A floating TV unit rarely fails because of the joinery alone. It fails because the people who own the wall never agreed on the same drawing at the same time. The unit hangs off a wall that also carries the television, the media wiring, sometimes a fireplace, and always somebody's opinion about sightlines from the sofa. If you are procuring made-to-measure built-in furniture for a villa or apartment project, the approval path is as important as the specification. Below is the sequence we use with architects, builders, interior designers and owners on residential projects, so that one sign-off actually means something.

Start by naming who signs what

Before any dimension is drawn, put a short responsibility list in the project file. A floating TV unit sits at the intersection of several trades, so vague ownership is what causes rework later.

  • Interior designer or design lead: appearance, proportions, door and drawer layout, finish and handle choice.
  • Builder or site contractor: wall construction, blocking and fixings, floor levels, access for delivery and installation.
  • Electrical or AV consultant: screen position, socket and data outlets, cable routes, equipment ventilation, remote-control line of sight.
  • Owner or end user: what sits inside the unit, how media equipment is stored, whether devices are visible or concealed.

One person should hold the consolidated drawing set and be the only voice that issues a revision number. Everything else follows from that.

Set three approval gates, not an open-ended review

Unbounded comment rounds are where built-in furniture budgets disappear. We recommend three fixed gates, each with a defined output and a defined owner.

Gate What is approved Who must confirm
1. Layout and elevations Unit length and height, mounting height, screen centre, open niches versus closed storage, relation to fireplace or skirting Design lead, owner, builder
2. Services and structure Socket and data positions, cable drops, equipment ventilation, wall substrate and blocking for the wall-mounted unit Builder, electrical or AV consultant
3. Finish and hardware release Material and finish sample reference, door style, handles or handleless profile, glass or shelving options, integrated lighting where specified Design lead, owner

After gate three, changes are possible but should be priced and dated. Recording that decision in the same file avoids the common argument about who asked for what.

Get the wall decisions approved before production starts

For a wall-mounted unit, the site condition has to be signed off by the builder, not assumed from a drawing. Our floating TV units are made to measure with material and finish options and a layout tailored to each project, so the wall is part of the specification rather than an afterthought.

  • Confirm the wall substrate and whether structural blocking or a steel frame is needed behind the fixing zone. Timber stud, light-gauge steel and masonry all behave differently.
  • Confirm finished floor level and the setting-out line, so the unit reads level against skirting, hearth or a recessed niche.
  • Confirm outlet positions against the final elevation. A socket placed behind the screen centreline blocks the mount; one placed behind a drawer prevents the drawer from closing.
  • Confirm how equipment is ventilated if set-top boxes or consoles sit inside a closed compartment, and whether doors are solid, glass or vented.

Practical habit: send the builder one marked-up elevation with dimensions from finished floor and from a fixed room datum. Two reference systems in one drawing is how units end up installed off-centre.

Approve the storage brief, not just the look

Owners rarely say what they actually need stored. Ask it explicitly and record the answer: consoles and remotes, board games, books, glassware, a record player, cables that must stay reachable. That answer drives the split between open display niches and closed cabinets, drawer counts, and shelf depths.

If the design extends to a full wall, it is worth reviewing it alongside related options while approvals are still open. Media and TV wall systems let the same language run floor to ceiling, while freestanding TV cabinets avoid structural fixing altogether — a genuine advantage in retrofit apartments or where the wall owner will not accept penetrations. Where display shelving is lit, integrated LED media units need their wiring and driver access agreed at gate two, because the electrician has to know before first fix.

Use one sample reference per finish

Finish approvals go wrong when people sign a photograph. At gate three, record the exact material and finish reference for each surface — carcass, doors, shelves, any glass — and keep one physical sample in the project file with the revision number written on it. Veneer, lacquer, laminate and textured panels read differently under warm feature lighting than under daylight, and the room where the unit lives is the only honest place to judge them.

If other joinery appears in the same sightline — a kitchen wall, wardrobes, a concealed door — approve the TV unit finish against those items together. Matching is decided by comparison, not in isolation.

Close the loop at handover

Issue the final approved drawing to the site team with a clear revision status, then walk the installed unit against it: level, fixing security, drawer and door alignment, cable routing, and that every outlet is where the electrical drawing says it is. Anything outstanding goes on a snag list with an owner and a date. That single document protects the client, the builder and the manufacturer, and it is what makes the next project's approvals faster.

Because our floating TV units are produced to project-specific dimensions and finishes, we can hold these gates with your design and site teams through drawing review, production coordination and on-site guidance. Send us your elevation and the wall build-up, and we will return a marked-up layout showing what needs approval and by whom.