An 11.7-metre swim spa is not an impulse purchase. Before a quotation for Outdoor Swim Spa WS-S12 is approved, the buyer needs a written basis for comparison: which pump set is included, what the jet count actually covers, how the shell and cabinet are built, who handles freight and installation, and what changes when options move in or out of the package. The model below gives you a concrete reference point; the same checklist works across any long swim spa on your shortlist.

Start With the Catalog Specification, Not the Brochure Photo

The published specification for WS-S12 lists catalog dimensions of 11740 × 2200 × 1470 mm, one control system, two water pumps, one filter pump, a jet total of 73 pcs, one LED light plus 50 small LED lights, and total power of 7.65 kW, with water jets, LED lighting and ozone shown as standard features. Those numbers are the starting line for comparison, not the finish line. Two units that look identical on screen can differ in pump duty, filtration capacity and how many jets sit in the hydrotherapy zone versus the swim channel.

Ask each supplier to restate their figures in your own terms: overall footprint including steps and plant access, water volume, filtration turnover rate, and which items are included at the quoted price. If a competitor cannot state pump quantity and jet distribution, treat that as an open risk on the comparison sheet rather than an equal offer.

Check Whether a Swim Training System Is in Scope

This is the single most common mismatch in long swim spa tenders. The captured specification for WS-S12 does not list a swim training system, while the closely related Outdoor Swim Spa WS-S12-T carries the same 11740 × 2200 × 1470 mm footprint, the same two water pumps, one filter pump, 73 jets and 7.65 kW total power, with a swim training system of 1 set added to the feature list.

The practical question is what the project is for. A resort or villa wellness deck may only need a long, well-filtered water channel with jet seating. A fitness-focused installation expects continuous counter-flow swimming, and that changes the pump arrangement, the control logic and the running cost. Specify the intended use in your enquiry, then compare quotations on identical scope instead of on model names.

Compare Shell, Cabinet and Insulation Build

Long units fail on structure before they fail on styling. In this product family the shells are acrylic with structural reinforcement, and premium configurations pair an acrylic interior with a reinforced cabinet. For an 11-metre shell sitting outdoors, ask for the shell material and thickness, the framing and support layout under the base, and what insulation is provided around the cabinet and equipment bay. Insulation appears in the catalog as an option rather than a fixed item, so it must be confirmed line by line if your site runs cold nights or a heated-water schedule.

Deck and terrace conditions matter just as much. Confirm the finished weight with water, the bearing surface required, drainage around the plant compartment, and access for servicing panels. A site drawing signed before production prevents an on-site rebuild afterwards.

Read the Options List Line by Line

Catalog-listed options across this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so an option quoted on one chassis is not automatically available on another. Build your comparison table around the same option set for every bidder:

  • Water treatment: ozone as listed, plus whether UV sterilization and sand filtration are included or extra.
  • Heating: heat pump capacity, insulation package and the expected heating schedule for the climate.
  • Circulation: number and duty of water pumps, filter pump sizing, and control system arrangement.
  • Access and ambience: steps, LED lighting layout and any water features requested in the design.

Electrical requirements belong in the same table. Total power of 7.65 kW for WS-S12 tells you the load class, but supply phase, protection device, cable route and earthing must be confirmed against the selected configuration and the local installation by a qualified electrician.

Judge the Supplier on Delivery Scope, Not Just Product Price

A swim spa arrives as freight, not as a parcel. SANTERSON works as a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects, with turnkey scope running from design and production through door-to-door delivery, then installation and after-sales support. For Australia-bound projects that means freight mode, packaging and container loading, customs paperwork and delivery to site all sit in the same contract as the unit itself.

Custom and OEM service also applies where a project needs a different footprint or finish: customizable shape outdoor spa options cover square, round, oval and curved designs on an acrylic shell with structural reinforcement, which is useful when a terrace geometry will not accept a straight 11.7-metre channel. Ask for drawings and a production sign-off before tooling starts.

Confirm import terms, duties, Incoterms, insurance, transit time and the exact delivery point in writing for your case, and pin down what installation support, warranty coverage and spare parts mean in practice for your location. Marketing statements are not service guarantees until they appear in the contract.

Score Every Quote on the Same Nine Lines

Comparison lineWhat to demand from each bidder
Footprint and water depthDimensions including steps, plus depth at the swim channel and jet seating.
Pump setQuantity and duty of water pumps and filter pump, matched to water volume.
Jet layoutTotal jet count and where those jets sit in the plan.
Swim functionWhether a swim training system is included, optional or absent.
Water treatmentOzone, UV and filtration type as included items.
Shell and cabinetAcrylic specification, reinforcement, insulation and access panels.
ElectricalTotal power, supply requirements and control system arrangement.
LogisticsFreight mode, packaging, paperwork and delivery point.
After handoverInstallation support, warranty terms and spare parts supply.

Two quotations that differ by a wide margin usually differ in scope rather than value. When the nine lines above are filled in for every bidder, the gap explains itself: one price includes heating and insulation, the other does not; one includes a swim system, the other leaves it as an option.

Send Us Your Drawings for a Like-for-Like Quote

If WS-S12 fits your site, or if you need to test whether the same footprint works with a swim training system, send the terrace or deck drawing together with the intended use — fitness, hydrotherapy, hospitality leisure — and we will confirm the configuration, included equipment and electrical requirements for that scope. With more than fifteen years of manufacturing and project delivery behind our factory operations and global exports, we can hold swim spas, outdoor furniture and interior finishes on one purchase order, which keeps coordination with a single point of contact from quotation through to handover.

Contact PHILLIP at SANTERSON by email or WhatsApp (+86-13928214007) with your project drawings and required configuration, and we will return an itemised specification you can compare line for line against any other quotation.