Acoustic panels are one of the easiest interior items to get wrong when they are ordered from another country. The sample looks right, the drawing looks right, and then the delivered panels do not line up with the wall they were meant to cover. This guide walks through how buyers, contractors and project designers specify Santerson Acoustic Panels directly from our factory in Foshan, what information you need to send before production starts, and which checkpoints keep the order on schedule.
Start With the Room, Not the Panel
Our acoustic wall panels sit inside a wider paneling range that also covers wall panel systems, timber partitions and sliding screens. That matters for sourcing, because an acoustic requirement is rarely a single-item problem. In a villa media room, the same wall may carry the acoustic surface, a concealed door and a service run. In a hotel lounge or boardroom, panels meet flooring, skirting, lighting and joinery that someone else is supplying.
Before you ask us for a price, send three things: the room drawings with wall lengths and heights, your notes on what the space is used for, and the items that will sit next to the panels. From that we can propose a panel layout that reduces cutting on site, keeps reveal lines consistent with adjacent work, and flags any wall where the substrate needs preparation before fixing.
What You Specify When You Order
Every Santerson acoustic panel is made to measure rather than stocked in fixed sizes. The four decisions that shape both price and result are:
- Size and layout. Panel widths, module heights and the direction of the joints. We work from your dimensioned drawings and confirm a setting-out sketch with you before cutting.
- Face material and finish. Fabric-wrapped faces, timber veneer, lacquered surfaces and textured finishes are all available; the finish you choose drives cleaning method and how the panel reads under artificial light.
- Substrate and fixing detail. Whether panels are fixed to battens or directly to a prepared wall, and whether corners, external edges and reveals are finished with trims.
- Scope of the acoustic target. Tell us what you want to improve — speech clarity in a meeting room, background noise in a lobby, or reverberation in a large open space. That decides how much absorptive surface is needed and where it goes.
If your project needs panels that also divide a space, look at Santerson Acoustic Sliding Panels instead. The hardware, track loading and panel thickness are specified differently from a fixed wall installation, so we quote it as its own system.
The Documentation That Speeds an Overseas Order Up
Most delays on imported joinery are communication delays, not production delays. A short document pack agreed before the purchase order removes almost all of them:
- Approved setting-out drawings with every wall dimension, opening and service penetration marked.
- A signed finish sample — we send physical samples so the colour and texture are judged in the actual site lighting, not on a screen.
- A packing schedule by room or zone, so crates arrive labelled for the area they belong to and installers are not sorting panels on site.
- Delivery terms written into the order, including who handles customs clearance at destination.
Our team handles this as part of our OEM furniture manufacturing service: prototyping where required, material and finish confirmation, then production with quality checks before packing. For buyers coordinating several trades at once, the same drawings can also cover matching cabinetry, doors and other finishes from our factory, which reduces the number of suppliers arguing over tolerances on your site.
Freight, Handling and Arrival Checks
Panels are bulky, flat and easy to damage at the corners, so packing quality is worth as much attention as the product. We pack panels flat with edge protection and corner guards, and load containers so heavy items do not bear on panel faces. Through logistics and door-to-door delivery we arrange sea, air or rail freight, prepare the commercial paperwork, and track the shipment to your site or port.
Two practical points for the receiving side. First, check the crate list against the packing schedule while the container is still on site, so any shortage is reported while the loading evidence exists. Second, open enough crates to inspect faces and edges before the full installation begins — panels held in protective wrapping can be re-ordered or replaced far more easily than panels already fixed to a wall.
A Simple Timeline to Plan Around
- Send drawings, room use and finish preference. We advise on layout and absorptive coverage.
- Confirm the setting-out sketch and physical finish sample.
- Issue the purchase order with agreed delivery terms and packing schedule.
- Production, quality inspection, packing and container loading.
- Freight, arrival inspection, then installation to the fixing detail we issued with the panels.
Send your drawings and room details to our team through the contact page and we will return a layout proposal, a finish recommendation and an itemised quotation for the exact scope of your project.