A floor-to-ceiling shelving or living wall looks simple on a drawing and is anything but simple to price. Two quotations for what appears to be the same wall can differ widely because the specification behind each one differs. If your request for quote (RFQ) leaves the details out, you get a number you cannot compare and a production run that starts with guesswork. The checklist below covers what we need from buyers specifying Santerson Floor to Ceiling Systems and the related floor-to-ceiling modular systems so that the quotation we return is accurate, comparable and ready for production.
Start With the Room Data, Not a Mood Board
These are made-to-measure built-in systems. Finish, layout and dimensions are set per project, so the survey information you send determines how precise the price can be.
| Information to supply | Why it changes the price |
|---|---|
| Overall run length, room height at high and low points, depth of the unit | Ceiling heights vary across a storey. A single nominal height will not produce panels that meet the line, so we price to measured dimensions. |
| Wall condition: substrate type, unevenness, skirting to be removed or scribed around | Scribing, packing and concealed framing are added works. They are cheap to include early and expensive to add on site. |
| Fixed obstructions: switches, sockets, radiators, downlights, sprinkler heads, beams | Each cut-out or bypass is a separate manufacturing step. Send a marked-up drawing with dimensions from two reference walls. |
| Access route to the room: lift size, stair width, door clearances, parking for delivery | This decides whether the wall ships as large modules or in panels that are assembled on site, and how much site labour is needed. |
| Country, port of entry and your Incoterms preference | We arrange sea, air and rail freight with customs paperwork and door-to-door delivery, but the route and terms must be stated to price correctly. |
Specify the Layout in Writing
Tell us what each bay does rather than describing the wall as a whole. A useful layout note names, bay by bay:
- Open shelving bays and shelf spacing, including any shelves you want fixed at set heights for books or display.
- Closed storage: doors (hinged, sliding or lift-up), drawer banks, and whether the closed sections are full height.
- Media provisions: which bay carries a television, what screen size, where the devices and their cables sit, and how many socket outlets must be reachable inside that bay.
- Integrated lighting: which shelves or niches are lit, whether the driver is accessible, and who supplies and connects the low-voltage wiring on site.
- Display niches, glass-front sections and any curved or angled returns at the end of the run.
Where a project needs bookshelves specifically rather than a mixed wall, Santerson Floor to Ceiling Bookshelves is the closer starting point, and shelf depth changes with the books you intend to store. Send the maximum item depth you need to accommodate, not just the carcass depth.
Name the Materials and Finishes You Want
Material choice is the largest single variable in the quotation. For each element, state:
- Board or carcass material and the grade you require.
- Door and panel finish — for example matte lacquer, high gloss, veneer, melamine or a glass front in an aluminium frame.
- Colour reference. A RAL number, Pantone code or a physical sample you can post removes all ambiguity; a colour name does not.
- Edge treatment and whether edges are visible on any island or return.
- Hardware brand or duty level for hinges, slides and lifts, and any soft-close requirement.
- Load expectations for shelves that will carry books, stone, ceramics or equipment.
If you have an existing joinery schedule from another supplier, send it as is. We work from schedules, and we will flag anything our factory does not produce to that standard rather than quietly substituting it.
State the Commercial Terms You Need
The following belong in the RFQ body so the quotation comes back complete:
- Quantities and unit of measure: number of walls or runs, total linear metres, and the room list if the same system repeats across units.
- Required delivery window on site and any phased handover dates by floor or building.
- Your preferred Incoterms and destination port or site address.
- Whether installation is included, who provides the trades, and which country the work is in.
- Approval route: who signs off drawings, samples and finishes, and how long approvals usually take on your projects.
- Drawing requirements: elevations only, or sections, details and electrical set-out as well.
- Payment terms and currency you intend to contract in.
What You Receive Back
For a complete enquiry we return itemised pricing by wall or module group, elevations for approval, the finish and material schedule we have priced, packing and container information, and the freight option matching your terms. Where a line is an assumption rather than a confirmed instruction, it is marked as such — which is exactly what makes two quotations comparable.
Our service runs from design consultation and space planning through material selection, manufacturing, project coordination, delivery and installation support. That means the same team that priced your wall also coordinates production and shipment against it, which reduces the change orders that normally appear between a quotation and a handover.
A note on scope: dimensions, materials, hardware and electrical provisions for floor-to-ceiling systems are confirmed project by project. We do not publish fixed specifications or lead times in advance of your drawings, because the configuration you choose sets them.
Send Us Your Schedule
If you can supply room dimensions, a layout note and a finish reference, we can price the wall. Send drawings, a joinery schedule or even photographs of the space, and we will come back with what is missing before quoting — that single step prevents most of the cost surprises buyers report on built-in projects.
SANTERSON is a China-based furniture and building materials manufacturer supplying custom built-in joinery, modular systems and fit-out products to residential and hospitality projects worldwide. Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or use our contact page to send drawings and a schedule for a quotation.