A quotation for Santerson Open & Closed Combo Units usually arrives as a short document: an elevation sketch, a unit price and a delivery term. Two projects can receive nearly identical paperwork and still end up with very different results on site. The difference is rarely the number in the price column — it is whether every variable in a configurable media wall was actually fixed before the order was placed.
Because these units are made to measure rather than stocked, the proposal itself is the contract for the product. Below is the sequence we use to read one, and the specific questions that turn a vague offer into something comparable across suppliers.
1. Confirm you are being quoted from the right collection
Open and closed combinations appear in several collections on our site, and they are not interchangeable. The TV cabinets / media units version is described for residential living projects; the Santerson Storage & Display Combo under Media & TV Walls and the Santerson Mixed Open & Closed Storage under Integrated Storage Walls are described as wall systems for residential wall projects. A proposal should name the collection and product page it comes from. If it does not, ask — two suppliers quoting a “media unit with doors and shelves” may be describing different carcass depths, mounting methods and load paths.
2. Check how far the specification has been fixed
Our product pages state that finish, layout and dimensions can be specified to suit each space, which means a complete quotation should show those three items as decided, not optional. Read the proposal for:
- Dimensions. Overall width, height and depth, plus the internal dimensions of each open bay. If the unit is to be fixed to the wall rather than standing on the floor, the fixing method and the substrate it fixes into should be named.
- Layout. Which bays are open, which are closed, door type (hinged or sliding) and drawer positions — drawn to scale, not described in words.
- Materials and finish. Substrate, surface material, colour reference tied to a physical sample, edge treatment and visible hardware.
Where any of these is still “to be confirmed”, the price is provisional. That is not necessarily a problem, but it should be written as such so nobody treats a placeholder figure as a fixed cost.
3. Compare like for like, not headline prices
The fastest way to misjudge a proposal is to compare unit totals across suppliers. A lower total usually means something was left out rather than produced more cheaply. Rebuild each offer on the same basis: what is included in the price, and what sits outside it.
| Item | What to look for in the proposal |
|---|---|
| Scope of supply | Carcass, doors, shelves, back panels and hardware — and whether plinths, scribes or infill panels used to close gaps at the wall are included. |
| Services around the product | Whether site survey, design drawings, production coordination and installation sit inside the price or are billed separately. Our Interior Design Services cover space layout planning, furniture layouts with 3D renderings and project design coordination. |
| Delivery term | The point at which cost and risk transfer to you. Our Logistics & Door-to-Door Delivery service covers freight forwarding, customs paperwork, packaging and container loading; import duty and local clearance should be stated separately in any offer. |
| Change control | What happens to price and schedule if a dimension or finish changes after approval. Silence here is where disputes start. |
4. Test whether the manufacturer can make it, not just sell it
A configurable unit is only as good as the factory behind it. Ask what evidence supports the claims in the offer — which materials and finishes are produced in-house, whether a prototype or first article is available before full production, and how minimum order quantities apply to a single villa or apartment package. Our Custom & OEM Service covers custom furniture design and prototyping, bespoke material finishes and OEM manufacturing. For whole-house packages this matters more than for one unit, because the same drawings have to coordinate with built-in furniture in other rooms. A supplier that treats cabinetry as one programme rather than as separate line items saves rework later.
A useful reference is our mid-century whole-house custom cabinetry project, where built-in storage, a bay-window desk with drawers, staircase shelving and kitchen cabinets were measured on site and produced as one set in matching wood tones. Ask any manufacturer for comparable packages showing the same level of coordination.
5. Verify what happens after the goods leave the factory
Media units are where installation quality becomes visible: door alignment, gaps at the wall, and how an open bay receives equipment and cables. The proposal should say who installs, who inspects, and what is covered afterwards — warranty terms, spare parts availability and how a damaged panel is replaced. Our Installation & After-sales Support page lists on-site installation, inspection with snag lists, warranty coverage and spare parts or replacement; ask any supplier to put the same items in writing rather than describing them on a call.
6. Read the exclusions before signing
Every serious proposal lists what is not included: wall preparation, electrical first-fix, making good after installation, site access costs. Exclusions are normal — hidden exclusions are not. Before approval, confirm that open bays are sized for the equipment actually planned, that cable routes and ventilation are shown on the drawing, and that the finish samples you signed off are the ones referenced in the production order.
A proposal you can assess is one where nothing important is left to interpretation. If a supplier answers “we will confirm that later” on dimensions, fixing method, hardware or after-sales scope, treat it as an open item on your own checklist — and close it before the order enters production.
Send us the drawings and room dimensions you are working from, and we will specify an open & closed combination for that space with a fixed layout, finish schedule and quotation. As a one-stop furniture and building materials supplier, we carry that specification through production, delivery and installation.