A quote for a U shaped walk in wardrobe rarely arrives as one number. It arrives as a stack of line items, and two quotes that look identical on the front page can describe very different wardrobes. Before you sign anything, work through the checklist below line by line — the layout notes first, because everything else in the quote is priced against them.

1. The layout drawing, not the room photo

A U shaped run wraps three walls of a dressing room, so the two return legs and the corner conditions decide how much carcass you are actually buying. Ask for a dimensioned elevation for each of the three runs, with overall external dimensions, the depth of every leg, and the finished clear opening at the central gap where you walk in and turn.

Check three things on that drawing specifically:

  • The room is square. Out-of-plumb walls are normal in existing buildings, and a quote based on nominal dimensions rather than site-measured dimensions is where the first variation order comes from.
  • How each corner is resolved — a shared carcass, a diagonal filler, or two abutting boxes with a trim. This changes both cost and how much usable depth you keep in the corner.
  • Whether the run stops at the ceiling or leaves a gap, and who is responsible for closing that gap on site.

2. How the price is built up

A made-to-measure wardrobe quote should separate the parts. If everything sits in one lump-sum line, ask for it broken down before you compare it with anything else.

  • Carcass and structure: board type and thickness for carcases, back panels and shelves, plus the edge treatment on all visible edges. Thin back panels and unfinished edges are the two most common silent downgrades.
  • Doors and fronts: whether the quoted front is a door at all, or an open hanging run. Open walk-in layouts price lower than enclosed ones, so confirm the quote matches the design you approved.
  • Interior fittings: how many hanging rails, shelves, drawers and shoe or accessory trays are included — and whether drawers are quoted as a set or per unit. Per-unit pricing is easy to under-order.
  • Hardware: hinges, drawer runners, rail fixings and any soft-close feature, named by type. Hardware is where a low quote quietly saves money.
  • Lighting and glass: if the design includes lit shelves, glazed panels or mirror fronts, these are usually quoted separately with their own transformer and wiring notes.

3. Materials and finishes in writing

Vague finish names cause disputes later. The quote should state the board material, the surface — veneer, lacquer, melamine, acrylic or glass — and the colour or grain reference. For a wardrobe that will be used daily at close range, ask which surfaces are specified as moisture- and abrasion-resistant, and confirm the edge banding matches the face material rather than a generic substitute.

Our U Shaped Walk in Wardrobes are made to measure, so dimensions, layout and finish are all specified per project. The same applies across the wider L Shaped Walk in Wardrobes and Island Walk in Wardrobes collections — if your room does not suit a three-wall run, the quote should reflect the alternative layout, not a stretched version of the U plan.

4. What is excluded

Read the exclusions before you read the total. On an overseas-supplied joinery package these are the items most often left out:

  • Site measurement and survey — confirm whether the supplier measures on site or issues a dimension sheet for your builder to complete.
  • Freight, duties and clearance. Our furniture logistics and door-to-door delivery service covers freight forwarding, customs paperwork, packing and container loading, but the quote should still state the delivery address, the Incoterms basis and whether duties are included.
  • On-site installation. Ask whether fitting is quoted separately and what preparation your builder must complete first — flooring, skirting removal, set-out of services and a level, finished floor.
  • Making good after installation, and any site protection for the wardrobe during the rest of the works.

5. Lead time stated as dates, not weeks

"10–12 weeks" means nothing until you know when the clock starts. The quote should give a production start date tied to drawing approval and payment, then separate milestones for production completion, shipment and arrival. For joinery that has to be installed before other trades return, work backwards from your site programme and confirm the arrival date against it — not the dispatch date.

6. Approval drawings and change control

Before production, you should receive shop drawings showing every elevation, the interior set-out for each leg, and the hardware schedule. Sign those, not a mood board. The quote should also state what happens when you change something after approval — a drawer added late, a finish swapped — because that is normally priced as a variation with its own lead-time impact.

If your design needs to be developed rather than simply priced, custom furniture design and prototyping is where the layout, materials and finishes get fixed before a firm number exists. Our interior design services cover space planning, drawings and production coordination for projects that start from a floor plan instead of a finished specification.

7. After the wardrobe arrives

The quote should close the loop: what is covered if a panel arrives damaged, how replacements are supplied, and who inspects on site at handover. Our installation and after-sales support covers fitting, inspection of the finished installation and spare parts supply — but ask for the warranty scope in writing so you know which components are covered and for how long.

A short comparison sheet

When you have two or three quotes, put them side by side in one table: measured dimensions used, board and finish specification, hardware named, interior fittings counted, exclusions listed, delivery basis, installation scope, production start date and arrival date. Quotes that look different in price usually look identical once you line them up like this — and the cheaper one is almost always the one that left something out of the list.

If you are pricing a dressing room for a villa or hotel project and want a quote built to this level of detail, our turnkey project solutions cover space planning, made-to-measure joinery, production and delivery to site — send us your floor plan and we will specify the U shaped run, layout and finishes for your space.