A living room wall, a media unit in the family lounge and bedroom storage are rarely bought as one line item. Yet when those pieces are ordered separately, finishes drift, reveals stop lining up and the site ends up chasing three different suppliers for what should have been a single joinery package. Santerson Mixed Open & Closed Systems is designed to sit at the centre of that package: modular living systems combining open and closed elements, with finish, layout and dimensions specified for each space. This guide shows project buyers how to scope and budget them — what to schedule room by room, which collection suits each wall, how a quotation breaks into cost layers, and how to coordinate one multi-product order so the figure you approve is the figure you pay.

Start With a Room-by-Room Schedule, Not a Product List

The fastest way to blow a joinery budget is to price one item and assume the rest will follow later. Before any enquiry goes out, list every built-in element in the project: living room systems, media walls, bedroom storage and hallway cabinetry. For each entry record the wall length and height as built, what has to sit inside the closed sections, and what you want left on open shelves.

Open-to-closed proportion is the decision that drives both appearance and cost. More open shelving means fewer doors, less hardware and a lighter visual weight; more closed frontage hides clutter but adds panel area, hinges or slides and finishing work. Decide it per room rather than across the whole project, because the living room brief and the guest bedroom brief are almost never the same.

These systems are made to measure, so the schedule is the document that sets your price. A drawing with wall lengths taken on site will quote far more accurately than one sketched from a plan.

Match the Right Collection to Each Space

Mixed open-and-closed configurations appear across several collections, and choosing the collection first keeps the specification coherent. The product families are close relatives, not duplicates: they differ in where they are installed and how much of the wall they take.

ProductCollectionWhere it belongs
Santerson Mixed Open & Closed SystemsModular Living SystemsResidential living rooms and lounges where seating, display and storage share one wall.
Santerson Mixed Open & Closed StorageIntegrated Storage WallsIntegrated wall storage where open display sections and closed cabinets share one run.
Santerson Open & Closed Combo UnitsTV Cabinets / Media UnitsMedia units and TV cabinetry where open shelving and closed storage sit side by side.
Santerson Full Height Storage WallsIntegrated Storage WallsFull-height storage walls where capacity is the priority.
Santerson Full Height Media WallsMedia & TV WallsFull-height feature walls built around a screen, with services planned behind the joinery.

If one project needs all five, that is fine — but specify them as one family with a shared finish schedule. That is where working with a one-stop furniture and building materials supplier pays for itself: the same laminate, veneer or lacquer decision can be carried through wardrobes, media walls and kitchen cabinetry instead of being matched separately for each room.

Build the Budget in Three Layers

Split the figure into layers so you know what each change costs. We quote villa and apartment packages this way, and it works just as well when you are checking a supplier's number line by line.

1. Carcase and configuration

  • Overall run length and height per wall, including any return or corner.
  • Shelf count and spacing, drawer bank quantity, and where tall closed sections sit.
  • Appliance or screen positions that need an opening cut to size.

2. Finish and hardware

  • Door front material and finish — matte, high gloss, veneer, glass or metal frame.
  • Hardware grade for high-use rooms, and whether handles are required or a handleless profile is specified.
  • Integrated lighting in display niches, plus the wiring route that feeds it.

3. Interface works

The layer most buyers forget: wall preparation, skirting removal, floor levels, and the point at which the joinery meets plasterboard, stone or timber flooring. These sit with others on site, and an unprepared wall turns a fixed joinery price into a variation.

Product pages list finish, layout and dimension options rather than a fixed specification. Confirm dimensions, materials, hardware and any electrical options for the configuration you have chosen before the order is signed off.

Coordinate the Multi-Product Order Around One Drawing Set

A multi-product project rarely stops at joinery. Flooring runs under the units, wall panels sit behind the media wall, lighting feeds the display niches and doors abut the tall cabinets. When those items come from different sources, each one arrives with its own tolerance and its own idea of where the finished floor level is.

Issue one coordinated drawing set for the whole package and let it govern everything: the thickness of the European Oak Herringbone Engineered Wood Flooring, wall panel and ceiling lines, wardrobe fronts in the bedrooms, and the media or storage walls in shared spaces. Our interior design and coordination service covers space planning, furniture layouts, 3D visualisations and production coordination with on-site guidance, so the joinery drawing and the fit-out drawing come from the same set.

For villa and apartment work in Australia — our published project cases include villas in Willoughby, Perth, North Turramurra, Melbourne and Sydney — furniture sourcing for Australian projects normally bundles the joinery with flooring, lighting and loose furniture into one coordinated delivery. The scope, transit terms and delivery arrangements are confirmed project by project, but a single production window and one set of packing lists cost less to manage than several separate consignments.

Five Checks Before You Sign Off a Quotation

  • Every wall in the schedule appears on the quotation, with its length and height stated next to it.
  • Open shelves, closed sections and drawers are itemised separately, so you can cut scope without cutting the design.
  • Finish names match across rooms and across product families — check them against the finish sample, not the render.
  • Screen, appliance and lighting positions are dimensioned on the drawing, with the power and data routes shown.
  • Delivery scope, packaging and who installs on site are written into the order.

Send us your room schedule, wall dimensions and target finish, and we will price Santerson Mixed Open & Closed Systems alongside the rest of the package as one coordinated quotation. Contact PHILLIP on WhatsApp +86-13928214007, email santerson@qq.com, or use the contact page to start a project enquiry.