A folding door rarely fails on day one. It fails in year two, when the leaf rubs the floor, the finish goes blotchy in sunlight or the colour no longer matches the joinery beside it. Almost all of that can be caught before production starts, by reviewing physical finish samples against a written record. Here is how we ask project teams to run that review for Classic Folding Doors and the wider folding door range.
Why a drawing is not enough
A specification drawing fixes height, width, leaf count and opening direction. It cannot tell you how a lacquer sits on a profile edge, whether a wood grain reads as warm or cold next to your wardrobe fronts, or how much sheen a handleless edge keeps after repeated use. Those are surface decisions, and surfaces only read correctly in the hand, under light.
Our folding doors are made to measure, with material and finish options and a layout tailored to each project. That flexibility is the point of the product, and it is also why the sample stage matters: the more variables you set yourself, the more you need one approved physical reference before the order enters production.
What to ask for in a finish sample pack
Ask for a pack that mirrors what will actually be installed, not a generic colour card. For each door type on the schedule we recommend:
- The door face itself. A panel of the exact board, veneer or laminate specified, sized large enough to judge at arm's length rather than as a thumbnail.
- An edge sample. Folding doors live on their vertical edges — the joint line between leaves is where cheap edging shows first. Request a sample that includes the finished edge treatment.
- The frame or casing profile. The visible perimeter sets the shadow line against the wall; match it to the door face, not just to the wall colour.
- Glass where relevant. For Santerson Glass Folding Doors, confirm tint, transparency and any surface treatment on an actual glass offcut. Tint reads very differently at 6 mm than it does in a brochure photo.
- Hardware in context. Hinges, track, handles or integrated pulls, seen against the approved door face so you can judge contrast and scale together.
For Santerson Wood Veneer Folding Doors, request two offcuts from different parts of the same species and cut. Veneer varies in figure and tone across a sheet, and a single sample tends to flatter the run.
How to test the samples on site
Take the pack to the room where the doors will be installed and check it there, not in the showroom or the site office.
- Judge it at three lighting conditions — daylight, artificial light at working level, and the evening scheme you intend to use. Lacquers shift noticeably between them.
- Hold it against the finishes that will sit beside the door: flooring, wall panelling, adjacent wardrobe or cabinet fronts. A door is only ever seen next to something else.
- Stand back two metres and then look close up. Colour works at distance; texture, sheen and edge quality only show at close range.
- Mark the orientation of grain or pattern on the sample with a pencil note. That note becomes the reference for how the leaves are assembled.
- Photograph the approved sample next to the room and keep the photo with the signed paperwork, so the record survives changes in the project team.
What to write down before you sign off
An approved sample without a written record is a verbal agreement with photos. Attach the following to the approval sheet, and ask that the same wording appears on the order confirmation:
- Sample reference or code, plus who approved it and on what date.
- Door schedule references — each opening the sample applies to, with its dimensions as confirmed for that project.
- Leaf layout and opening direction per opening, including where the folding stack parks when open.
- Finish build-up and sheen level, and whether the same finish is used on faces, edges and casing.
- Any exclusions — for example a glass type or handle you have deliberately not approved yet.
Our own cooperation steps run project brief and design proposal, then quotation and detail confirmation, then production and shipment. The finish sign-off belongs firmly in the middle stage. Once it is recorded there, production works to a fixed reference instead of an interpretation.
Common issues the sample stage catches
- Sheen mismatch between a matte door face and a semi-gloss casing, which reads as carelessness even when both are correct in isolation.
- Grain direction running the wrong way across folding leaves, which only becomes obvious once several panels stand side by side.
- Edge colour drift, where the edging is a near-match under showroom light and an obvious match failure on site.
- Glass tint overpowering the room, discovered after installation rather than against a wall finish.
- Clearance surprises at thresholds and skirtings, caught by checking the door layout against the actual floor level instead of a drawing datum.
If you are specifying folding doors for a villa, hospitality or office project, send us the door schedule together with the surrounding finishes and we will prepare a sample pack matched to that scheme before production begins. More about our custom and OEM service.