A parquet quote that looks complete on the page can still leave you comparing prices for products that are not actually the same floor. Wear layer thickness, board format, grade, packing and freight terms each move the landed cost, and a line left out of one quotation tends to appear later as a variation order. The checklist below follows the order in which we review quotations at SANTERSON, so you can put two or three offers for European oak engineered parquet flooring on the same basis before you place an order.
Start With the Floor Build, Not the Price per Square Metre
Ask each supplier to state the make-up of the plank in one line: top-layer species and thickness, core construction, total thickness, board size and finish. Our parquet planks are built with a 3 mm solid European oak wear layer over a multilayer base, which is what allows the surface to be sanded and refinished later while the cross-layered core limits movement in changing humidity.
If one quotation says "engineered oak" and gives no wear-layer figure, treat it as incomplete. A 0.6 mm foil and a 3 mm lamella are both called engineered oak, they sand differently, and their prices should never be placed side by side.
Check the Pattern, Format and Grade on the Drawing
Parquet is where a generic description hides the largest price gaps. Confirm four separate items in writing:
- Layout pattern. Herringbone, chevron and basket blocks are cut and installed differently, and the wastage allowance differs with each. Our catalogue covers both parquet blocks and European oak herringbone engineered wood flooring, so the pattern should be named on the quotation line, not left to a photograph.
- Board size and thickness. Length, width and total thickness decide both material quantity and subfloor preparation. Ask for millimetres, not "standard size".
- Grade and appearance. select, natural and rustic describe how much sapwood, knot and colour variation is accepted. Two quotes using different grades look similar in a thumbnail and very different across a whole floor.
- Finish and colour system. Brushed, sawn or hand-scraped texture, plus the number of lacquer or oil coats, all belong on the line item. Our dark brown parquet is described by its deep brown grain, while other references in the same family are supplied in light bleached tones — a colour name alone is not a specification.
Read the Quantity Section Carefully
Ask whether the quoted area is net floor area or an area already including wastage, and what cutting allowance was applied. Herringbone layouts waste more material than straight planks, so a supplier who quotes the same allowance for both patterns has either guessed or trimmed their margin somewhere else.
Also confirm how the order is packed and counted — cartons per pallet, weight per carton, total pallet count. Those figures control your lifting equipment, storage area and installation sequence on site, and they are far cheaper to adjust at quotation stage than after delivery.
Put Freight, Heating and Accessories in Writing
The three items most often missing from a low headline price:
| Item to confirm | What a complete quote states |
|---|---|
| Delivery terms | The Incoterm and the named place, plus who arranges inland transport at destination. Compare every offer landed at the same address. |
| Underfloor heating | Whether the specific reference is compatible with the heating system in your drawings. Several parquet references in our range are listed as compatible with underfloor heating; ask for that line for the reference you are buying rather than assuming it carries across a whole collection. |
| Accessories and trims | Starter strips, end stops, transition profiles, adhesive or floating underlay, and maintenance oil or lacquer for site finishing — quoted as quantities, not "as required". |
| Subfloor condition | The moisture content and flatness tolerance the floor requires, and who is responsible for achieving it. |
Compare Commercial Terms Line by Line
Once the technical side matches, check the commercial lines with the same care:
- Payment stages and what triggers each one.
- Production lead time stated as working days from confirmed deposit, plus a written production schedule.
- Whether the price covers the current batch of timber or is subject to species and colour availability.
- What happens to short and over-quantity cartons on a completed project, and how reorders are matched for dye lot.
- Who signs off the pre-production sample, and when.
Why Flooring Is Easier to Quote in a Package
Parquet rarely arrives alone on a villa or hotel job. It sits in the same container conversation as wall panelling, doors, joinery, lighting and stone, and every one of those trades needs the floor level, threshold heights and finish schedule settled before fabrication starts. Sourcing them through a one-stop furniture and building materials supplier means one technical drawing set governs all of it, one consolidated shipment, and one point of contact for the sequence in which materials reach site. That coordination is where most of the savings on a fit-out actually come from — not from the lowest per-square-metre figure.
Our flooring range extends beyond parquet into engineered oak planks and other formats, all listed under engineered wood flooring, so a quotation can cover the whole floor plan in one document instead of four.
A Five-Minute Pre-Order Review
Before you sign, read your own purchase order back against these points. If any answer is missing, send it back to the supplier:
- Wear layer in millimetres, core construction, total thickness, board size.
- Pattern named on the line item, with the wastage allowance stated.
- Grade and finish system written out, matched to an approved physical sample.
- Underfloor heating compatibility confirmed for that exact reference.
- Delivery term and place, pallet count, accessory quantities, payment stages.
Send us your parquet enquiry
Share your floor plan, target pattern and colour direction, and we will return a quotation with the build-up, board format, packing list and delivery terms stated line by line — ready to compare against any other offer you hold. As a China-based manufacturer serving villa, hotel and office projects, we also quote flooring alongside the joinery, panelling and fixtures that surround it through our turnkey interior project solutions.