A swim spa quotation only works when the buyer and the factory are reading the same sheet. Two projects can order under one model name and end up with different pumps, different jet counts and a very different electrical load. This guide walks through Outdoor Swim Spa WS-125AⅢ-U line by line — the shell, the water equipment, the options and the site interfaces — so you can see exactly what belongs in a specification before you request a price.
Start with the shell, not the features
Write down the external envelope first. For this model the catalogue lists 5500 × 2300 × 1350 mm. Those three numbers decide whether the unit fits your terrace, plant room or courtyard, how close you can run to a boundary, and which access route a crane or forklift can use on delivery day. Record the water depth separately from the overall height, because seating ledges, steps and coping all sit inside that 1350 mm envelope and change what the space actually feels like once filled.
Add three site lines at the same time: the finished ground level around the shell, the position of the equipment compartment door, and the clearance you need to open that door for servicing. Buyers who leave these out tend to discover them during installation, when the fix is expensive.
List the water side item by item
The water side is where quotations drift apart, so specify quantities rather than adjectives. For the WS-125AⅢ-U configuration shown on our site, the sheet reads:
- Water pumps: 4 pcs — state which circuit each one serves before you compare prices between configurations.
- Filter pump: 1 pc — note the run hours you expect, because filtration duty drives your energy cost more than the jets do.
- Jet total: 23 pcs — list the jet types and the zones they sit in; a count alone does not tell you where the massage effect lands.
- Control system: 1 set — say whether it is wall-mounted or remote, and who operates it day to day.
- LED lights: 1 pc — record the location and the colour requirement if the project has a lighting design.
- Total power: 11.85 kW — hand this figure to the electrical engineer early, together with your local supply voltage and phase.
One line deserves particular attention in this model: swim training system is not listed for the WS-125AⅢ-U configuration. If your brief calls for lap swimming against a current, that has to be raised as a question before the order, not assumed from the model number. The sibling configuration on our site shows a swim training system with a different pump set and jet count, which is precisely why we ask buyers to specify by configuration rather than by series name.
Separate standard equipment from options
Our catalogue marks Water jets, LED lighting and Ozone as features shown for this model. Treat that list as the starting point and then confirm what is included in your chosen build. Catalogue-listed options across the swim spa range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs a yes or no against your configuration.
Put the options into three columns in your own sheet: included as standard, quoted as an add-on, and not available for this model. That single table removes most of the arguments that appear later during handover, and it lets you compare two configurations on a like-for-like basis instead of comparing marketing paragraphs.
Cover the water, power and access interfaces
A swim spa is a small plant room, so the interface schedule matters as much as the shell. Specify the fill source and drain route, the filtration and sanitation method you have chosen, the dedicated circuit and protection device for the total connected load, and where the control system sits relative to the water. For heated or all-season installations, insulation and the heat pump selection belong in the same document as the power figures, because they change both running cost and the electrical design.
Then write out the access plan in words: the delivery route, the lifting method, the clear width of the gate or doorway, and where the equipment compartment door can be opened without removing a finished wall. Send that with the enquiry and the factory can price the whole job instead of guessing at site conditions you never described.
Tie the specification to one supplier's scope
Splitting a swim spa across several vendors creates gaps in responsibility: who owns the shell, who owns the pumps, and who answers when something fails. As a one-stop furniture and building materials supplier, SANTERSON supplies outdoor swim spas as part of a wider villa or hospitality package, covering design consultation and material selection, manufacturing and quality control, and project coordination.
If your brief needs a different envelope or a different equipment mix, our Custom & OEM Service covers bespoke sizing and configuration. Send the specification sheet you have built — dimensions, pump and jet quantities, power load, options list and site access — and we confirm what is included in your build before production starts.
A short checklist before you send the enquiry
- Envelope dimensions plus water depth, checked against your site plan.
- Pump, jet and control quantities stated as numbers, with zones noted.
- Total connected power recorded and shared with the electrical engineer.
- Swim training system confirmed in or out for your specific configuration.
- Options split into standard, add-on and not available.
- Fill, drain, sanitation, insulation and heating decisions written down.
- Delivery route, lifting method and service access described in words and drawings.
Build the sheet once and every later comparison becomes straightforward. That is how a specification stops being a brochure and starts doing its job: it fixes the scope, protects your budget, and gives the installer something they can actually build to.