A rendered drawing looks convincing. A competitor's price looks lower. Then the wardrobes arrive on site and the drawer fronts sit proud of each other, the fill is a shade darker than the sample board, and the carcass depth has been reduced because nobody asked what sits behind the doors. For villa and apartment packages, wardrobes are one of the highest-value built-in line items and one of the easiest to mis-specify, so the comparison work you do before signing matters more than the headline number.
This guide is written for procurement managers, contractors, designers and developer buyers who have several quotations on their desk for combination modular wardrobes and need a defensible way to choose between them. It covers what a fair sample request actually includes, how to read two proposals side by side, and which questions expose the difference between a real manufacturer and a trading intermediary.
Why combination modular wardrobes reward careful comparison
A combination modular wardrobe is not one fixed unit. It is an assembled set of modules — hanging sections, drawer-focused sections, open display bays, shelving towers, corner returns — put together to suit a specific room. In our own catalogue this is exactly what the Modular Wardrobes collection covers: made-to-measure sizing, material and finish options, and a layout tailored to each project, with variants such as Drawer Focused Modular Wardrobes and Glass Modular Wardrobes sitting in the same family.
That flexibility is the reason quotations diverge so widely. Two suppliers can price the same bedroom wall and produce very different buildings: one may hang everything on a full-height carcass with solid back panels, the other may combine shorter modules with a scribed filler. One may quote soft-close runners as standard, the other as an option. Because the specification is negotiated rather than catalogued off the shelf, comparison has to happen at the level of construction and scope — not price per line metre.
Rule of thumb: if two proposals can be compared by looking only at the total, the specifications are not detailed enough yet. Ask for the missing detail before you compare anything.
What a fair sample request should include
Samples are where most buyers go wrong, because a door swatch on its own tells you almost nothing about what will be installed. Request a sample pack that mirrors the actual build, and insist that every supplier sends the same items so the comparison is honest.
- A full door cross-section or edge sample — not just the finished face. You want to see the substrate, the edge treatment and how the finish wraps the profile.
- The matching carcass panel, in the same finish family as the doors, so you can judge colour drift between the two parts rather than discovering it on site.
- A hardware set mounted, not loose: the hinges, the runner for the drawer bank, the handle or profile pull. Mounted samples show tolerances; loose samples hide them.
- The internal finish standard — a corner of carcass showing how shelves are supported and whether the interior faces are finished on all four edges.
- A large-format panel, not a postcard. Veneers, textured melamine and high-gloss lacquer all read differently at A4 size than across a 600 mm door. Where grain direction and sheen matter, request the bigger piece.
Label every sample with the supplier name, the quoted reference code and the date it arrived. When three packs are sitting on the same table six weeks later, an unlabelled swatch is worthless — and a colour you approved from memory is a claim dispute waiting to happen.
Reading two proposals side by side
Put the quotations into one sheet with the same rows filled in for each supplier. The rows below are the ones that most often reveal why one price is lower — and whether that lower price is a saving or a scope reduction.
| Row to compare | What to look for | Why it moves the price |
|---|---|---|
| Carcass depth and height | Actual finished depth, and whether scribing to an out-of-plaster wall is included | A shallower carcass uses less panel; uneven walls are usually priced as a site variation later |
| Panel thickness and edge banding | Front, carcass and shelf thickness; edge treatment on visible faces | Thinner panels and unfinished edges cut material cost and shorten service life |
| Interior configuration per module | Number of shelves, hanging rails, drawers, trouser or shoe trays per bay | Each drawer bank is one of the more expensive elements; a "like-for-like" quote often quietly drops one |
| Hardware brand and action | Hinge and runner make, soft-close or standard, handle type, load rating on slides | Hardware is where suppliers differentiate while keeping the panel price identical |
| Door system | Hinged, sliding, pocket or folding; track and clearance requirements | Sliding systems need headroom and wall build-up that hinged doors do not |
| Finish schedule | Lacquer, acrylic, melamine, veneer — with the sample reference written into the line item | A finish shown on the drawing but not priced in the line becomes an upcharge at approval |
| Glass and illuminated elements | Glass type, tint, safety specification, integrated lighting and its transformer location | Glass fronts and LED strips are frequently quoted as provisional sums |
| Delivery terms | Packaging standard, container loading plan, port or door-to-door, who handles customs | A low ex-works price is not comparable to a delivered price unless the freight rows match |
| Site support | Whether installation, snagging and replacement parts are in scope | Local labour assumptions change the true project cost more than any panel upgrade |
Seven questions that separate manufacturers from intermediaries
For offshore sourcing, the practical risk is not price but accountability: who answers when a module is wrong, and how fast. These questions produce useful answers quickly.
- Which factory makes this, and can I visit or see a production video of this exact range? A manufacturer will answer without hesitation.
- Who draws the shop drawings, and who signs them off against my site dimensions? Ask for an example set from a comparable villa project.
- What happens if a module arrives damaged or mis-sized? Get the replacement route in writing, including who pays freight.
- Which finishes are stocked versus made to order? Made-to-order colours are where lead times slip.
- Are the samples I approved retained as the reference standard? A supplier who keeps an approved sample set is far easier to hold to it.
- How are the units packed and loaded, and how are panels identified for assembly on site? Marked, protected panels reduce installation hours dramatically.
- What is included in after-sales support, and what is excluded? Vague wording here is the single most common source of dispute.
A worked comparison: two quotes for one bedroom wall
Say both suppliers are pricing a 3.6 m run with three hanging bays, one drawer bank and an open display niche, in a matte finish with glass feature doors at the centre.
- Quote A is lower but prices two drawers instead of three, quotes standard hinges where you specified soft-close, lists the carcass 100 mm shallower than the drawing, and excludes freight and installation. Once those four items are corrected to match your brief, Quote A is no longer the cheaper option.
- Quote B is higher, but it matches the configuration, names the hardware, prices the glass front as a firm line rather than a provisional sum, and includes door-to-door delivery with marked panels. What first read as a large price gap is largely the scope you had silently assumed in both.
The lesson is not that higher quotes are better. It is that normalising scope before comparing turns an emotional decision into an arithmetic one, and it usually surfaces a genuine saving — often in hardware grade or module count rather than in the finish you actually care about.
Approval discipline: what to sign before production starts
Before any panel is cut, lock the following into one signed approval pack. This is the document you will rely on if something arrives wrong.
- Shop drawings with finished dimensions, door swing or track direction, and clearances to skirting, ceilings and services
- A finish schedule naming each surface and its approved sample reference, signed against the physical samples you hold
- The interior configuration per module, drawn — not described in a paragraph
- Hardware schedule with make, model and action for hinges, runners and handles
- Glass, lighting and transformer details, including access for maintenance
- Packaging, marking and container loading plan, plus the delivery address and terms
- A written change-control clause: what a variation costs, and how quickly it is quoted
If you are coordinating wardrobes alongside other built-ins — kitchen cabinets, vanities, media walls, doors — it is worth consolidating the approval pack across trades. One drawing set reviewed once prevents the clash between a wardrobe return and a door opening that only appears when both trades arrive on site.
How a one-stop supplier changes the comparison
When wardrobes are bought together with the rest of the fit-out, the comparison criteria shift again. A single supplier covering interior design services, custom and OEM manufacturing, logistics and door-to-door delivery and installation and after-sales support reduces the number of interfaces you manage: one drawing review, one production schedule, one container, one point of contact for snags. That is a real saving in programme and coordination effort, even where the unit rate on the wardrobe line itself is not the lowest on the table.
SANTERSON has been manufacturing furniture and building materials since 2008, supplying villa, hospitality and office projects with made-to-measure built-ins and finish options specified per project. For a wardrobe package, that means we quote against your drawings, produce shop drawings for your sign-off, and hold the approved samples as the reference through production.
Frequently asked questions
Should I ask every supplier for the same sample pack?
Yes, and specify the contents in writing when you order it. Otherwise one supplier sends a door swatch and another sends a full drawer bank with runners mounted, and nothing is comparable.
Is a made-to-measure modular wardrobe more expensive than standard sizes?
Not necessarily. Modular systems price by module and material, so a made-to-measure layout that avoids cut-down fillers and wasted bays can be cheaper than forcing standard units into an irregular room. Compare the finished configuration, not the label.
How do I check colour consistency across many rooms?
Order all wardrobe panels for a phase from one production batch where possible, keep two approved samples on site as the reference standard, and inspect doors against carcasses under the room's own lighting before signing off.
What is the single most useful line to add to a quotation request?
"State what is excluded." Suppliers rarely volunteer exclusions, and the exclusions are where your final cost will come from.
Next step
Send us your wardrobe layout — even a marked-up floor plan — together with the two or three quotations you are comparing. We will return shop drawings, an itemised specification against the comparison rows above, and a sample pack so you can see construction rather than just a finish. Contact SANTERSON through our contact page to start that review.