A swim spa only becomes a clean line item in a project procurement brief once three things are settled: the shell envelope that fits the site, the equipment set that is actually included, and the services around delivery, installation and handover. This note uses Outdoor Swim Spa WS-S06M as a worked example, so you can copy the same structure across the rest of the swim and hydrotherapy range on a villa, resort or clubhouse schedule.

Start with the envelope, not the jet count

WS-S06M sits in Santerson's configurable outdoor swim and hydrotherapy range. The catalogue lists its dimensions as 5900 × 2200 × 1610 mm. Treat those three numbers as the starting point for a site check rather than a finished answer: the length has to clear structure, doors and plant runs, while the width decides whether circulation space survives on all four sides for servicing and for users moving in and out of the water.

Depth is the number that changes how the product reads on a room data sheet. At 1610 mm the spa is deep enough that standing access, steps and the finished surround level all have to be drawn together early. Write the shell size into the brief as catalogue figures plus the required clearance zone, so the civil and landscape packages are tendering against the same assumption.

List the equipment set exactly as configured

The specification block published for this model shows one control system, two water pumps, one filter pump, a jet total of 48 pieces, LED lighting recorded as 17 with 17 small LED lights, and total power of 6.95 kW. The features shown are water jets, LED lighting, ozone and four water columns.

Two habits keep this section honest in a tender document:

  • Quote the numbers as they appear on the product page, and mark them "as catalogued, to be confirmed for the selected configuration" rather than rewriting them into your own table.
  • Record what is not listed. For WS-S06M the captured specification does not show a swim training system, so if the client expects lap swimming, raise it as a query instead of assuming an option will cover it.
Item to lock downWhat the catalogue shows for WS-S06MWhy it matters in procurement
Shell envelope5900 × 2200 × 1610 mmDrives foundation, surround and clearance drawings
Pumps2 water pumps, 1 filter pumpSets plant space, noise position and maintenance access
Jet total48 pcsDefines the hydrotherapy experience being sold to the end user
Lighting17 LED lights; 17 small LED lightsFeeds the lighting and controls schedule, including night ambience
Total power6.95 kWSizes supply, protection and any dedicated circuit
Water treatment and featuresOzone; 4 water columnsClarifies what is standard versus an added option

Separate options from the base unit

Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs a line of its own in the bill of quantities with a quantity, a location and a named responsible party for supply. Heat pumps and insulation in particular change both the electrical load and the enclosure detail, which is exactly where late variations come from.

Ask for two documents before you award: an equipment schedule for the configuration you are buying, and the electrical requirement statement for that same configuration. A total power figure without supply conditions is not enough for an MEP engineer to design against, and it is a common source of site delay.

Compare within the range before you fix the model

Because the models share a common structure, comparison is quick once you line up envelope, pump count, jet total and power. The catalogue shows Outdoor Swim Spa WS-S06 at 5820 × 2220 × 1110 mm with a jet total of 56 and total power of 6.35 kW, so it trades shell depth for a different jet layout. Outdoor Swim Spa WS-S06CT is listed at 5880 × 2380 × 1400 mm with a swim training system, one water pump and 31 jets. Outdoor Swim Spa WS-S07M steps up to 7000 × 2200 × 1480 mm with three water pumps and a higher power figure, which is worth checking against the supply available on site.

Where a project needs a shape that does not fit the standard catalogue shell, the Swimming Pools and Swim Spas range also includes a customisable outdoor spa in square, round, oval and curved forms. Put custom geometry behind a separate line item with its own approval milestone, because it changes drawing review time.

Write the services scope into the same brief

A swim spa rarely arrives as an isolated purchase on a project. On villa and hospitality work the pool sits alongside outdoor furniture, paving, screening and lighting, and one supplier coordinating those packages reduces interface risk. SANTERSON is a China-based furniture and building materials manufacturer offering one-stop project supply, with stated services covering design coordination, custom and OEM work, logistics with door-to-door delivery, and installation and after-sales support. The site's cooperation steps run from project brief and design proposal to quotation and detail confirmation, then production, shipment and follow-up.

Use those steps as the milestone column in your brief: model selection confirmed against catalogue specifications; configuration and options frozen before production release; shipping terms and delivery address agreed; site access and installation sequence planned; handover checklist covering commissioning, spare parts and warranty documentation. Confirm commercial terms, lead times, duties and warranty wording for your own project rather than carrying them across from published marketing copy.

A short specification checklist

  • Envelope and clearance zone drawn to the same datum as the surrounding hardscape.
  • Pump, jet, lighting and power figures quoted as catalogued, with a confirmation line for the chosen configuration.
  • Explicit note on whether a swim training system is included or excluded.
  • Options priced individually: sterilisation, heat pump, filtration, insulation, steps.
  • Electrical supply conditions requested in writing for the selected configuration.
  • Delivery, installation and handover responsibilities named per package.

Specify WS-S06M against its catalogue envelope and equipment set, keep options itemised, and let the services scope travel with the product in the same document. Send your drawings and required configuration to SANTERSON and the brief converts into a quotation you can compare line for line against the rest of the range.