A full height media wall looks simple from the outside: a clean panelled surface, a television set into it, and everything else out of sight. The specification behind it is anything but simple. Because these systems are made to measure, almost every variable — size, finish, storage layout, cable routing, lighting — is something you decide rather than something you inherit from a catalogue item. Below is the list of decisions we walk buyers through when they enquire about Santerson Full Height Media Walls, and why each one is worth settling before drawings are issued.
Start with the wall, not the TV
The first question is rarely about the screen. It is about what the wall has to do. A media wall in a family living room carries toys, consoles, board games and a stack of paperwork nobody admits to owning. A media wall in a villa guest lounge carries far less, but it has to look deliberate. A media wall in a serviced apartment has to survive repeated redecoration cycles and guests who treat every drawer as a safe.
Write down the real duty before choosing anything else. That answer drives the depth of the carcass, how much closed storage you need versus open display, and whether the television should sit at eye level when seated or be raised for a standing-height viewing position in an open-plan space.
Dimensions: what to measure and confirm
Our full height media wall listings carry project-specific dimensions rather than fixed sizes, which is exactly how a built-in should work. To turn that into a working drawing, we need more than a width and a height.
- Floor to ceiling height at both ends of the run. Older properties and renovated shells are rarely square; measure at several points along the wall.
- Total run length, including returns. If the media wall turns a corner or continues into a window reveal, say so early — returns change the panel layout and the fixing detail.
- Skirting, architrave and cornice. Tell us whether these stay, get removed, or get scribed around. This is one of the most common site surprises.
- Floor build-up. If screed, underfloor heating or a new floor finish is still to come, give us the finished level rather than the slab level.
- Clearance in front of the wall. It determines whether deep shelving works or whether a shallower panelled system with floating shelves reads better.
Send photographs of the wall with something of known size in frame, plus any architectural drawing you already have. A single elevation sketch from us usually settles the whole conversation in one round.
Television integration and panel type
How the screen is handled changes the character of the wall more than any other choice:
| Approach | What it looks like in use | Best suited to |
|---|---|---|
| Integrated TV panels | The screen sits flush inside a framed recess, with the panel materials running up to its edge so the wall reads as one surface. | Living rooms and villas where the television is part of the design rather than hidden away. |
| Sliding panel TV systems | The screen is concealed behind panels that slide aside, so the wall becomes art or panelling when the television is off. | Formal lounges, hospitality suites and reception spaces where a black rectangle would dominate. |
| Wall mounted media walls | A lighter composition of panels and units fixed to the wall, with the floor left clear. | Smaller rooms and apartments where keeping the floor visible makes the space feel larger. |
Whichever route you choose, we need the screen size and — more importantly — whether you already have a model selected. Screen dimensions, VESA pattern and the depth of the mounting arm all affect the recess. If the television is not chosen yet, design the recess to a range and confirm the final cut-out before production.
Storage split: closed, open and everything in between
This is where most buyers change their minds once, so it is worth deciding deliberately. A typical specification mixes three things:
- Closed storage for the things that make a room untidy — consoles, routers, remote controls, cables, games, blankets.
- Open display for books and objects. Open display niches are the neatest way to build these into a panelled wall, because the niche becomes part of the grid instead of looking cut out of it.
- Glass-front sections, where you want to see the contents but not look at them directly. See glass front media units for this treatment.
If you want the whole wall to look like architecture rather than furniture, storage and display combo layouts let us balance the two within one continuous composition. Tell us how many consoles or set-top boxes need to live inside the wall, and whether they need ventilation and a signal path — infrared does not travel through closed doors, which is a detail best solved at the drawing stage.
Materials, finishes and hardware
Our Custom & OEM Service covers bespoke finishes and textures, so the wall can be matched to what is already specified elsewhere in the project. Practical points to settle:
- Match an existing scheme. If the media wall has to sit alongside our kitchen cabinetry or wardrobes, send the board reference or the finished item itself. Veneer and lacquer read differently at panel scale than on a door sample.
- Sheen level. High gloss near a window will show every fingerprint and every dust line; matte and textured surfaces are far more forgiving in a busy room.
- Door style and handles. Handleless fronts keep a media wall looking like panelling. If you want doors, choose hinged, sliding or flap and tell us the swing direction for each one.
- Shelf load. Tell us what goes on the shelves. Long unsupported spans carry books very differently from decorative objects, and it affects whether a divider or a hidden support is needed.
Cables, power and services — decide these before production
The single most expensive mistake on a media wall is discovering the services too late. Before we build anything, confirm:
- The position of every power point, TV point and data outlet relative to the finished wall — and whether any of them will be hidden behind the carcass.
- Where the television, internet or pay-TV feed enters the room, and whether you want a tidy internal patch panel or an external one.
- Whether speakers are in-wall, in-shelf or surface mounted. In-wall speakers need to be planned with the panel grid, not added after it arrives.
- How many devices will run, and therefore how much ventilated equipment storage is needed.
Where lighting is part of the design, our backlit feature walls and integrated cabinet lighting are both specified with the joinery so drivers, transformers and access points end up somewhere a technician can actually reach them. Confirm the electrical specification — dimming method, control system and switch location — at the same time as the layout.
How the process runs
We handle these walls the same way we handle other built-in work through our one-stop solution service: you send the wall dimensions, photographs and a note on how the room is used; we come back with a layout and finish proposal; you confirm details and we quote; then production, packing and shipment follow, with installation and after-sales support arranged through our installation and after-sales team. Freight and door-to-door delivery are handled by our logistics team, so the wall arrives on site as part of the wider package rather than as a separate headache.
Because dimensions, materials, hardware and electrical provisions are all confirmed per project, we would rather see your drawings and photographs early than guess at them later. Send us your wall and we will tell you what is missing from it.