the number is everything around it: how many bathrooms are involved, which other fixtures share the same wall and plumbing runs, and whether one supplier can produce the joinery, ceramics and finishes to the same detail. When a villa or apartment handover includes cabinetry, sanitaryware, lighting and surfaces in one package, the vanity becomes a scheduling item as much as a purchasing one. This guide walks through how buyers and project teams scope and budget the Santerson Floating Vanity alongside the rest of a multi-product order.

Why floating vanities are easy to mis-scope

A wall-hung vanity removes the floor contact that a freestanding unit relies on, so the load path runs into the wall behind it. That single change pulls in decisions that are often left out of an early estimate: what the substrate is, where the waste and supply lines sit, how much clear wall length the bracket system needs, and how the countertop edge meets a tiled or panelled finish. Specify the vanity after those conditions are fixed and you usually pay twice — once for a revised drawing, once for a site variation.

The Santerson Floating Vanity is specified per project rather than picked from a fixed size list. The product page records made-to-measure sizing, material and finish options, and a layout tailored to each space. That flexibility is the point of buying it on a project basis: drawer heights, run length and finish can follow the room instead of the other way round. It also means the quotation depends entirely on what you hand over in the enquiry.

Set the scope line before asking for prices

Write one line that states where your responsibility ends and the trades begin. In a multi-product package this is the cheapest protection you can buy, because disputes over cost almost always start at an unassigned boundary.

  • Included in the vanity supply: the carcass and front configuration, chosen finish, dimensions as drawn, and the storage layout agreed on the shop drawing.
  • Agreed separately: countertop and basin pairing, tapware and waste set, mirror and vanity lighting, wall reinforcement, tiling and any electrical work.
  • Confirmed on site by others: setting-out dimensions, wall preparation, final connection to drainage, and handover inspection.

Once that line exists, comparing two quotations becomes a fair exercise, because you are comparing the same scope rather than two different assumptions about it.

Group the vanities by bathroom type, not by room number

In multi-unit work — several apartments, a villa with guest and ensuite bathrooms, or a serviced-apartment block — the practical unit of budgeting is the bathroom type. Define two or three typical layouts and repeat them, changing only width and finish where the design genuinely calls for it.

Bathroom typeTypical vanity approachWhat to lock down early
Guest / powder roomShorter floating run, single basinClear wall length, mirror position, waste outlet height
Family bathroomLonger floating run with drawers, single or paired basinDrawer heights against the trap, storage mix, lighting circuit
Ensuite / principal bathroomDouble vanity or floating run with integrated topTwo waste runs, worktop spans, tap spacing, splash finish

Where a room needs more counter than a single unit can carry, the alternative in the same collection is worth pricing side by side: the Santerson Integrated Countertop Vanity carries the top as part of the unit, while a single vanity suits the tightest wall. Price all three against one room type and the decision usually argues for itself.

Build the budget in layers

A usable estimate is assembled from four separate layers. Keeping them apart means a change to finish or size never forces you to rebuild the whole spreadsheet.

  1. Unit cost per bathroom type. Quantity of each type multiplied by its agreed configuration. Made-to-measure sizing sits here, so state the dimension range you are pricing against rather than an exact figure that may move on site.
  2. Surfaces and ceramics. Countertop material, basin type, taps, wastes and traps. These are usually quoted apart from the joinery and are where a low unit price can quietly rise.
  3. Related fit-out items on the same wall. Mirrors, mirror cabinets, lighting, wall panelling and tiling. Coordinating them with the vanity avoids two suppliers cutting into the same finish.
  4. Delivery and site handling. Freight to site, packaging, container loading sequence and storage. Multi-product orders arrive as one consignment only if the loading order is planned; otherwise the joinery lands before the wall it attaches to is ready.

Hold a small contingency against the second layer rather than the first. Finish and stone choices are what clients change late; carcass dimensions, once drawn and signed, rarely do.

Use one specification sheet for every product in the package

The most common cause of overrun on a multi-product order is not an expensive item but a mismatch between items: a vanity depth that clashes with a door swing, a lighting position drawn before the mirror size was fixed, a finish sample approved for doors but never carried across to the wardrobe fronts. A single specification sheet, listing each room once with its products and finishes, prevents this far more reliably than separate supplier lists.

When cabinetry, ceramics, lighting and surfaces come from one furniture and building materials supplier, the coordination cost drops with them. Santerson describes a turnkey route covering design consultation and space planning, material selection and product specification, manufacturing and quality control, project management and site coordination, then installation and handover — with custom and OEM work, door-to-door logistics, and installation support listed as services. For buyers assembling a whole apartment or villa package, that structure means one point of accountability across the items that have to fit together.

What to send with your enquiry

A quotation you can act on needs the following attached. Missing any one of them tends to produce a price that has to be reopened later.

  • Room-by-room schedule: quantity of each bathroom type, with clear wall length and height available for the floating unit.
  • Existing or proposed plumbing setting-out, including waste outlet position and supply locations.
  • Wall build-up and the reinforcement or blocking required to carry a wall-hung unit.
  • Countertop and basin selection, plus tapware and waste if you want them quoted together.
  • Finish reference for fronts and carcass, matched to the finishes used elsewhere in the project.
  • Storage layout: drawer stack, open shelf, or a mix — stated per bathroom type.
  • Delivery address, access conditions and required arrival sequence relative to other trades.

Ask for a shop drawing back before confirming the order. A signed drawing of the floating vanity, with dimensions, finish reference, drawer layout and basin cut-outs, is what protects both sides when the unit reaches site.

Checkpoints before you sign

  • Every bathroom type has a named configuration and quantity — no "as shown" placeholders.
  • Countertop, basin, taps and wastes are either inside the quotation or written out of it in one place.
  • Wall reinforcement is assigned to a trade, not assumed.
  • Lighting and mirror positions are drawn against the final vanity width.
  • Arrival date for the joinery sits after wall set-out and before finishes are closed up.
  • Dimensions, basin and countertop fit, materials, hardware and installation requirements are confirmed against the configuration you selected, since each unit is made to the project rather than a standard size.

Turning the scope into an enquiry

A floating vanity priced in isolation looks cheap and behaves expensively if the surrounding products were never scoped with it. Set the scope line, group your bathrooms into two or three repeatable types, budget in layers, and send one specification sheet that covers every product on the same wall. That is how a multi-product order stays inside the number you first wrote down.

To price a floating vanity within a wider package — cabinetry, sanitaryware, lighting and interior finishes for a villa, apartment or hospitality project — send the room schedule and setting-out drawings to SANTERSON and request a shop drawing before you confirm.