A mirror cabinet with built-in lighting looks like a simple line item on a bathroom schedule, and it is treated that way in most enquiries: a size, a colour, a quantity. The problems appear later, when the cabinet arrives on site and the electrician discovers there is no switched feed behind the mirror, or when the mirrored door swings into the basin tap. Confirming the following points before production starts keeps an Santerson LED mirror cabinet from becoming a site variation.
1. The measured opening, not the nominal one
Send the width and height of the finished wall opening, after tiling, plasterboard and any waterproofing membrane, rather than the dimension on the architectural drawing. Mirror cabinets are made to measure, so a tile build-up that was not accounted for will change both the cabinet size and the clearance needed for the door. Note three things in particular:
- The finished floor level, because it fixes the mounting height of the mirror surface relative to the basin tap and the user's eye line.
- The projection available from the wall, including the depth of the cabinet carcass plus door handle or pull, plus the swing arc if the doors are hinged rather than sliding.
- Adjacent obstructions: a wall-hung WC cistern, a shower screen, a towel rail, or a door that opens into the same wall.
2. Door type and clearance
Hinged doors give full access to the interior shelves but need clear space in front of the cabinet. Sliding doors suit narrow bathrooms, yet they need a track allowance and cannot both be pulled fully forward. If the cabinet sits directly above a vanity basin, check the tap spout height before choosing the door type. This is the most common reason a mirror cabinet is returned on site.
3. Electrical supply and switching
Integrated lighting needs a decision made before the wall is closed up. Confirm with your electrician:
- Where the supply cable terminates: behind the cabinet, at ceiling level, or at the vanity side.
- Whether switching is on the cabinet itself, on a wall plate, or linked to the room lighting circuit.
- The local mains voltage and frequency for the destination country, and where the driver or transformer is located so it stays accessible for service.
Where the mirror cabinet's own lighting is not enough for the whole vanity zone, matching vanity lighting or integrated cabinet lighting can be specified in the same finish at production stage, so the light colour and trim match across the room instead of being mixed on site.
4. Finish and material selection
Bathroom joinery sits in a humid space next to tiles, tapware and paint that other trades choose. Fix the carcass colour, door face and hardware finish against physical samples or the approved schedule, and record them on the order. Where cabinets repeat across several bathrooms, request the same batch reference so subtle shade differences do not appear between rooms.
5. Relationship to the vanity below
Mirror cabinets are usually ordered with vanities, and the two need to be checked together. A Santerson Floating Vanity leaves the wall below the mirror clear, which simplifies both the cabinet mounting and the waste pipework; a Santerson Double Vanity is wider than most single cabinets, so the mirror width should be set to line up with the vanity rather than the wall. Confirm basin type, whether integrated countertop, undermount or vessel, because a vessel basin raises the tap height and therefore the comfortable bottom edge of the mirror.
6. Interior layout
Decide what goes inside before producing the carcass: shelf heights for tall bottles, a shaver socket position, drawer units versus open shelving, and whether any niche is left open for display. Interior layouts are inexpensive to change at the drawing stage and expensive to change after the carcass is cut.
7. Packaging, delivery and storage on site
Mirrored fronts and glass shelving travel poorly in mixed containers. Ask how mirror cabinets are crated and where they sit in the container relative to heavier joinery. On arrival, keep crates upright and stored indoors, off the floor, until the wet trades have finished. A cabinet standing in a tiled room while grout and paint are still being applied is at risk of both impact damage and moisture.
8. What we need from you before production starts
Custom work only begins once the following are confirmed. A short, complete enquiry usually contains:
- The room-by-room schedule: cabinet width, height, depth, door type and mounting height.
- Confirmations of the points above: supply location, switching method, mains voltage, finish references.
- The delivery address, and who receives the goods on site.
- Any project drawings that show adjacent fixtures, so clearances can be checked against them.
Santerson manufactures custom mirror cabinets to order alongside vanities, basins, showers and the rest of the bathroom schedule, which means one production run covers the whole room and one delivery covers the whole project. Send your schedule and the electrical notes with it, and we will confirm dimensions, clearances and lighting specification before anything is cut.