A high gloss lacquer wardrobe looks spectacular in a showroom render and disappointing on site for a handful of predictable reasons: the sheen does not match the approved sample, the door leaves do not sit square in the frame, the interior layout cannot hold what the household actually stores, or the delivery arrives without the hardware that makes the doors work. Asking the right questions before the order is placed costs an email; correcting any of those later costs a re-production.

If you are sourcing high gloss lacquer wardrobes for a villa, apartment or hotel bedroom package, the questions below cover what any manufacturer needs in writing before production starts — and what you should expect to receive back.

1. Finish and sheen: what exactly is being produced?

"High gloss" covers a wide visual range, and sprayed lacquer behaves differently from foil-wrapped or laminated panel. Before you approve anything, ask:

  • Which substrate sits under the lacquer, and which lacquer system is used — is it a sprayed lacquer finish on a board panel?
  • What colour or RAL reference is being matched, and can you send a physical sample panel rather than a screen image?
  • Is the sheen uniform across door leaves, carcass edges, and any matching matte lacquer or two tone lacquer pieces in the same room?
  • Which faces are lacquered and which are standard laminate — the back of a door leaf, the inside of a carcass, and the top panel all matter to price.

Request a signed sample you can hold against the wall finish, flooring and lighting in the actual bedroom. Gloss reads very differently under warm downlights than under daylight, and that is exactly where disputes begin.

2. Dimensions: who measured, and how are tolerances handled?

Lacquer doors cannot be trimmed on site the way a raw panel can, so measurement discipline is everything. Confirm:

  • Are you supplying made-to-measure sizing to our drawings, or will someone survey the room? If we measure, what format do you need — elevation drawings with finished floor levels and ceiling heights noted?
  • How are out-of-square walls, skirting, cornice, built-in lighting and services such as air-conditioning ducts accommodated?
  • What is the tolerance you work to, and how are scribes, filler panels or a soffit handled when a wall varies more than that?
  • Does the wardrobe run floor-to-ceiling, and if so how is it packed and secured to the wall or ceiling structure?

Get the final dimensional drawing signed off before cutting. Re-cut lacquered door leaves are expensive and slow.

3. Layout: what goes inside, and in what proportion?

A glossy exterior cannot rescue a poor interior plan. Specify how the wardrobe will actually be used:

  • How much long hanging, double hanging, drawer storage, shelf storage and open display niche do you need — and for how many people or how many rooms?
  • Are drawer slides part of the quoted price, and what fixing method, adjustment range and any soft-close feature are specified?
  • Is there provision for integrated interior lighting, a mirror panel, a jewellery tray, a trouser slide or a luggage bay?
  • For a project with several bedrooms, which layout applies to which room — and are the internal layouts consistent across units?

Where storage capacity rather than appearance drives the decision, a custom minimalist bedroom wardrobe with flat panels and an optional handleless front is worth comparing alongside a lacquered door.

4. Doors and hardware: what opens, and how much clearance does it need?

Door choice changes the room as much as the finish does. Ask which of these you are being quoted:

  • Hinged doors — how wide is each leaf, what hinge type and rating, and is there enough swing clearance from the bed, the opposite wall and any doorway?
  • Sliding doors — a high gloss sliding door wardrobe saves swing space in narrow bedrooms, so ask what the track and hanger system is, the maximum leaf width, and how the doors are lifted for adjustment or removal.
  • Glass fronts — if you want a lacquered frame with glass, ask about glass and lacquer combination wardrobes, the glass type and safety specification, and how the framing is fixed.
  • Handles or handleless — profile pulls, integrated finger pulls or push-open. Each changes the reveal between leaves and the price.

Ask for the hardware to be named by brand and model in the quotation. "Soft close included" means little without a part number you can source locally if a slide or hinge fails years later.

5. Protection, packaging and delivery

Lacquer is the finish most easily damaged in transit, and damage is usually discovered after the container is opened.

  • How are lacquered faces protected — corner protectors, edge banding, interleaved panels, a hard case for door leaves?
  • Are panels packed so that the lacquered face is not bearing on another panel during sea freight?
  • What is included in the crate list, and are hardware, handles, runners and fixings shipped loose or pre-fitted?
  • If a leaf arrives damaged, what is the replacement process and lead time, and who covers the freight?

Photograph the packing before opening, and check door leaves against the crate list on site. That record supports any claim.

6. Installation, handover and after-sales

  • Who installs — your team, ours, or a local contractor working from your assembly drawings?
  • Will we receive numbered assembly drawings and a marked-up panel schedule so each leaf is fitted to the correct opening?
  • What snag and adjustment period applies after installation, and what spare parts — drawer slides, hinges, handles, one spare leaf — ship with the order?
  • For multi-unit projects, can a first bedroom be produced and approved as a benchmark before the remaining rooms are released to production?

A pre-production sample room is the single most effective control on a project of any size. It settles colour, sheen, door feel and internal layout while changes are still cheap.

7. Commercial terms: what does the price actually include?

  • Is the quotation per linear metre, per square metre of elevation, or per unit — and does it include carcass, doors, interior fittings, hardware and lighting?
  • Which trade terms apply to delivery, and what is excluded — duties, local haulage, hoisting to an upper floor, installation labour?
  • What payment schedule applies, and at which stage does production begin?
  • Are variations in colour, size or layout priced before or after approval, and what is the cut-off date for changes?

A short checklist before you place the order

  • Signed physical finish sample matched on site under real lighting
  • Approved dimensional and elevation drawings with tolerances, skirting and services resolved
  • Internal layout agreed per room, with hardware named by brand and model
  • Door type confirmed against clearances in the actual floor plan
  • Written packing specification for lacquered faces, plus a documented damage process
  • Installation responsibility, drawings, snag period and spares confirmed in writing
  • All-in price with named exclusions and a stated change cut-off

SANTERSON manufactures lacquer wardrobes as made-to-measure built-in furniture, with finish, layout and dimensions specified to each project — so the questions above can be answered directly at quotation stage rather than discovered during production. Send your drawings, room dimensions and finish reference and we will confirm materials, door system, hardware and packing before anything is cut.

SANTERSON — furniture and building materials manufacturer, Longjiang, Shunde, Foshan, China. Contact: PHILLIP. Phone / WhatsApp: +86-13928214007. Email: santerson@qq.com. Enquiries: https://www.santerson.com/contact/