A matte acrylic wardrobe is one of the easier items to specify badly. The finish looks simple — a flat, low-sheen door in a solid colour — so buyers often send nothing more than a photo and a room name, then receive a quotation they cannot compare with anyone else's. Before you contact a supplier about matte acrylic wardrobes, gather the information below. It is the difference between a quotation you can evaluate and one you simply have to trust.

1. The wall-to-wall dimensions, taken at three heights

Our matte acrylic wardrobes are made to measure rather than offered in fixed sizes, so the first thing a supplier needs is the actual opening, not the nominal room size. Measure the width at the top, middle and bottom of the wall, and the height at the left, centre and right. Older and renovated properties rarely have walls that are square, and a few millimetres of variation decides whether the installer scribes a panel, packs the carcass or rebuilds part of the fit-out.

Note these as well:

  • Skirting boards, architraves, cornices and any protruding switch plates that the wardrobe must clear
  • Sockets, light switches, radiators and thermostat controls that fall inside the run
  • Beam, column or uneven ceiling lines, with their exact position along the wall
  • The finished floor level — state whether flooring is already laid or still to come, and how thick it will be

Send a simple sketch with the numbers on it. A hand drawing with dimensions beats a beautiful render with none.

2. How the wardrobe will actually be used

Internal layout is where most specifications go wrong, because buyers describe the outside and leave the inside to chance. Tell the supplier how the space is used: hanging-heavy wardrobes for coats and shirts need long rails; a walk-in needs short rails doubled up; folded storage needs adjustable shelving; bedding and cases need a top zone you can reach.

Decide before you enquire:

  • Hanging lengths — single long rail, double short rails, or both
  • Drawer count and depth, including whether you want soft-close runners
  • Shelving: fixed, adjustable, or a dedicated shelf for boxes and cases
  • Extras such as trouser slides, tie racks, valet rods, shoe shelving, lighting inside the carcass, or an integrated vanity
  • Who uses it — a shared bedroom needs two zones; a guest suite does not

If you are specifying for several bedrooms in one project, say how many of each layout you need. Repeat layouts are where made-to-measure production becomes efficient, and grouping identical rooms usually makes the package easier to price.

3. Door type, because it changes both clearance and price

The same matte acrylic finish is available across different door systems, and each one has different spatial demands. Hinged doors need a clear swing arc in front of the wardrobe, which matters in narrow corridors and box rooms. Sliding doors save that arc, so they suit bedrooms where the bed sits close to the storage wall — see matte sliding door wardrobes for that configuration. Walk-in and open layouts skip doors entirely and shift the cost into the carcass and internal fittings.

Measure the walkway in front of the wardrobe before choosing. Give the supplier that number along with the wall dimensions, and ask which door type works with the clearance you have rather than deciding first and hoping.

4. The finish you want — stated by name and by sample

"Matte" covers a wide range of surfaces, and a photograph will not tell you which one you are buying. Decide the tone family first — warm neutral, cool grey, deep charcoal — then confirm the exact surface with a physical sample before production.

Two practical points:

  • Matte and gloss read very differently under the same lighting. Ask for samples and view them in the actual room, at night as well as by day.
  • If part of the project already has matte-finish joinery, send the reference — a sample offcut, the existing colour code, or a photograph of the installed cabinetry — so the tones can be matched rather than approximated.

If you want contrast rather than a single flat field, two tone acrylic wardrobes let you pair a matte body with a different door tone. Confirm which surfaces carry which finish, and how the edges are handled.

5. What is fixed in the room already

A built-in wardrobe has to resolve every other finish it meets. Tell the supplier what is already decided or installed: floor type and thickness, wall finish, ceiling height and type, adjacent cabinetry, and whether an adjoining kitchen or bathroom run uses the same supplier. Where several fit-out items come from one source, panel edges and reveal lines can be coordinated instead of left to whoever installs last.

If you are also specifying matte acrylic cabinets for the kitchen in the same project, mention it early. Matching a wardrobe door to a kitchen door is a material and batch decision, not something to solve at handover.

6. Your delivery location, quantities and target programme

For an overseas order the commercial details matter as much as the drawings. Have ready:

  • The delivery address and who receives goods on site
  • How many wardrobes or rooms in the package, and whether they are identical
  • Your required on-site date, working backwards from it to when the drawings need sign-off
  • Whether you want door-to-door delivery to the site or collection at a port
  • Who handles installation — your own crew, your builder, or the supplier's on-site support

Being explicit about who installs avoids the most common dispute on an imported fit-out: the goods arrive complete, and nobody on site was briefed on the sequence.

7. What to ask the supplier in return

A capable manufacturer will answer these quickly, and their answers tell you more about them than any brochure:

  • What is included in the quoted price — carcass, doors, internal fittings, delivery, installation?
  • Which board material and which surface construction sit behind the finish sample?
  • How are edges, handles or handleless grooves detailed on a matte door?
  • What does the production drawing show before you approve it, and who signs it off?
  • How are spare panels and replacement parts handled after handover?

Treat the first quotation as incomplete until those answers arrive. Two quotations for the "same" wardrobe often differ because one includes internal fittings, delivery and installation and the other does not.

Putting it together

A useful first enquiry is short: a dimensioned sketch, a note on how each wardrobe is used, the door type you are considering with the clearance in front of it, the finish family you want, what is already fixed in the room, and your quantity, location and required date. With that, custom minimalist bedroom wardrobe layouts can be drawn, priced and compared properly.

SANTERSON manufactures built-in furniture to project-specific dimensions, finishes and internal layouts, with production coordinated alongside the rest of a villa or apartment fit-out. Send us your dimensions and room details and we will come back with drawings and a specification you can check line by line.