A floating TV unit looks simple on a drawing: a horizontal cabinet, a recess for the screen, some open niches. In production it touches wall structure, electrical routes, cable management, storage layout and finish matching with the rest of the joinery. That is exactly why approval should not happen at the shop-drawing stage without a short list of confirmations. Below are the points we ask project teams to close out before signing off floating TV units for villas, residences and hospitality rooms.
1. The wall behind the unit, not just the unit
Wall-mounted cabinetry transfers screen weight and cabinet load into the substrate, so the wall build matters as much as the carcass. Before approval, confirm:
- the wall construction on site — masonry, stud partition, timber frame or an existing finished surface;
- the total mass to be carried, including the display, not only the cabinet;
- whether a reinforcing backing or sub-frame is required, and who supplies and installs it;
- the clear finished level of the floor and ceiling, because a wall-to-wall composition is dimensioned against those levels.
Where the design extends to the ceiling — for example a full height media wall rather than a floating unit — confirm early whether the composition is intended to be continuous with the wall panelling, and how skirtings, architraves and reveals are resolved.
2. Screen size, mounting method and viewing height
The niche is sized from the display, so the display selection should be locked before the carcass is. Confirm the screen size and model or at least its fixing pattern and outer dimensions, whether a fixed bracket, tilt bracket or pull-out arm is used, and the required clearance behind the unit for that bracket. Then set the finished centre height of the screen against the seating layout — sofa depth and eye height change the comfortable viewing line more than most clients expect.
Also confirm ventilation to the niche. Displays and sources generate heat; a fully enclosed recess with no air path causes overheating and makes future servicing difficult.
3. Power, devices and cable routes
This is the item most often left to site. Before approval, agree:
- how many socket outlets sit inside the unit, and their position relative to the shelf line;
- where HDMI, network and speaker cables land, including any conduit or trunking behind the panel;
- which devices live inside the cabinet and which are remote, since IR and RF performance through closed doors varies;
- whether integrated lighting is part of the design — for a media unit with integrated LED lighting, confirm the driver location, switching arrangement and accessible maintenance point.
Electrical work is carried out by others on site. Our role is to give the electrical contractor accurate setting-out dimensions in good time; that drawing should be issued against the same revision as the joinery drawings.
4. Storage layout and daily use
Floating units fail in use when the storage is decorative rather than practical. Confirm the split between closed cabinets, open display niches and drawer storage; door type and swing clearance; shelf spans against what will actually be loaded on them; and whether tall items such as games consoles need a taller compartment. Open shelving shows dust quickly, so clients who want a clean look usually need more closed doors than they first ask for.
5. Materials, finish and matching to the rest of the joinery
Where the unit sits within a wider interior scheme, confirm that the carcass, doors, veneer or lacquer colour and edge treatment match the other cabinetry on the same project — including grain direction on wood veneer, which reads as a mismatch when it runs in opposite directions across adjacent units. Sample approval should cover both the surface material and the edge profile, since a standard edge on an otherwise seamless design changes the whole appearance.
Where the unit is part of a larger wall composition, confirm how it meets wall panel systems and any concealed doors in the same wall, so reveals and shadow gaps stay consistent.
6. Delivery, access and installation sequence
Confirm site access for the packages — lift dimensions, stair widths, corridor turns — and the installation window relative to wall decoration, flooring and lighting. A floating unit installed before the final wall finish leaves an untidy reveal; installed after, it risks damaging fresh paint. Agree who fixes to the wall, who connects power, and how snags are recorded at handover.
As a one-stop furniture and building materials supplier, we build these units made to measure — size, layout, material and finish specified for each project — and coordinate them with the surrounding wall systems, doors and cabinetry rather than treating them as a separate purchase. If you send the room layout and the display selection early, we can return a setting-out drawing your electrical contractor can work from.
Send your drawings and screen specification to our project team and we will confirm dimensions, fixing method and finish options for review before production.