A mirrored sliding wardrobe looks simple on a rendering: two or three reflective panels that slide across a bedroom wall. On site it is one of the tighter items to approve, because the mirror glass, the sliding gear and the carcass all have to agree with each other before anything is cut. Project teams that sign off on the picture rather than the specification tend to meet the problems later, at handover, when doors rub, reflections distort or a bedroom reveal turns out to be narrower than the drawing showed.

If your project is ordering built-in wardrobes from a manufacturer overseas, most of these risks are settled in the approval stage, not during installation. The checklist below follows the order we usually see issues surface: opening and clearance first, then the glass itself, then the internal layout, then the documentation that lets somebody else install it correctly.

Sliding doors save the swing radius that hinged doors require, but they consume depth for the track and for the overlapping panels. Before approving a mirrored elevation, the team should confirm three numbers on the drawing: the clear opening width once the panels are stacked to one side, the total wardrobe depth including the door build-up, and the headroom above the top track.

This is where Mirror Sliding Door Wardrobes differ from a hinged alternative such as Mirrored Hinged Wardrobes. A hinged door needs clearance in front of the wardrobe; a sliding door needs tolerance inside the carcass and above the opening. In bedrooms where the bed, a doorway or an en-suite entry sits close to the wall, that difference decides which system can be used at all.

  • Panel count and stacking side: two panels give one clear opening, three give two, and the stack must not block a switch, socket or light fitting.
  • Track type: top-hung and floor-guided systems behave differently over carpet, timber and tiled thresholds, so fix the floor finish before the track is specified.
  • Ceiling and skirting conditions: a sloping or stepped ceiling, or a skirting that runs behind the carcass, changes the setting-out drawing.

"Mirror door" on a schedule is not a specification. Two rooms can receive identical carcasses and produce very different results depending on the glass, its backing and how the edges are finished.

Item to confirmWhy it matters at approval stage
Glass thickness and panel weightWeight drives the roller, track and hanger selection. A gear set chosen for a lighter panel will sag or bind under a heavier one.
Safety treatment and edge finishSliding panels are handled repeatedly and sit near sleeping areas. Polished edges, arrised corners and the safety build-up should be stated on the drawing, not assumed.
Backing, coating and frame styleThe backing and any aluminium or timber frame affect how the reflection reads under bedroom lighting and how the panel edges look from the side.
Reflection quality across a large panelFull-height panels exaggerate small flatness differences. Ask for a sample of the actual panel build, viewed standing back at bedroom distance.

Requesting one full mock-up panel before the main order is released is the cheapest way to settle all four questions. It also gives the site team a physical reference for cleaning and protection later.

The reflective front is what gets approved; the inside is what people complain about. Hanging heights, drawer positions and shelf depths should come from how the room will be used: a guest villa with short stays needs different proportions from a family bedroom or a serviced apartment with laundry in the same room.

Where layouts vary between units, modular ranges make the variation manageable. Combination Modular Wardrobes let a project mix hanging, drawer and shelf modules per room while keeping one door style across the elevation, which keeps pricing and lead times stable across unit types. For suites with their own dressing room, Boutique Style Walk in Wardrobes are a different brief again: open display, island or glass-front storage, and lighting integrated into the carcass rather than relying on the room fitting.

  • Long-hang, double-hang and shelf heights signed off against actual garment lengths, not generic defaults.
  • Drawer banks placed above or below the hanging zone in line with the client's preference for reach.
  • Integrated lighting specified with its wiring route, transformer location and access point for maintenance.

Built-in wardrobes are only as good as the site survey that produced their dimensions. When the order crosses an ocean, a wrong number is not corrected on the spot; it becomes a re-manufacture and a delayed handover.

Before releasing production, ask for a signed setting-out drawing per room: finished floor levels, finished wall finishes, exact carcass height and depth, position of doors, windows, switches and sockets, plus who measured, when, and at what stage of the building works.

Our Custom & OEM Service covers made-to-measure sizing, material and finish selection and layout tailored to each project, which is why the confirmed dimensions and selected specification for every unit have to be agreed in writing before manufacture. The same applies to finishes: a mirror panel next to a veneer or lacquer wall should be approved as a pair of samples under the room's own lighting.

Wardrobes are usually delivered flat or in panel form, and the failure mode at delivery is not damage but ambiguity: nobody on site knows which panel belongs to which room, or whether the track was supplied with the correct allowance for the floor finish that will be laid.

  • Packaging and packing list marked per room or per unit, matched to the setting-out drawings.
  • Delivery terms and delivery address confirmed, with Logistics & Door-to-Door Delivery arranged through to site rather than to port only.
  • Installation responsibility stated in the contract: our Installation & After-sales Support covers on-site fitting, inspection and snag resolution, but for some projects the local contractor fits to our drawings; both are workable, provided one party owns it.
  • Snag list agreed at handover, covering door alignment, glide quality, glass condition and drawer operation.

In practice a project team does not need to become an expert in sliding gear. Four approvals, taken in sequence, remove most of the risk: the opening and clearance drawing; one full mock-up panel of glass and frame; the internal layout per room type; and the surveyed dimensions with delivery and installation responsibility named. Anything left vague in those four will be resolved on site, at your cost.

If you are specifying built-in wardrobes for villas, apartments or hospitality rooms and want the wardrobe elevations reviewed against your drawings, send us the room dimensions and unit mix and we will come back with a specification and quotation for the ranges that fit.