A design brief that stops at "corner unit, grey, one off" is the reason storage quotations come back wrong. Corner storage in a bathroom sits against two walls, meets a door swing or a vanity return, and has to be built around whatever the wet area services already occupy. If the drawing you send your supplier does not settle those points, someone has to guess — and guesses surface later as rework on site. Below is the information set we ask for when a project team sends us a Santerson Corner Storage enquiry, and how each item changes what gets manufactured.

What the product actually is before you brief it

Corner storage sits in the Santerson Storage Units range alongside Santerson Drawer Units, Santerson Freestanding Cabinets and Santerson Open Storage. These are made-to-measure pieces for residential bathroom projects: dimensions, layout and finish are specified per project rather than picked from a fixed size grid. That is worth stating up front, because it changes the kind of drawing you need to send. A dimensioned sketch with clear wall and service notes is usable. A mood board with no numbers is not.

The same range logic applies if the corner you are solving for is open rather than enclosed. Santerson Corner Open Shelving and Santerson Corner Tall Cabinets are briefed the same way, so the checklist below works across all three.

The six numbers a corner unit enquiry needs

Send these and we can quote. Miss them and the first reply will be a set of questions, which costs you a week.

ItemWhat to measure or stateWhy it matters
Finished wall lengthsBoth return legs, measured to the finished face of the tiled or paneled wall — not the structural wall.Tile, waterproofing and panel build-up routinely eat 15–25 mm per side. Rough-in dimensions will make the carcass too wide for the recess.
Clear heightFloor finish to ceiling finish, plus anything hanging into the space: bulkhead, shower screen head, window sill.Decides whether the unit runs floor-to-ceiling or stops below an obstruction, and whether the top compartment is reachable at all.
Corner angle90°, or the actual angle if the corner is out of square — state the deviation.Older villas and renovated shells are frequently off square. A 2° error at the return leg throws the front face badly out of plumb.
Door and drawer clearanceWhich way the unit opens, and what it must clear: a vanity drawer, a hinged door, a towel rail, a toilet pan.Hinge hand and handle projection have to be settled on paper, not discovered at handover.
Service positionsPipes, outlets, floor waste, any existing boxing that the unit must sit around or against.A carcass cannot be notched around live services without an agreed detail; sometimes the fix is a shallow setback instead.
Fixing substrateWhat is behind the finish — stud wall, brick, tile over render — and whether a noggin/blocking can be added.Wall-hung and tall corner units need solid fixing. This decides whether blocking goes in before tiling or the unit becomes freestanding.

Then specify the inside, not just the outside

Most corner storage failures are interior layout problems. The front looks right; the useful volume is wasted.

  • Shelf versus drawer in the return leg. Deep shelf in a narrow corner returns is hard to reach at the back. Drawers or pull-out trays keep the depth usable, which is why projects pairing a corner unit with drawer units tend to store better than a single tall cabinet.
  • Adjustable or fixed shelves. State the tallest item that has to fit — bottles, towels stacked, a linen reserve — and let that set the shelf pitch.
  • Open or closed. Closed doors hide clutter in a guest bathroom; open shelving suits a towel store near a shower but needs a tidy habit and a dusting routine.
  • Interior lighting. If the unit is being read as part of a larger joinery wall, note it now — integrated cabinet lighting is far cheaper to design in than to retrofit.

Finish and material notes that survive production

In the brief, name the finish by where it will be matched, not by a colour word. "Greige" means four different things to four factories. Instead give us one of: an existing sample you can post; a reference from another product line already specified on the project; or a substrate plus sheen decision — matte, gloss, wood grain, lacquer, melamine, acrylic — and let us confirm what we can hold across the whole fit-out.

For a bathroom corner unit specifically, flag these in writing:

  • Whether the unit sits inside or outside the shower wet zone, and whether it backs onto a basin splash area.
  • Edge treatment on visible returns — matching edge band, wrapped profile, or a mitred return to wall paneling.
  • Hardware expectations: soft-close, handleless/reveal pull, or exposed handle, and whether the hardware must match ironmongery already on site.

If your project also has kitchen cabinetry or wardrobes in scope, send those schedules with the corner storage enquiry. Ordering bathroom storage, interior fixtures and built-in joinery through one manufacturer is how you keep the same veneer, the same edge detail and one delivery window instead of three.

How the enquiry moves from drawing to production

Santerson works as a furniture and building materials manufacturer on turnkey villa, hospitality and office projects, so a single-item corner unit usually arrives inside a larger package. The steps are the same either way:

  1. Brief and drawings. We read your dimensions, layouts and finish references, then come back with questions where the drawing is silent.
  2. Specification and quotation. Materials, construction, hardware and configuration are confirmed line by line, and you get a price against that confirmed specification — not an indicative number that moves later.
  3. Production and quality control. The unit is made to the approved specification, with the rest of your joinery and furniture where applicable.
  4. Packing and shipping. Freight by sea, air or rail with the export paperwork handled on our side; you confirm import terms for your country when we quote.
  5. Site handover. Installation support and after-sales cover are arranged as part of the project package.

That workflow is described in full on our Turnkey Solutions and Custom & OEM Service pages.

A short pre-send checklist

  • Finished-face dimensions for both wall legs, height to ceiling, and the corner angle.
  • Sketch showing door swing, adjacent fixtures and service positions.
  • Interior layout: shelf pitch, drawer banks, open bays, lighting.
  • Finish reference — sample posted, or substrate plus sheen named.
  • Hardware hand and type, matched to existing ironmongery where required.
  • Project location, delivery address and required on-site date.
  • Any other joinery in the same project that should match this unit.

Send it to Contact Us with "corner storage" and your project name in the subject. A complete enquiry like the one above is what lets us quote from the drawings rather than from a phone call.

Questions buyers ask before they send the drawing

Do I need an architect's drawing, or is a measured sketch enough?

A clean measured sketch works, as long as it shows finished-face dimensions, the corner angle, and what the unit must clear. If you have architectural drawings, send them — but we still confirm the manufacturing dimensions against site conditions before production.

Can one corner unit match a wardrobe or kitchen line already on the project?

Yes, and that is usually the point. Send the existing finish reference or the schedule for the other joinery, and we confirm material and edge construction across the set before quoting.

Is a corner storage unit worth making to measure if I only need one?

For an awkward corner — an out-of-square wall, a bulkhead, a service boxing — made-to-measure is the difference between usable storage and a unit that does not close properly. For a straightforward square recess, tell us that too; we will say so.

What about installation on site?

Installation support and after-sales cover are part of the project service. Fixing method depends on your substrate, which is why we ask what is behind the tile before the unit is built.