A product submittal is the package a buyer, contractor or designer reviews before approving an outdoor swim spa for a project. For the Outdoor Swim Spa WS-S38, the goal of the submittal is simple: every number, drawing and option on paper should match what will actually be delivered and installed. Below is the checklist we use when preparing submittals for this model, organized the way most project reviewers read them.
1. Model identification and shell dimensions
Start with an unambiguous reference to the unit. The catalog record lists the model as WS-S38 with overall dimensions of 3760 × 2080 × 1110 mm (length × width × height). Put those three figures in the submittal exactly as they appear on the approved product page, and state whether they describe the outer shell envelope or the internal water volume. That distinction drives everything downstream: transport clearances, crane or forklift access, foundation footprint, and how close the unit can sit to a boundary wall or pool fence.
Attach one dimensioned drawing showing the plan view and one section view. Reviewers use these to check that the spa fits the allocated terrace, garden or rooftop area with enough room left for the equipment compartment and for maintenance access.
2. Water system schedule
The WS-S38 catalog record lists a water pump set of 3 pieces and 1 filter pump, with a jet total of 51 pieces including 6 water columns. Present these as a schedule rather than a paragraph: item, quantity, function. A table lets the mechanical consultant cross-check against their own hydraulic assumptions without re-reading marketing copy.
- Water pumps — 3 pcs in the catalog configuration
- Filter pump — 1 pc, sized for the circulation and filtration circuit
- Jets — 51 pcs total, including 6 water columns
- Control system — 1 set, with the operator interface shown in a photograph
Note clearly which items belong to the standard catalog configuration and which are project-specific. Where an item is not stated in the catalog record, leave it out of the submittal rather than estimating it; a submittal that carries assumed values creates change orders later.
3. Electrical data
The catalog lists total power for this configuration at 14.05 kW. That figure tells the electrical designer how much load to reserve, but it is not enough on its own. A complete submittal also shows the supply arrangement being quoted — phase, voltage and frequency for the destination market — plus the recommended circuit protection, cable sizing guidance and the location of the local disconnect. Electrical requirements vary by configuration and by country, so confirm them against the selected build before the drawing is issued.
Include a simple one-line diagram showing the spa, its pumps, the control system and the isolation point. Contractors install from that diagram far more reliably than from a specification paragraph.
4. Water treatment and sanitation options
The WS-S38 catalog record shows ozone as a featured system, and UV sterilization appears among the catalog-listed options. State which sanitation route is included in the quoted unit and which are optional upgrades, because this affects both the plant-room space and the maintenance routine handed to the client at handover. If the project requires a specific treatment method, say so in the submittal cover letter and request written confirmation.
5. Optional accessories actually being supplied
Catalog-listed options for this range include control systems, UV sterilization, additional water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the submittal should list only what is confirmed for this order, with a short note on each item's function. A heat pump changes the energy profile of the installation; insulation matters where the spa sits in a cooler climate; steps change the access geometry around the shell.
If the project scope calls for a different shell geometry — square, round, oval or curved — that belongs to the customizable shape outdoor spa line rather than the fixed WS-S38 record. Flag it as a separate line item with its own drawing set.
6. Lighting and water features
The catalog configuration lists 4 LED lights plus 12 small LED lights, and shows a waterfall among the featured elements. Photographs of the lighting in operation help a client approve the ambience; a low-voltage or line-voltage note on each fitting helps the electrician. Keep these two audiences in mind when writing this section.
7. Structure, shell and finish
For this range the shell is acrylic with a reinforced cabinet structure. The submittal should state the shell material, the colour or finish being supplied, and how the cabinet panels are accessed for service. Where a project pairs the spa with surrounding building and construction materials — decking, cladding or paving — include the interface details so the two trades do not each assume the other has handled the edge condition.
8. Logistics, site preparation and support
SANTERSON operates as a furniture and building materials supplier covering design, production, door-to-door delivery, installation support and after-sales service. For a swim spa submittal, translate that into practical items: packing and crate dimensions, the delivery method to site, the lifting points on the shell, the foundation or plinth the client must prepare, and the access route from the truck to the final position. A unit of this size rarely clears a standard side gate, so the delivery route should be confirmed before the order is placed.
9. Documentation to attach
- Dimensioned plan and section drawings of the approved configuration
- Equipment schedule with quantities and functions
- Electrical data sheet and one-line diagram for the destination supply
- Photographs of the unit, jets, lighting and control interface
- Written confirmation of every option included or excluded
- Site preparation note covering foundation, access and lifting
- Contact details for the person who answers technical queries during review
Before you submit
Read the package once as the approving engineer would. Every dimension should be traceable to a drawing, every electrical figure to a supply assumption for the destination market, and every option to a written confirmation. Where the catalog record is silent — a swim training system, for example — the correct entry is "not listed", not an estimate. A submittal built that way gets approved on the first pass.
Send the WS-S38 enquiry with your project drawings and we will return a submittal set prepared to this structure, matched to the configuration you specify.