A buyer who has already picked the model usually has the easy part behind them. The harder part is turning a catalogue entry such as Outdoor Swim Spa WS-PC07A into a delivered, working installation on a villa terrace, a resort garden or a private pool deck — with the right options fitted, the power supply ready and the site prepared. Below is how that sourcing process runs step by step when the unit comes from a China-based manufacturer that also handles the fit-out around it.
What OEM actually changes on a swim spa order
For a swim spa, "OEM" rarely means redesigning the shell from scratch. In practice it covers the decisions that sit between the standard model and the unit that arrives on your site:
- Configuration of the listed equipment. Pumps, jets, control system and lighting are quoted as a set, and the set can be adjusted to the budget and the intended use.
- Optional accessories. Catalogue options for this range include control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Each one changes both price and the site preparation required.
- Finish and branding. Surface colour and trim can be matched to the surrounding landscape design; project buyers who resell or develop under their own brand can also request private labelling on applicable products.
- Quantity flexibility. A single villa unit and a multi-unit resort order are handled through the same Custom & OEM service, with order quantities agreed per project rather than fixed to one minimum.
If your brief needs more than the standard range — an oval spa set into a curved terrace, for example — the Customizable Shape Outdoor Spa line covers square, round, oval and curved shapes with an acrylic shell and structural reinforcement, which is where shaped hydrotherapy pools are specified rather than adapted.
Step 1 — Send the drawing, not just the model number
The fastest way to lose two weeks is to enquire with a model number alone. What the factory needs at the first step:
- A site plan or terrace layout showing clear dimensions, access route and where the spa sits relative to the building.
- Intended use: lap swimming, hydrotherapy, guest amenity at a hotel, or private family use. This drives which jet layout and which accessories are sensible.
- Whether the unit is above ground, semi-recessed or set into a deck — this changes access, drainage and the steps required.
SANTERSON works these briefs as part of its turnkey project service, so a swim spa is usually specified alongside the pergola, loungers and outdoor furniture around it rather than as an isolated purchase.
Step 2 — Confirm the specification line by line
Once the brief is clear, the quotation comes back with a specification sheet. Check it against your own requirements before approving production. The catalogue figures for WS-PC07A read as follows:
| Catalogue dimensions | 7000 × 3000 × 1470 mm |
| Control system | 1 set |
| Water pump | 4 pcs |
| Filter pump | 1 pc |
| Jet total | 62 pcs |
| LED lights | 1 |
| Total power | 9.55 kW |
| Features shown | Water jets, LED lighting, Ozone |
Three points deserve attention at this stage. A swim training system is not listed for this model in the captured specifications — if you want counter-current swimming as the primary function, ask explicitly whether it is included, offered as an option, or whether a variant such as WS-PC07A-T is the better fit. The 9.55 kW figure is an electrical load your local electrician has to support, so confirm supply requirements, circuit sizing and whether a heat pump is added on top of it. And where catalogue wording and the specification block differ in naming a feature, do not assume they describe the same item — get the fitted configuration confirmed in writing.
Step 3 — Approve the production plan
After the quotation and details are confirmed, the order moves into manufacturing with quality control at each stage. This is also the moment to lock in what arrives on the pallet: steps, insulation package, spare filters, control panel version and any branding. Changes after production starts cost time, so accessories that look minor — handrails, cover, deck steps — are worth settling now.
Step 4 — Freight, customs and the delivery address
A swim spa is heavy, oversized freight, so the logistics plan matters more than for furniture. Logistics and door-to-door delivery covers sea, air and rail forwarding, packaging and container loading, customs paperwork such as commercial invoices, packing lists and certificates of origin, shipment tracking and delivery to site. Decide early on the Incoterms you are buying on, who handles import clearance locally, and whether the delivery vehicle can reach the site — a narrow villa lane or a rooftop terrace needs that answered before the container is booked.
Step 5 — Site preparation runs in parallel, not afterwards
The most common cause of a delivered-but-unusable spa is site work that started too late. Before the unit ships, confirm on your side:
- Slab or deck loading capacity for a full spa of this footprint, verified by your local engineer.
- Electrical supply, dedicated circuits and protection, installed to local rules by a licensed electrician.
- Drainage, overflow and any water-fill source at the location.
- Access for craning or walking the shell into position, plus clearance for future pump and filter servicing.
These are local works under your contractor. Importers remain responsible for meeting their own country's electrical, structural and pool or spa regulations; a manufacturer's specification sheet is not a compliance certificate.
Step 6 — Installation, inspection and what happens after
The supplier's installation and after-sales support covers on-site installation, inspection and snags, warranty coverage, spare parts or replacement, and ongoing maintenance. Ask before ordering how installation is delivered in your country — remote guidance with a local contractor, or an attending team — and get the warranty terms and spare-parts lead times stated in the order documents rather than assumed from marketing copy.
Questions buyers ask at the quotation stage
Can one purchase order cover the spa and the surrounding outdoor furniture?Yes, and it is usually the neater route. Grouping the swim spa with loungers, a motorised louvered aluminium pergola or a shade structure means one production plan and one shipment.
What documents should I expect with the shipment?Commercial invoice, packing list and the shipping documents your forwarder needs for clearance; certificates of origin where applicable. Keep the approved specification sheet with them for the installer.
Which model should I compare before deciding?Compare within the same length class first. Alongside WS-PC07A, the swim spa range includes shorter and longer shells with different jet counts and pump sets, so compare dimensions, jet total and power draw rather than model names.