A floating TV unit looks simple on a mood board and complicated on site. The cabinet appears to hover, the screen disappears into a wall panel, and the cables are nowhere to be seen. Then the quotation arrives, and you discover that two proposals that look identical on the drawing sheet carry different engineering, different joinery detail and very different risk. This guide walks through how to read a manufacturer’s proposal for floating TV units in the TV Cabinets / Media Units range, so you can compare like with like before you place an order.

Why floating TV units reward a careful read of the proposal

A freestanding cabinet is forgiving. It sits on the floor, and if the wall behind it is uneven, nobody notices. A wall-hung media unit does the opposite: every dimension, fixing point and service route has to be settled before the first panel leaves the factory. That is exactly why made-to-measure pieces in this category are quoted per project rather than from a price list. The Santerson Floating TV Units page lists made-to-measure sizing, material and finish options and a layout tailored to the project — which means the proposal itself is where the product is actually defined.

Treat the quotation as a technical document, not a price. The line items tell you what has been thought through, and the gaps tell you what has not.

Check one: does the proposal reflect your actual wall?

The most expensive mistakes in this category come from a proposal written against an assumed condition rather than a surveyed one. Before you compare prices, confirm that the document answers these questions:

  • Are the dimensions given as overall external sizes, recess sizes and clear opening sizes, or only as one width by one height?
  • Is the wall build-up stated — masonry, stud and plasterboard, timber battening or an existing joinery face? A floating unit needs a substrate it can be anchored to.
  • Is there a note on out-of-level or out-of-plumb walls, and how the carcass is scribed or packed on site?
  • Does the proposal show where the unit terminates against skirting, cornice, architrave or an adjacent cabinet run?

If the drawing shows a neat rectangle in empty space and nothing else, ask for a set-out drawing with levels and dimensions tied to fixed points in the room. That single revision usually prevents a site visit later.

Check two: construction and fixing method

The visible finish is only half of what you are buying. Ask the manufacturer to state, in writing, how the unit is built and hung:

ItemWhat a complete proposal states
CarcassPanel material and thickness, edge treatment, whether shelves are fixed, adjustable or removable
SuspensionFrench-cleat style rail, concealed bracket system or a steel sub-frame; load rating and fixing centres
SubstrateWhether timber nogging or a batten frame is required in the wall, and who supplies it
FinishLacquer, laminate, veneer or melamine face; sheen level; edge banding or mitred returns on visible ends
HardwareHinge and runner brand or series, soft-close provision, drawer load rating
AssemblyFactory-assembled carcasses or flat-pack panels; whether the site crew assembles or the factory does

Where a supplier offers custom joinery, this is also the point at which you should confirm that material and finish choices are actually available for your project rather than assumed from a catalogue. A custom furniture manufacturer working to your drawings will normally list the substrate, the face material and the edge detail separately; a vague “as per image” line item leaves all three open.

Check three: screen, cables and services

A media wall fails in daily use far more often because of services than because of joinery. Read the proposal for the following, and add them to your own scope if they are missing:

  • An open cable route behind the screen position, sized for the cables you actually intend to run, with a pull-through access point.
  • A stated position for the power and data outlet, in relation to the centreline of the unit and to finished floor level.
  • Ventilation provision if equipment is enclosed. Closed cabinets that house consoles or set-top boxes need air paths, and glass fronts change how much heat builds up inside.
  • Whether the screen is fixed to the wall, to a bracket on the carcass, or to a dedicated steel plate — and who supplies that plate.
  • Provision for a soundbar or speakers, including whether fabric or perforated panels are quoted where speakers sit behind them.

Where lighting is part of the design, ask how it is powered and controlled. Integrated cabinet lighting needs a driver location you can reach after handover, not one sealed behind a fixed panel.

Check four: what the price does and does not include

Comparing two quotations only works once their boundaries match. Build a simple table for each proposal:

Included?Confirm in writing before award
Site measureWho measures, when, and whether a second visit is chargeable if the wall changes
Drawings and approvalNumber of revision rounds included; what happens to price after a change
PackagingCrated or cartonned, edge protection on long panels, marking of panel references
Freight and deliveryPort or door, Incoterms, whether the last leg to apartment level is covered. Door-to-door arrangements are described in the logistics and delivery service
InstallationWho fixes, who supplies anchors and packing, who makes good around the unit. See the installation and after-sales support page for the scope offered
Snags and warrantyThe snag period, what is covered, and how replacements are shipped

Two proposals at similar prices often differ by one of these lines. The cheaper quotation is rarely cheaper once you add a local carpenter to hang a carcass that the factory did not supply with a fixing system.

Check five: consistency across the whole joinery package

Floating TV units rarely stand alone. They sit in the same living room as tall cabinets, open shelving, a sideboard or a full-height wall system, and those pieces are frequently quoted by different suppliers with different materials and slightly different colour references. Where the media unit is part of a larger built-in package, ask one supplier to price the whole run and show the finish samples together.

Related configurations in the same collection make that comparison easier: Santerson Freestanding TV Cabinets if you want the unit on the floor, and Floating TV Units in the Media & TV Walls collection where the unit forms part of a wall system. The same carcass detail, finish reference and fixing method should appear across all of them.

Red flags worth pausing on

  • A price given before dimensions and wall condition are confirmed.
  • Suspension method omitted, or described only as “wall mounted”.
  • Finish named by colour alone, with no material or sheen stated.
  • Long panels quoted without a note on how they reach the site — lift, stair, or crated length.
  • No drawing to sign off, on the basis that details will be settled during production.

None of these end a conversation. They are the points to raise now rather than after the panels have been cut.

A short pre-order checklist

  • Signed set-out drawing with levels, centreline and clear openings.
  • Written confirmation of wall substrate and any timber nogging or sub-frame required.
  • Carcass construction, suspension system and load rating stated in the quotation.
  • Face material, edge detail and finish reference confirmed from a physical sample.
  • Cable routes, outlet positions, ventilation and screen fixing agreed on the drawing.
  • Delivery terms, installation responsibility and snag process defined before award.

A proposal that answers all six is worth more than a lower price with the same questions still open. If your project needs the media unit coordinated with other built-in joinery, lighting and finishes, coordinating it as one package under turnkey interior project solutions keeps those details on a single drawing set instead of spread across several suppliers.

Common questions

Can a floating TV unit be added to a wall that is already finished?

It can, but the fixing path has to be established first. Plasterboard alone rarely carries a wall-hung carcass, so the proposal should state whether a batten frame or steel backing will be installed and who carries out that work.

Should equipment sit inside a closed cabinet or on an open shelf?

Open shelving is easier to cool and to operate with remote controls. Closed cabinets look tidier but need ventilation and, behind glass, a check on heat build-up. State the choice on the drawing so the shelf depths and air paths are cut for it.

Why do two floating units of the same size differ so much in price?

Usually because of carcass thickness, the suspension system, whether drawers and doors are included, the finish type and whether the unit arrives assembled. Comparing those six items side by side explains most of the gap.