A glass door and a lacquered door in the same wardrobe run look like one elevation from across the room, but they are two different surface systems meeting at a frame. That junction is where most finish disputes start: the sheen does not match the approved sample, the glass reflection shifts the apparent colour of the lacquer, or the frame on the drawing is not the section that arrives on site. Here is the finish detail list we ask buyers to close out before an order for Glass & Lacquer Combination Wardrobes goes into production.

Wardrobes in this range are made to measure, with material, finish and layout specified for each project. That flexibility is the point — but it also means nothing is standard until you have written it down and checked it against a physical sample.

1. Lock the lacquer sheen, not only the colour

"White gloss" means different things to different workshops. When you specify a lacquered door panel, put the colour reference and the sheen band in the same line of the specification. A high-gloss front and a matte lacquer front can carry the identical colour number and still read as two separate schemes once installed side by side.

Checks worth completing before sign-off:

  • Request a finished sample panel rather than a printed swatch or a photograph. Colour depth changes once the lacquer is cured and polished.
  • View that sample beside the glass you have selected, under the actual room lighting. Glass reflects the room back at itself and shifts how the neighbouring lacquer tone reads.
  • Choose gloss or matte per elevation on purpose. Fronts in a high gloss lacquer finish amplify reflections in bedrooms with large windows or an opposing mirror.
  • Decide which face receives the light. Fingerprints and fine swirl marks show far more clearly on a gloss panel set at an angle to the window than on one facing it squarely.
  • Ask how many coats and what build the finish uses, and whether edges and door returns are finished to the same standard as the flat face.

2. Specify the glass by behaviour, not by name

A wardrobe front of glass is judged on two things: how much it reveals, and what tint it casts into the room. Clear, bronze, smoked, frosted and ribbed fronts can all sit in the same frame type, so the product name alone will not tell you which behaviour you are buying.

Glass typeBehaviour in a wardrobe frontWhere it tends to work
Clear glassFully transparent; contents and internal lighting become part of the elevationStyled display bays and boutique-style dressing rooms where the interior layout is deliberately composed
Frosted glassDiffuses light and conceals contents while still reading as a translucent surfaceBedrooms where you want softness through the front without an open view of hanging clothes
Smoked glassTints the reflection and reads darker against pale wallsContemporary schemes with dark joinery or metal accents
Bronze glassWarm tint that sits well with brass, bronze hardware and timber tonesVilla bedrooms and hospitality-style dressing rooms
Ribbed glassVertical flutes distort what sits behind and catch light along the patternFeature bays used to break up a long run of flat lacquered doors

For each glass type, confirm the tint name, panel thickness, whether the surface is polished or patterned, and which face is visible from the room. Then hold a full-size offcut against your lacquer sample before committing the whole run.

3. Settle the frame: colour, sightline, and how it meets the panel

The metal frame is the line that makes a glass front look deliberate or accidental, and it is the component most often substituted — because "black frame" covers several different finishes and section shapes.

  • Finish process, not just shade. Anodised, powder-coated and brushed metallic frames can share a colour name and behave differently under warm lighting. Confirm which process applies.
  • Sightline width. A slim frame is a design decision with structural consequences. Agree the visible face width on the drawing, then confirm it against the section the workshop will actually use for your door size.
  • Frame-to-lacquer junction. Ask whether the frame butts into the panel, rebates around it, or uses a cover trim. This decides whether you see a shadow gap and whether the two surfaces sit flush.
  • Corners and intermediate mullions. Confirm the joint method at external corners and where two bays meet. Mitred and square joints read very differently once hung.

If the goal is for the frame to recede into the joinery rather than draw the eye, compare a minimalist black frame elevation against an all-lacquer door in the same room before you decide.

4. Design what sits behind the glass, not just in front of it

A glass front commits you to whatever is visible, so the internal plan becomes a finish decision rather than purely a storage one. We confirm the following alongside the elevation:

  • Hanging heights, shelf spans and drawer rows drawn onto the elevation itself, so nothing important sits hidden behind a frame bar.
  • The carcass interior colour. A pale interior behind a transparent front lifts the whole unit; a dark interior makes the identical front read heavier.
  • Integrated lighting: fitting type, cable route, switch position, and whether the driver stays reachable after installation.
  • Backing for display bays — mirror, lacquered panel or fabric — because that is what the glass reflects back into the room.
  • Which bays are open display and which sit behind solid doors, so the mix of glass and lacquer is fixed on the drawing instead of being left to the fitter on site.

5. Choose the door system before fixing the elevation

The same finish combination can be built as sliding or hinged doors, and each changes what you need to verify.

  • Glass sliding door fronts: confirm the track type, whether it is exposed or recessed, and how far panels overlap when closed.
  • Glass hinged fronts: confirm hinge type and position, opening direction for each door, and clearance from handles, walls and beds.
  • Glass walk in wardrobes: confirm how the entrance treatment relates to the lighting plan, since the entire room becomes the display surface.
  • Glass corner wardrobes: confirm which doors can physically open in the arrangement, and what sits behind the return panel.

6. Put protection, tolerance and site sequence in writing

Most finish failures on these units trace back to handling or measurement rather than the materials themselves. Before production starts, confirm:

  • Who takes final site dimensions and at what stage — after flooring, plaster and skirting are complete, not before.
  • The tolerance you expect at wall and ceiling junctions, and how out-of-plumb or splayed walls are compensated on site.
  • Protective film on glass panels and edge protection on lacquered fronts for transit, plus who removes them and when.
  • Packaging and loading plan for mixed consignments. A glass panel travelling against a gloss lacquered panel will mark it.
  • The snag process at handover: which defects are rectified on site, which need a replacement panel, and how long that replacement takes to remake.

On villa and apartment projects where wardrobes sit alongside other interior fixtures, order wardrobe sample panels at the same time as flooring, door and joinery samples. Lacquer, glass and the surfaces beside them are judged together in one room, and approving them separately is how a scheme ends up looking mismatched even though every item was signed off.

SANTERSON produces made-to-measure wardrobe fronts as part of a wider range of furniture and interior fixtures, with material, finish and layout specified per project. Send us the elevation, your lighting notes and the finishes you have already selected, and we will confirm dimensions and specifications for each project before production begins.