A submittal is the document package a contractor, designer or client reviews before cabinetry goes into production. For Textured Melamine Cabinets, the file has to do more than show a attractive door sample: it must let the reviewer confirm that the finish, the size and the layout match the drawings they signed off, and that anything unusual on site has been resolved in writing. Below is the checklist we work to when preparing submittals for residential kitchen projects, plus the wardrobe equivalent when the same texture runs through built-in furniture.
1. Project information and scope statement
Start with a cover page that identifies the job, not just the product: project name and address, unit or type reference, the specifier and main contractor, the revision number of the drawings your cabinetry is based on, and the date. Then state in one short paragraph what is included and what is not — for example base units, wall units and tall cabinets in scope; appliances, worktops and splashback tiles excluded. A single sentence here prevents an expensive argument at handover.
2. Shop drawings with dimensions and clearances
This is the core of the package: elevations for every wall, in scale, with overall and inter-module dimensions, door and drawer front sizes, handle or profile positions, and the setting-out dimensions your site team will use when marking out. Add plan notes for anything that affects installation — service runs behind the cabinets, skirting removal, uneven floors, ceiling heights where a tall unit meets a cornice, and socket positions relative to built-in ovens and work lighting.
Our kitchen cabinetry is made-to-measure, with layout, finish and dimensions specified to suit each space, so the submittal should record the sizes confirmed for that project rather than a catalogue range. Where a wall is out of plumb or a floor steps, show the scribe panel, filler or adjustable leg detail you intend to use instead of leaving it as an on-site decision.
3. Finish schedule and physical samples
Textured melamine is judged by eye and by hand, so the finish section carries a lot of weight. List each surface with its decorative finish name, sheen level, grain direction and the edges that will show it — door fronts, carcass edges, shelf edges and internal surfaces. Then state the substrate and the edge treatment, because two panels in the same colour can behave very differently once the edge banding and the core are on the table.
Send physical sample tiles for every visible finish, large enough to read the texture, and label each one with the project name and the line item it belongs to. Note where each finish is being used as well: light wood grains in a north-facing kitchen and dark textured fronts beside an oven run wear and read differently, so the reviewer should see the sample next to its location.
4. Hardware, interiors and appliances
Include a hardware schedule: hinges with their closing action, drawer runners and load ratings, handles or integrated profiles, lifts for upward-opening doors, and internal fittings such as pull-out larder units, corner carousels, cutlery inserts, bin housings and integrated lighting. State brands and model references where the project has specified them, and flag substitutions openly instead of burying them in a footnote.
Add an appliance schedule with the model, dimensions, ventilation requirement and door direction for every built-in unit, cross-referenced to the elevation it belongs to. This is where mismatches surface early — an oven housing at the wrong height, or a fridge door that clashes with an adjacent cabinet front.
5. Continuity across wardrobes and other built-ins
When the same textured melamine continues from the kitchen into bedrooms, hallways and laundry joinery, put those items in the submittal too. Textured Melamine Wardrobes in a matching finish should appear with their own elevations, door style and internal configuration — hanging rails, shelves, drawers, mirror or glass panels. Reviewers often approve the kitchen in one meeting and the wardrobes in another, which is how grain direction, edge colour and handle choice drift apart between rooms.
6. Assumptions, exclusions and site conditions
Write down everything you are relying on: finished floor levels set before templating, wall surfaces flat and dry, services fixed in position, and who supplies the plinth, cornice and splashback trims. Note the measurement method — drawings, site template or laser survey — and what happens if the site deviates from approved dimensions after production has started. Confirming dimensions and selected specifications for each project is a line worth repeating on the sign-off sheet.
7. Manufacturing, packing and delivery information
Close the package with the details that affect programme: production lead time for the confirmed specification, packing method and crate or carton marking so doors do not end up on the wrong floor, pallet or container count, and the delivery address with its access arrangements. As a manufacturer handling custom and OEM work, we coordinate these steps directly with the project team rather than passing them to an intermediary.
8. Sign-off block and revision control
Every page should carry the submittal or drawing number, revision and date, and each sheet needs a signature block with three clear options: approved, approved with noted comments, or resubmit. Comments must be answered in writing on the next revision — including who absorbs the cost of a change — before the order is released to the factory.
Common gaps that delay approval
- Catalogue dimensions used instead of project-specific sizes, so nothing on the drawings can be verified.
- A finish name with no physical sample and no edge or substrate detail.
- No hardware model references, leaving substitutions to be argued after order placement.
- Appliance data missing from the elevation it belongs to.
- Wardrobes and other joinery left out of the package, breaking finish continuity between rooms.
How we prepare the package
SANTERSON has been manufacturing furniture and building materials since 2008, and cabinetry submittals follow the same route as our other project work: brief and design proposal, quotation and detail confirmation, then production and shipment. Send the room drawings and your finish preference and we return elevations, a finish schedule with samples, a hardware and appliance schedule, and a clear list of assumptions for sign-off — with the wider cabinetry and interior product range specified to match.
Email santerson@qq.com or contact PHILLIP on +86-13928214007 to send your drawings and start a submittal for your project.